Pipeline Safety Stakeholder Communications

Pipeline Safety Connects Us All

Operator Information


Federal Inspection and Enforcement Data

BRIDGER PIPELINE LLC

(Operator ID:31878 - CURRENTLY ACTIVE OPID)

Main Operator Report Page - Incidents and Mileage - Federal Inspection and Enforcement Data - More Pipeline Operators

The reports below provide inspection and enforcement data for the most recent 5-year period. This information includes only completed (not planned or ongoing) inspections and the enforcement actions pursued at the Federal level by PHMSA on Federally-inspected mileage. The number, type, inspection days, and date of inspections conducted by PHMSA are included, as well as both a summary of and specific details pertaining to enforcement cases against this operator.

In some cases, State pipeline safety agencies also provide oversight and enforcement on certain intrastate pipeline facilities (State-inspected mileage). Inspections and enforcement by PHMSA's partner State agencies are not included in these reports; however, information on State-initiated enforcement action is available at State Pages.

For more information on each inspection type see the Inspection Activity Glossary.

BRIDGER PIPELINE LLC Federal Inspections
All Pipeline Systems(1) : 2006-2016
2016 YTD 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 Total
Site-Specific Field Inspection
Number 1 0 1 0 2 0 0 0 2 0 0 6
Days On-Site 14 0 2 0 18 0 0 0 6 0 0 40
System-Wide Program Inspection
Number 1 0 1 0 1 0 0 1 1 0 0 5
Days On-Site 10 0 4 0 5 0 0 5 8 0 0 32
Targeted Inspection/Investigation
Number 3 4 0 1 0 1 4 1 0 2 0 16
Days On-Site 5 39 0 2 0 4 25 5 0 6 0 85

Site-Specific Field Inspections - Include inspections and other compliance-related activities conducted at specific facilities or along specific lengths of pipelines ("Inspection Units"). Types of inspections/activities include on-site field verification of an operator's implementation of procedures and programs associated with corrosion control, integrity management, training and qualification, public awareness and damage prevention, control center operations, emergency preparedness and response, and other pipeline safety and compliance tasks.

System-Wide Program Inspections - Include inspections and other compliance-related activities that cover pipeline safety programs and processes that apply broadly across an operator's entire network of pipeline facilities. Types of inspections/activities include those which cover operating and maintenance procedures, integrity management and operator qualification programs, and integrated inspection of all operator safety and compliance programs.

Targeted Inspections/Investigations - Include inspections, investigations, and other activities related to specific pipeline safety areas which have been targeted for special review or emphasis. Types of activities include failure investigations, investigations into public concerns or complaints, drug and alcohol program inspections, new construction inspections, and other special-focus inspections or investigations.

For more information on each inspection type see the Inspection Activity Glossary.

For more information on each inspection type see the Inspection Activity Glossary.

BRIDGER PIPELINE LLC Federal Inspections
All Pipeline Systems(1) : 2006-2016
Start Date Category Type PHMSA Lead Region Enforcement Case(s) Initiated
06/01/16 Targeted Inspection/Investigation Specialized Inspection Western
03/07/16 Site-Specific Field Inspection Integrated Inspection Western
02/05/16 Targeted Inspection/Investigation Failure Investigation Central
01/18/16 Targeted Inspection/Investigation Construction Inspection Central
01/01/16 System-Wide Program Inspection Integrated Inspection Western
11/30/15 Targeted Inspection/Investigation Construction Inspection Central
08/10/15 Targeted Inspection/Investigation Construction Inspection Central
01/17/15 Targeted Inspection/Investigation Other Inspection Western 520155003H,520165001W
01/17/15 Targeted Inspection/Investigation Failure Investigation Western
09/03/14 Site-Specific Field Inspection Integrated Inspection Western
05/19/14 System-Wide Program Inspection Integrated Inspection Western
11/15/13 Targeted Inspection/Investigation Drug & Alcohol Inspection Western
07/18/12 Site-Specific Field Inspection Unit Inspection Central
03/28/12 Site-Specific Field Inspection Unit Inspection Western 520145017W
01/02/12 System-Wide Program Inspection Integrated Inspection Western
07/18/11 Targeted Inspection/Investigation Specialized Inspection Western
12/19/10 Targeted Inspection/Investigation Construction Inspection Central
06/22/10 Targeted Inspection/Investigation Other Inspection Western
05/17/10 Targeted Inspection/Investigation Other Inspection Western
05/17/10 Targeted Inspection/Investigation Other Inspection Western
09/14/09 Targeted Inspection/Investigation Other Inspection Western
09/14/09 System-Wide Program Inspection Integrity Management Inspection Central
07/07/08 System-Wide Program Inspection Operator Qualification Inspection Central 320085016M
06/18/08 Site-Specific Field Inspection Operator Qualification Field Verification Western
06/15/08 Site-Specific Field Inspection Unit Inspection Western 520095034
12/10/07 Targeted Inspection/Investigation Specialized Inspection Western
08/29/07 Targeted Inspection/Investigation Other Inspection Western

For more information on each enforcement type see the Enforcement Type Glossary.

BRIDGER PIPELINE LLC Federal Enforcement Cases
All Pipeline Systems(1) : 2006-2016
2016 YTD 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 Total
Cases Initiated 1 1 1 0 0 0 0 1 1 1 0 6
Cases Resolved 1 0 2 0 0 0 2 1 0 0 1 7
Penalties Proposed 0 0 0 0 0 0 0 70,000 0 0 0 70,000
Corrective Action Orders Issued 0 1 0 0 0 0 0 0 0 0 0 1

Cases Initiated: These are the yearly total of civil administrative enforcement actions that PHMSA has brought against pipeline owners and operators. It does not reflect those cases which the agency has referred to other Federal officials for criminal prosecution, nor does it include more egregious civil cases that are referred to the U.S. Department of Justice for judicial enforcement. The table shows the total number of Corrective Action Orders, Notices of Probable Violations, Notices of Amendment, Warning Letters, and Notices of Proposed Safety Orders issued in a given year.

Cases Resolved: These are the yearly total of PHMSA actions taken to resolve the various types of enforcement actions against operators. This includes the number of Corrective Action Orders, Final Orders, Notices of Amendment, and Consent Orders that have either been closed or issued in a given year. When an enforcement action is shown as "closed", PHMSA has verified that all of the corrective actions have been successfully completed and that any inadequate procedures that were identified successfully addressed. Enforcement actions shown as "issued" mean that corrective actions have been established that are acceptable to PHMSA, and that civil penalty assessments have been finalized.

For more information on each enforcement type see the Enforcement Type Glossary.

BRIDGER PIPELINE LLC Federal Enforcement Cases
All Pipeline Systems(2): 2006-2016
Case Number Date Opened Date Closed Type Subject PHMSA Region Status Proposed Penalty Assessed Penalty Collected Penalty Final Compliance Order
520165001W 02/09/16 02/09/16 Warning Letter Incident Reports - Hazardous Liquid Pipelines
WESTERN CLOSED $0 No
520155003H 01/23/15 / / Corrective Action Order
WESTERN OPEN $0 No
520145017W 11/21/14 11/21/14 Warning Letter Procedure Manuals - Hazardous Liquid Pipelines
WESTERN CLOSED $0 No
520095034 09/01/09 02/05/14 Proposed Civil Penalty
Proposed Compliance Order
Warning Letter
Construction - Hazardous Liquid Pipelines (withdrawn)
Incident Reports - Hazardous Liquid Pipelines
Operations and Maintenance - Hazardous Liquid Pipelines
Operations and Maintenance - Hazardous Liquid Pipelines (withdrawn)
Pressure Testing - Hazardous Liquid Pipelines (withdrawn)
Procedure Manuals - Hazardous Liquid Pipelines
Public Awareness - Hazardous Liquid Pipelines (withdrawn)
WESTERN CLOSED $70,000 $45,000 $45,000 Yes
320085016M 12/23/08 12/16/10 Notice of Amendment Qualification of Pipeline Personnel - Hazardous Liquid Pipelines
CENTRAL CLOSED $0 No
520075003 02/02/07 11/10/10 Proposed Compliance Order
Warning Letter
Annual Reports - Hazardous Liquid Pipelines
Construction - Hazardous Liquid Pipelines
Corrosion Control - Hazardous Liquid Pipelines
Emergency Response - Hazardous Liquid Pipelines
Operations and Maintenance - Hazardous Liquid Pipelines
Procedure Manuals - Hazardous Liquid Pipelines
Public Awareness - Hazardous Liquid Pipelines
WESTERN CLOSED $0 Yes
320055036 09/27/05 10/18/06 Letter of Concern
Proposed Compliance Order
Warning Letter

Corrosion Control - Hazardous Liquid Pipelines
Procedure Manuals - Hazardous Liquid Pipelines
Public Awareness - Hazardous Liquid Pipelines
CENTRAL CLOSED $0 Yes
520055017 03/15/05 04/14/09 Proposed Civil Penalty
Proposed Compliance Order
Qualification of Pipeline Personnel - Hazardous Liquid Pipelines
WESTERN CLOSED $100,000 $100,000 $100,000 Yes
Totals        $170,000 $145,000 $145,000  

Sources

  1. PHMSA Safety Monitoring and Reporting Tool (SMART) for the Pipeline Inspection Tracking System as of September 30, 2016.
  2. PHMSA Safety Monitoring and Reporting Tool (SMART) for the Pipeline Safety Enforcement Tracking System as of October 3, 2016.