Total AIP 1 | Total PFC 2 | |
---|---|---|
Preparing Part 150 Studies | $103,006,516 | $12,499,788 |
Part 150 Implementation | $5,718,265,215 | $3,417,815,896 |
Notes:
1 Only AIP planning figures are used for the state-by-state listings. Note that multiple Noise Exposure Maps (NEMs) and Noise Compatibility Programs (NCPs) can mean that multiple grants have been awarded. These separate grant amounts are totalled into a single sum at the beginning of the new fiscal year reporting.
2 Impose or Use. PFC planning figures not reflected in detailed state-by-state listings.