[Skip to Content]
DOT Logo
U.S. Department
of Transportation

Pipeline Safety Stakeholder Communications

Pipeline Safety Connects Us All

Operator Information


Federal Inspection and Enforcement Data

EXXONMOBIL PIPELINE CO

(Operator ID:4906 - CURRENTLY ACTIVE OPID)

Main Operator Report Page - Incidents and Mileage - Federal Inspection and Enforcement Data - More Pipeline Operators

The reports below provide inspection and enforcement data for the most recent 5-year period. This information includes only completed (not planned or ongoing) inspections and the enforcement actions pursued at the Federal level by PHMSA on Federally-inspected mileage. The number, type, inspection days, and date of inspections conducted by PHMSA are included, as well as both a summary of and specific details pertaining to enforcement cases against this operator.

In some cases, State pipeline safety agencies also provide oversight and enforcement on certain intrastate pipeline facilities (State-inspected mileage). Inspections and enforcement by PHMSA's partner State agencies are not included in these reports; however, information on State-initiated enforcement action is available at State Pages.

For more information on each inspection type see the Inspection Activity Glossary.

EXXONMOBIL PIPELINE CO Federal Inspections
All Pipeline Systems(1) : 2006-2016
2016 YTD 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 Total
Site-Specific Field Inspection
Number 0 0 2 8 1 1 2 4 0 4 4 26
Days On-Site 0 0 12 9 7 2 8 14 0 12 13 77
System-Wide Program Inspection
Number 0 0 1 1 0 1 0 0 0 4 0 7
Days On-Site 0 0 9 45 0 7 0 0 0 65 0 126
Targeted Inspection/Investigation
Number 2 2 6 2 5 8 1 2 0 4 3 35
Days On-Site 3 3 14 6 14 147 1 3 0 6 3 198

Site-Specific Field Inspections - Include inspections and other compliance-related activities conducted at specific facilities or along specific lengths of pipelines ("Inspection Units"). Types of inspections/activities include on-site field verification of an operator's implementation of procedures and programs associated with corrosion control, integrity management, training and qualification, public awareness and damage prevention, control center operations, emergency preparedness and response, and other pipeline safety and compliance tasks.

System-Wide Program Inspections - Include inspections and other compliance-related activities that cover pipeline safety programs and processes that apply broadly across an operator's entire network of pipeline facilities. Types of inspections/activities include those which cover operating and maintenance procedures, integrity management and operator qualification programs, and integrated inspection of all operator safety and compliance programs.

Targeted Inspections/Investigations - Include inspections, investigations, and other activities related to specific pipeline safety areas which have been targeted for special review or emphasis. Types of activities include failure investigations, investigations into public concerns or complaints, drug and alcohol program inspections, new construction inspections, and other special-focus inspections or investigations.

For more information on each inspection type see the Inspection Activity Glossary.

For more information on each inspection type see the Inspection Activity Glossary.

EXXONMOBIL PIPELINE CO Federal Inspections
All Pipeline Systems(1) : 2006-2016
Start Date Category Type PHMSA Lead Region Enforcement Case(s) Initiated
09/07/16 Targeted Inspection/Investigation Other Inspection Southwest
02/26/16 Targeted Inspection/Investigation Other Inspection Southwest
08/18/15 Targeted Inspection/Investigation Other Inspection Western
01/03/15 Targeted Inspection/Investigation Other Inspection Southwest
08/18/14 Targeted Inspection/Investigation Other Inspection Western
07/29/14 Targeted Inspection/Investigation Other Inspection Southwest
07/17/14 Targeted Inspection/Investigation Other Inspection Southwest
07/17/14 Targeted Inspection/Investigation Other Inspection Southwest
05/07/14 Targeted Inspection/Investigation Other Inspection Southwest
05/05/14 Targeted Inspection/Investigation Other Inspection Southwest 420145020,420145021M
03/27/14 System-Wide Program Inspection Integrated Inspection Western 520155008W
03/27/14 Site-Specific Field Inspection Integrated Inspection Western
03/24/14 Site-Specific Field Inspection Integrated Inspection Southwest
09/26/13 Targeted Inspection/Investigation Other Inspection Western
07/18/13 Site-Specific Field Inspection Integrated Inspection Southwest
07/16/13 Targeted Inspection/Investigation Other Inspection Western
07/15/13 Site-Specific Field Inspection Integrated Inspection Southwest
02/08/13 Site-Specific Field Inspection Integrated Inspection Southwest
02/08/13 Site-Specific Field Inspection Integrated Inspection Southwest
02/08/13 Site-Specific Field Inspection Integrated Inspection Southwest
02/08/13 System-Wide Program Inspection Integrated Inspection Southwest
02/08/13 Site-Specific Field Inspection Integrated Inspection Southwest
02/08/13 Site-Specific Field Inspection Integrated Inspection Southwest
02/08/13 Site-Specific Field Inspection Integrated Inspection Southwest
09/10/12 Targeted Inspection/Investigation Other Inspection Western
05/02/12 Targeted Inspection/Investigation Other Inspection Southwest
04/28/12 Targeted Inspection/Investigation Failure Investigation Southwest 420125019H
04/25/12 Targeted Inspection/Investigation Other Inspection Southwest
04/24/12 Targeted Inspection/Investigation Other Inspection Southwest
01/17/12 Site-Specific Field Inspection Integrity Management Field Verification Western
12/05/11 Targeted Inspection/Investigation Other Inspection Western 520125017M
12/05/11 Targeted Inspection/Investigation Other Inspection Western
09/13/11 Targeted Inspection/Investigation Other Inspection Southwest
07/02/11 Targeted Inspection/Investigation Other Inspection Western
07/02/11 Targeted Inspection/Investigation Failure Investigation Western 520115017H,520135007
06/06/11 Site-Specific Field Inspection Integrity Management Field Verification Western
05/23/11 Targeted Inspection/Investigation Other Inspection Western
02/24/11 System-Wide Program Inspection General Operations Inspection Southwest 420115016
01/03/11 Targeted Inspection/Investigation Other Inspection Southwest
01/03/11 Targeted Inspection/Investigation Other Inspection Southwest
10/20/10 Targeted Inspection/Investigation Other Inspection Western
02/02/10 Site-Specific Field Inspection Unit Inspection Southwest 420105018M
02/02/10 Site-Specific Field Inspection Unit Inspection Southwest 420105018M
10/05/09 Targeted Inspection/Investigation Other Inspection Headquarters
07/27/09 Site-Specific Field Inspection Unit Inspection Western 520105022W,520115003
06/10/09 Targeted Inspection/Investigation Other Inspection Southwest
04/07/09 Site-Specific Field Inspection Unit Inspection Southwest
04/01/09 Site-Specific Field Inspection Unit Inspection Southwest
03/23/09 Site-Specific Field Inspection Unit Inspection Southwest
12/14/07 Targeted Inspection/Investigation Drug & Alcohol Inspection Headquarters
08/28/07 System-Wide Program Inspection Operator Qualification Inspection Southwest 420075044M
06/29/07 System-Wide Program Inspection General Operations Inspection Southwest
05/23/07 Targeted Inspection/Investigation Other Inspection Southwest
05/17/07 Site-Specific Field Inspection Unit Inspection Southwest
04/11/07 Targeted Inspection/Investigation Other Inspection Western
04/01/07 System-Wide Program Inspection General Operations Inspection Southwest 420075032M
03/05/07 Site-Specific Field Inspection Unit Inspection Southwest
02/26/07 Site-Specific Field Inspection Integrity Management Field Verification Southwest
02/15/07 Site-Specific Field Inspection Unit Inspection Southwest
02/05/07 Targeted Inspection/Investigation Other Inspection Southwest
01/18/07 System-Wide Program Inspection Integrity Management Inspection Southwest 420075029W,420075030M
12/07/06 Targeted Inspection/Investigation Other Inspection Southwest
10/30/06 Targeted Inspection/Investigation Construction Inspection Southwest
06/20/06 Site-Specific Field Inspection Unit Inspection Western 520075001W,520075005M
06/01/06 Site-Specific Field Inspection Integrity Management Field Verification Southwest
06/01/06 Targeted Inspection/Investigation Other Inspection Southwest
03/06/06 Site-Specific Field Inspection Unit Inspection Southwest
02/20/06 Site-Specific Field Inspection Unit Inspection Southwest 420065018W

For more information on each enforcement type see the Enforcement Type Glossary.

EXXONMOBIL PIPELINE CO Federal Enforcement Cases
All Pipeline Systems(1) : 2006-2016
2016 YTD 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 Total
Cases Initiated 0 1 2 1 2 3 2 0 0 6 1 18
Cases Resolved 1 3 0 1 1 2 1 2 4 3 1 19
Penalties Proposed 0 0 0 1,700,000 0 151,100 0 0 0 0 0 1,851,100
Corrective Action Orders Issued 0 0 0 0 1 1 0 0 0 0 0 2

Cases Initiated: These are the yearly total of civil administrative enforcement actions that PHMSA has brought against pipeline owners and operators. It does not reflect those cases which the agency has referred to other Federal officials for criminal prosecution, nor does it include more egregious civil cases that are referred to the U.S. Department of Justice for judicial enforcement. The table shows the total number of Corrective Action Orders, Notices of Probable Violations, Notices of Amendment, Warning Letters, and Notices of Proposed Safety Orders issued in a given year.

Cases Resolved: These are the yearly total of PHMSA actions taken to resolve the various types of enforcement actions against operators. This includes the number of Corrective Action Orders, Final Orders, Notices of Amendment, and Consent Orders that have either been closed or issued in a given year. When an enforcement action is shown as "closed", PHMSA has verified that all of the corrective actions have been successfully completed and that any inadequate procedures that were identified successfully addressed. Enforcement actions shown as "issued" mean that corrective actions have been established that are acceptable to PHMSA, and that civil penalty assessments have been finalized.

For more information on each enforcement type see the Enforcement Type Glossary.

EXXONMOBIL PIPELINE CO Federal Enforcement Cases
All Pipeline Systems(2): 2006-2016
Case Number Date Opened Date Closed Type Subject PHMSA Region Status Proposed Penalty Assessed Penalty Collected Penalty Final Compliance Order
520155008W 03/02/15 03/02/15 Warning Letter Annual Reports - Hazardous Liquid Pipelines
WESTERN CLOSED $0 No
420145020 09/09/14 04/27/16 Proposed Compliance Order Control Room Management - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $0 Yes
420145021M 09/09/14 07/09/15 Notice of Amendment Control Room Management - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $0 No
520135007 03/25/13 07/09/15 Proposed Civil Penalty
Proposed Compliance Order
Emergency Response - Hazardous Liquid Pipelines
Integrity Management - Hazardous Liquid Pipelines
Integrity Management - Hazardous Liquid Pipelines (withdrawn)
Procedure Manuals - Hazardous Liquid Pipelines
WESTERN CLOSED $1,700,000 $1,045,000 $1,045,000 Yes
520125017M 10/10/12 03/01/13 Notice of Amendment Control Room Management - Hazardous Liquid Pipelines
WESTERN CLOSED $0 No
420125019H 05/08/12 / / Corrective Action Order
SOUTHWEST OPEN $0 No
420115016 11/07/11 / / Proposed Civil Penalty
Proposed Compliance Order
Integrity Management - Hazardous Liquid Pipelines
Integrity Management - Hazardous Liquid Pipelines (withdrawn)
Pressure Testing - Hazardous Liquid Pipelines
Pressure Testing - Hazardous Liquid Pipelines (withdrawn)
SOUTHWEST OPEN $151,100 $101,500 $101,500 Yes
520115017H 07/05/11 08/08/12 Corrective Action Order
WESTERN CLOSED $0 No
520115003 02/23/11 11/02/11 Proposed Compliance Order Construction - Hazardous Liquid Pipelines
Corrosion Control - Hazardous Liquid Pipelines
Operations and Maintenance - Hazardous Liquid Pipelines
WESTERN CLOSED $0 Yes
420105018M 11/30/10 02/09/11 Notice of Amendment Corrosion Control - Hazardous Liquid Pipelines
Operations and Maintenance - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $0 No
520105022W 07/20/10 07/20/10 Warning Letter Corrosion Control - Hazardous Liquid Pipelines
Design - Hazardous Liquid Pipelines
Emergency Response - Hazardous Liquid Pipelines
Operations and Maintenance - Hazardous Liquid Pipelines
WESTERN CLOSED $0 No
420075044M 11/27/07 02/05/08 Notice of Amendment Qualification of Pipeline Personnel - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $0 No
420075032M 08/20/07 11/29/07 Notice of Amendment Construction - Hazardous Liquid Pipelines
Corrosion Control - Hazardous Liquid Pipelines
Damage Prevention - Hazardous Liquid Pipelines
Fire Protection - Hazardous Liquid Pipelines
Operations and Maintenance - Hazardous Liquid Pipelines
Procedure Manuals - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $0 No
420075029W 08/02/07 08/02/07 Warning Letter Annual Reports - Hazardous Liquid Pipelines
Integrity Management - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $0 No
420075030M 08/02/07 02/11/08 Notice of Amendment Integrity Management - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $0 No
520075005M 02/08/07 05/20/08 Notice of Amendment Construction - Hazardous Liquid Pipelines
Corrosion Control - Hazardous Liquid Pipelines
Operations and Maintenance - Hazardous Liquid Pipelines
WESTERN CLOSED $0 No
520075001W 01/09/07 01/09/07 Warning Letter Operations and Maintenance - Hazardous Liquid Pipelines
Procedure Manuals - Hazardous Liquid Pipelines
WESTERN CLOSED $0 No
420065018W 05/02/06 05/02/06 Warning Letter Operations and Maintenance - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $0 No
420055017H 04/28/05 02/25/08 Corrective Action Order
SOUTHWEST CLOSED $0 No
520055008 02/18/05 08/06/09 Notice of Amendment
Proposed Civil Penalty
Proposed Compliance Order
Construction - Hazardous Liquid Pipelines
Corrosion Control - Hazardous Liquid Pipelines
Corrosion Control - Hazardous Liquid Pipelines (withdrawn)
Design - Hazardous Liquid Pipelines
Emergency Response - Hazardous Liquid Pipelines (withdrawn)
Operations and Maintenance - Hazardous Liquid Pipelines
Operations and Maintenance - Hazardous Liquid Pipelines (withdrawn)
Procedure Manuals - Hazardous Liquid Pipelines
Procedure Manuals - Hazardous Liquid Pipelines (withdrawn)
WESTERN CLOSED $5,000 $0   No
420045004 03/09/04 06/15/09 Proposed Civil Penalty Emergency Response - Hazardous Liquid Pipelines (withdrawn)
Operations and Maintenance - Hazardous Liquid Pipelines
SOUTHWEST CLOSED $110,000 $25,000 $25,000 No
Totals        $1,966,100 $1,171,500 $1,171,500  

Sources

  1. PHMSA Safety Monitoring and Reporting Tool (SMART) for the Pipeline Inspection Tracking System as of September 30, 2016.
  2. PHMSA Safety Monitoring and Reporting Tool (SMART) for the Pipeline Safety Enforcement Tracking System as of October 3, 2016.

For comments and questions on the information presented on this site, please send us feedback.

Feedback | Information Highlights | Privacy Policy | Accessibility Policy | ©2005-2016 PHMSA | DOT Home | PHMSA Home | PSA Forum | Adobe Reader | Generated: 10/06/16 04:13:43 PM