NATURAL GAS PIPELINE CO OF AMERICA (KMI)

(Operator ID:13120 - CURRENTLY ACTIVE OPID)

Main Operator Report Page - Incidents and Mileage - Federal Inspection and Enforcement Data - More Pipeline Operators

The reports below provide inspection and enforcement data for the most recent 5-year period. This information includes only completed (not planned or ongoing) inspections and the enforcement actions pursued at the Federal level by PHMSA on Federally-inspected mileage. The number, type, inspection days, and date of inspections conducted by PHMSA are included, as well as both a summary of and specific details pertaining to enforcement cases against this operator.

In some cases, State pipeline safety agencies also provide oversight and enforcement on certain intrastate pipeline facilities (State-inspected mileage). Inspections and enforcement by PHMSA's partner State agencies are not included in these reports; however, information on State-initiated enforcement action is available at State Pages.

For more information on each inspection type see the Inspection Activity Glossary.

NATURAL GAS PIPELINE CO OF AMERICA (KMI) Federal Inspections
All Pipeline Systems(1) : 2006-2016
2016 YTD 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 Total
Site-Specific Field Inspection
Number 0 6 0 4 3 15 1 9 10 3 15 66
Days On-Site 0 44 0 24 15 56 5 36 39 6 47 271
System-Wide Program Inspection
Number 1 1 1 1 0 2 0 0 0 1 0 7
Days On-Site 4 22 9 10 0 55 0 0 0 0 0 99
Targeted Inspection/Investigation
Number 1 3 1 2 2 1 1 2 1 1 3 18
Days On-Site 0 19 6 0 16 18 0 8 22 1 2 91

Site-Specific Field Inspections - Include inspections and other compliance-related activities conducted at specific facilities or along specific lengths of pipelines ("Inspection Units"). Types of inspections/activities include on-site field verification of an operator's implementation of procedures and programs associated with corrosion control, integrity management, training and qualification, public awareness and damage prevention, control center operations, emergency preparedness and response, and other pipeline safety and compliance tasks.

System-Wide Program Inspections - Include inspections and other compliance-related activities that cover pipeline safety programs and processes that apply broadly across an operator's entire network of pipeline facilities. Types of inspections/activities include those which cover operating and maintenance procedures, integrity management and operator qualification programs, and integrated inspection of all operator safety and compliance programs.

Targeted Inspections/Investigations - Include inspections, investigations, and other activities related to specific pipeline safety areas which have been targeted for special review or emphasis. Types of activities include failure investigations, investigations into public concerns or complaints, drug and alcohol program inspections, new construction inspections, and other special-focus inspections or investigations.

For more information on each inspection type see the Inspection Activity Glossary.

For more information on each inspection type see the Inspection Activity Glossary.

NATURAL GAS PIPELINE CO OF AMERICA (KMI) Federal Inspections
All Pipeline Systems(1) : 2006-2016
Start Date Category Type PHMSA Lead Region Enforcement Case(s) Initiated
03/31/16 Targeted Inspection/Investigation Other Inspection Central
01/04/16 System-Wide Program Inspection Integrated Inspection Central
09/14/15 Site-Specific Field Inspection Integrated Inspection Southwest
09/03/15 Site-Specific Field Inspection Integrated Inspection Southwest
08/31/15 Site-Specific Field Inspection Integrated Inspection Southwest
08/17/15 Site-Specific Field Inspection Integrated Inspection Southwest
07/20/15 Site-Specific Field Inspection Integrated Inspection Southwest
07/13/15 Site-Specific Field Inspection Integrated Inspection Southwest
04/20/15 Targeted Inspection/Investigation Other Inspection Southwest
04/13/15 Targeted Inspection/Investigation Failure Investigation Southwest 420151006H
04/06/15 Targeted Inspection/Investigation Construction Inspection Central
01/12/15 System-Wide Program Inspection Integrated Inspection Southwest
05/12/14 Targeted Inspection/Investigation Other Inspection Southwest 420141010M
02/04/14 System-Wide Program Inspection Integrated Inspection Southwest
10/22/13 Site-Specific Field Inspection Integrated Inspection Central
09/26/13 Targeted Inspection/Investigation Other Inspection Central
09/24/13 Site-Specific Field Inspection Integrated Inspection Central
09/17/13 Site-Specific Field Inspection Integrated Inspection Central
08/19/13 System-Wide Program Inspection Integrated Inspection Central
06/14/13 Site-Specific Field Inspection Integrated Inspection Central 320151002,320151006W
01/16/13 Targeted Inspection/Investigation Other Inspection Southwest
06/12/12 Site-Specific Field Inspection Integrated Inspection Southwest
06/06/12 Targeted Inspection/Investigation Failure Investigation Southwest 420121011H
06/02/12 Site-Specific Field Inspection Integrated Inspection Southwest
04/23/12 Site-Specific Field Inspection Integrated Inspection Southwest
02/01/12 Targeted Inspection/Investigation Other Inspection Southwest
12/07/11 Site-Specific Field Inspection Integrated Inspection Southwest
12/05/11 Site-Specific Field Inspection Integrated Inspection Southwest
11/28/11 Site-Specific Field Inspection Integrated Inspection Southwest
11/17/11 Site-Specific Field Inspection Integrated Inspection Southwest
11/15/11 Site-Specific Field Inspection Integrated Inspection Southwest
11/07/11 Site-Specific Field Inspection Integrated Inspection Southwest
11/04/11 Site-Specific Field Inspection Integrated Inspection Southwest
10/25/11 Site-Specific Field Inspection Integrated Inspection Southwest
10/25/11 Site-Specific Field Inspection Integrated Inspection Southwest
09/28/11 Site-Specific Field Inspection Integrated Inspection Southwest
09/12/11 Site-Specific Field Inspection Integrated Inspection Southwest
08/29/11 Site-Specific Field Inspection Integrated Inspection Southwest
08/16/11 Targeted Inspection/Investigation Failure Investigation Central
05/02/11 Site-Specific Field Inspection Unit Inspection Central
05/02/11 Site-Specific Field Inspection Unit Inspection Central
05/02/11 Site-Specific Field Inspection Unit Inspection Central
04/11/11 System-Wide Program Inspection General Operations Inspection Central 320131017M
01/20/11 System-Wide Program Inspection Integrated Inspection Southwest 420121018,420121019M
10/02/10 Targeted Inspection/Investigation Failure Investigation Central
06/21/10 Site-Specific Field Inspection Unit Inspection Central 320101007W
11/17/09 Site-Specific Field Inspection Unit Inspection Central
11/17/09 Site-Specific Field Inspection Unit Inspection Central
11/17/09 Site-Specific Field Inspection Unit Inspection Central
10/30/09 Targeted Inspection/Investigation Failure Investigation Central
10/25/09 Site-Specific Field Inspection Unit Inspection Central 320101001
10/05/09 Site-Specific Field Inspection Unit Inspection Central 320101001
09/21/09 Site-Specific Field Inspection Unit Inspection Central 320101001
08/31/09 Site-Specific Field Inspection Unit Inspection Central 320101001
08/10/09 Site-Specific Field Inspection Unit Inspection Central 320101001
03/16/09 Targeted Inspection/Investigation Failure Investigation Central
02/05/09 Site-Specific Field Inspection Unit Inspection Western
11/03/08 Site-Specific Field Inspection Operator Qualification Field Verification Southwest
07/28/08 Site-Specific Field Inspection Operator Qualification Field Verification Southwest
07/24/08 Site-Specific Field Inspection Operator Qualification Field Verification Southwest
04/04/08 Site-Specific Field Inspection Operator Qualification Field Verification Southwest
03/25/08 Targeted Inspection/Investigation Other Inspection Southwest
03/17/08 Site-Specific Field Inspection Operator Qualification Field Verification Southwest
02/14/08 Site-Specific Field Inspection Unit Inspection Southwest 420091012
02/14/08 Site-Specific Field Inspection Unit Inspection Southwest 420091012
02/14/08 Site-Specific Field Inspection Unit Inspection Southwest 420091012
02/14/08 Site-Specific Field Inspection Unit Inspection Southwest 420091012
02/06/08 Site-Specific Field Inspection Unit Inspection Southwest 420091012
12/27/07 System-Wide Program Inspection General Operations Inspection Southwest
10/31/07 Site-Specific Field Inspection Unit Inspection Central
10/29/07 Site-Specific Field Inspection Unit Inspection Central
10/15/07 Targeted Inspection/Investigation Failure Investigation Central
09/13/07 Site-Specific Field Inspection Unit Inspection Central
10/30/06 Site-Specific Field Inspection Unit Inspection Southern
10/30/06 Site-Specific Field Inspection Unit Inspection Southern
10/23/06 Site-Specific Field Inspection Unit Inspection Central
10/23/06 Site-Specific Field Inspection Operator Qualification Field Verification Central
10/16/06 Site-Specific Field Inspection Operator Qualification Field Verification Central
10/16/06 Site-Specific Field Inspection Unit Inspection Central 320071005W
10/16/06 Site-Specific Field Inspection Unit Inspection Southern
10/16/06 Site-Specific Field Inspection Unit Inspection Southern
09/25/06 Site-Specific Field Inspection Unit Inspection Central
09/25/06 Site-Specific Field Inspection Unit Inspection Central
09/11/06 Site-Specific Field Inspection Unit Inspection Central
09/11/06 Site-Specific Field Inspection Operator Qualification Field Verification Central
08/14/06 Site-Specific Field Inspection Unit Inspection Southwest
08/04/06 Targeted Inspection/Investigation Failure Investigation Central
07/31/06 Site-Specific Field Inspection Unit Inspection Southwest
07/17/06 Site-Specific Field Inspection Unit Inspection Southwest
06/22/06 Targeted Inspection/Investigation Failure Investigation Southwest
04/26/06 Targeted Inspection/Investigation Other Inspection Southwest

For more information on each enforcement type see the Enforcement Type Glossary.

NATURAL GAS PIPELINE CO OF AMERICA (KMI) Federal Enforcement Cases
All Pipeline Systems(1) : 2006-2016
2016 YTD 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 Total
Cases Initiated 0 3 1 1 3 0 2 1 0 1 2 14
Cases Resolved 0 4 0 3 0 1 1 3 3 1 2 18
Penalties Proposed 0 47,500 0 0 122,700 0 0 0 0 0 0 170,200
Corrective Action Orders Issued 0 1 0 0 1 0 0 0 0 0 0 2

Cases Initiated: These are the yearly total of civil administrative enforcement actions that PHMSA has brought against pipeline owners and operators. It does not reflect those cases which the agency has referred to other Federal officials for criminal prosecution, nor does it include more egregious civil cases that are referred to the U.S. Department of Justice for judicial enforcement. The table shows the total number of Corrective Action Orders, Notices of Probable Violations, Notices of Amendment, Warning Letters, and Notices of Proposed Safety Orders issued in a given year.

Cases Resolved: These are the yearly total of PHMSA actions taken to resolve the various types of enforcement actions against operators. This includes the number of Corrective Action Orders, Final Orders, Notices of Amendment, and Consent Orders that have either been closed or issued in a given year. When an enforcement action is shown as "closed", PHMSA has verified that all of the corrective actions have been successfully completed and that any inadequate procedures that were identified successfully addressed. Enforcement actions shown as "issued" mean that corrective actions have been established that are acceptable to PHMSA, and that civil penalty assessments have been finalized.

For more information on each enforcement type see the Enforcement Type Glossary.

NATURAL GAS PIPELINE CO OF AMERICA (KMI) Federal Enforcement Cases
All Pipeline Systems(2): 2006-2016
Case Number Date Opened Date Closed Type Subject PHMSA Region Status Proposed Penalty Assessed Penalty Collected Penalty Final Compliance Order
320151006W 05/20/15 05/20/15 Warning Letter Maintenance - Gas Pipelines
CENTRAL CLOSED $0 No
320151002 04/30/15 / / Proposed Civil Penalty Integrity Management - Gas Pipelines
CENTRAL OPEN $47,500 No
420151006H 04/17/15 12/22/15 Corrective Action Order
SOUTHWEST CLOSED $0 No
420141010M 12/03/14 01/13/15 Notice of Amendment Control Room Management - Gas Pipelines
SOUTHWEST CLOSED $0 No
320131017M 08/28/13 12/16/15 Notice of Amendment Integrity Management - Gas Pipelines
Public Awareness - Gas Pipelines
CENTRAL CLOSED $0 No
420121019M 10/24/12 08/22/13 Notice of Amendment Procedure Manuals - Gas Pipelines
Qualification of Pipeline Personnel - Gas Pipelines
SOUTHWEST CLOSED $0 No
420121018 10/24/12 11/21/13 Proposed Civil Penalty
Proposed Compliance Order
Warning Item
Corrosion Control - Gas Pipelines
Emergency Response - Gas Pipelines
Operations - Gas Pipelines
Procedure Manuals - Gas Pipelines
Qualification of Pipeline Personnel - Gas Pipelines
SOUTHWEST CLOSED $122,700 $122,700 $122,700 Yes
420121011H 06/12/12 03/26/13 Corrective Action Order
SOUTHWEST CLOSED $0 No
320101007W 12/21/10 12/21/10 Warning Letter Maintenance - Gas Pipelines
Procedure Manuals - Gas Pipelines
CENTRAL CLOSED $0 No
320101001 02/25/10 06/24/11 Proposed Compliance Order
Warning Letter
Corrosion Control - Gas Pipelines
Emergency Response - Gas Pipelines
Maintenance - Gas Pipelines
Operations - Gas Pipelines
Pipeline Component Design - Gas Pipelines (withdrawn)
Procedure Manuals - Gas Pipelines
CENTRAL CLOSED $0 Yes
420091012 05/08/09 12/18/09 Proposed Compliance Order
Warning Letter
Corrosion Control - Gas Pipelines
General - Gas Pipelines
Maintenance - Gas Pipelines
SOUTHWEST CLOSED $0 Yes
320071005W 01/30/07 01/30/07 Warning Letter Maintenance - Gas Pipelines
CENTRAL CLOSED $0 No
420061012M 05/02/06 04/08/08 Notice of Amendment Emergency Response - Gas Pipelines
SOUTHWEST CLOSED $0 No
420061013 05/02/06 06/09/09 Proposed Compliance Order Procedure Manuals - Gas Pipelines
SOUTHWEST CLOSED $0 Yes
420051012 06/15/05 10/18/06 Proposed Civil Penalty
Proposed Compliance Order
Maintenance - Gas Pipelines
SOUTHWEST CLOSED $9,500 $9,500 $9,500 Yes
320051011 03/14/05 01/28/08 Letter of Concern
Proposed Compliance Order
Warning Letter

Corrosion Control - Gas Pipelines
Maintenance - Gas Pipelines
Operations - Gas Pipelines
CENTRAL CLOSED $0 Yes
320041005H 03/29/04 01/03/08 Corrective Action Order
CENTRAL CLOSED $0 No
420031008H 08/19/03 02/13/06 Corrective Action Order
SOUTHWEST CLOSED $0 No
420031005 05/14/03 06/08/09 Proposed Civil Penalty
Proposed Compliance Order
Warning Letter
Corrosion Control - Gas Pipelines
Maintenance - Gas Pipelines
Procedure Manuals - Gas Pipelines
SOUTHWEST CLOSED $31,000 $30,500 $30,500 Yes
Totals        $210,700 $162,700 $162,700  

Sources

  1. PHMSA Safety Monitoring and Reporting Tool (SMART) for the Pipeline Inspection Tracking System as of September 30, 2016.
  2. PHMSA Safety Monitoring and Reporting Tool (SMART) for the Pipeline Safety Enforcement Tracking System as of October 3, 2016.

For comments and questions on the information presented on this site, please send us feedback.

Feedback | Information Highlights | Privacy Policy | Accessibility Policy | ©2005-2016 PHMSA | DOT Home | PHMSA Home | PSA Forum | Adobe Reader | Generated: 10/06/16 04:13:43 PM