High Speed Intercity Passenger Rail Funding by Region

The Federal Railroad Administration, along with its 32 state partners and the District of Columbia, is laying the foundation for a 21st century passenger rail network. With $10.1 billion in federal funding available through the High-Speed Intercity Passenger Rail Program, we have invested in more than 150 planning and construction projects.

Sixty-nine construction projects amounting to $8.6 billion in funding are underway or complete in 22 states and the District of Columbia, and an additional 3 projects amounting to $960 million in funding are expected to be underway in the next six months. Eighty-two projects of all types are substantially complete, while twenty-two more are expected to be complete in the next six months.

Central Region
StateFunding SourceProject NameProject CorridorProject SummaryAwarded Funding
KS FY10 City of Lawrence, KS - Amtrak Station Improvements - PE/NEPA Amtrak Long Distance (Southwest Chief) Engineering and design work required to complete repairs and upgrades to the rail station in Lawrence, KS, used by long-distance trains between Chicago and Los Angeles. $68,757
KS FY09 Kansas Service Development Plan Kansas City - Oklahoma City Engineering and environmental analysis to support new passenger rail service between Kansas City, MO and Oklahoma City, OK. $249,534
MO ARRA West Approach Structure and Track Work for Merchants Bridge Chicago - St. Louis Construction of a new western approach to Merchants Bridge in Saint Louis, MO, in anticipation of an eventual bridge replacement to enhance safety and allow higher speeds on the Chicago-St. Louis corridor. $13,500,000
MO FY10 Missouri State Rail Plan n/a - State Rail Plan Preparation of a State Rail Plan that is compliant with the Passenger Rail Investment and Improvement Act of 2008 and Federal Railroad Administration requirements. $500,000
MO ARRA Osage River Bridge and Track Work St. Louis - Kansas City Construction of a second railroad bridge over the Osage River (existing bridge is single tracked), and installation of double track for approximately 0.5 miles on both sides of the bridge.  $20,880,717
MO FY10 St. Louis Terminal Third Main Track Construction St. Louis - Kansas City Construction of 2 new miles of third main track, including switch and signal upgrades, to improve access to the Gateway Multimodal Center station in Saint Louis, MO. $3,608,640
MO ARRA Webster Universal Crossover St. Louis - Kansas City Construction of a new track crossover in Kirkwood, MO, on the St. Louis-Kansas City corridor, allowing more efficient sharing of tracks by passenger and freight trains. $2,340,305
MO ARRA Missouri Rail Crossing Safety Improvements St. Louis - Kansas City Construction of improvements at 13 grade crossings between Sedalia and Kansas City, MO, to increase safety on the Kansas City-St. Louis corridor. $1,632,942
MO ARRA Preliminary Engineering and Environmental Review for the Construction of a Second Main Track between Lee's Summit and Pleasant Hill St. Louis - Kansas City Engineering and environmental analysis for the construction of a double track section between Lee's Summit and Pleasant Hill, MO, which would enable passing by passenger and freight trains and relieve congestion on the St. Louis-Kansas City corridor. $1,390,839
MO ARRA MO-KC to STL Corridor-Kingsville Passing Siding St. Louis - Kansas City Engineering and environmental analysis for the construction of 2 miles of side track near Kingsville, MO, to enable passing by passenger and freight trains and relieve congestion on the St. Louis-Kansas City corridor. $512,845
MO ARRA MO-KC to STL Corridor-Knob Noster Passing Siding Extension St. Louis - Kansas City Engineering and environmental analysis for construction of 9,000 feet of side track near Knob Noster, MO, to enable passing by passenger and freight trains and relieve congestion on the St. Louis-Kansas City corridor. $349,569
MO ARRA MO-KC to STL Corridor-Bonnots Mill Universal Crossover St. Louis - Kansas City Engineering and environmental analysis for the construction of a new track crossover near Bonnots Mill, MO, to increase flexibility of operations and reduce congestion on the St. Louis-Kansas City corridor. $179,985
MO ARRA MO-KC to STL Corridor-Hermann Universal Crossover St. Louis - Kansas City Engineering and environmental analysis for the construction of a new track crossover near Herrmann, MO, to relieve congestion on the St. Louis-Kansas City corridor. $184,661
OK FY10 Oklahoma Passenger and Freight Rail Plan n/a - State Rail Plan Completion of updates to Oklahoma's 1992 State Rail Plan to meet the Passenger Rail Investment and Improvement Act of 2008 and Federal Railroad Administration requirements. $375,000
OK FY10 Oklahoma City Santa Fe Station Switch Improvements Oklahoma City – Fort Worth Construction of new track, signals, and switches to enhance rail access into Oklahoma City, improving speed and safety.  $540,134
OK FY10 Tulsa - Oklahoma City Corridor Investment Plan Tulsa - Oklahoma City Engineering and environmental analysis to support new passenger rail service between Tulsa and Oklahoma City, OK. $2,242,050
TX ARRA New Core Express Service from Dallas/Fort Worth to Houston PE/NEPA Project Dallas-Fort
Worth-Houston
Engineering and environmental analysis for a proposed high-speed passenger rail line connecting Dallas-Fort Worth and Houston, TX. $15,000,000
TX FY09 Valley View Double Track Project Amtrak Long Distance (Texas Eagle) Construction of 1.5 miles of track, including a 200-foot bridge and removal of a grade crossing, to allow Amtrak to use Trinity Railway Express infrastructure, which is less congested and should yield trip-time savings. $7,189,643
TX FY10 Oklahoma City-South Texas Corridor Investment Plan Oklahoma City – Dallas/Fort Worth – South Texas Analysis of existing service between Oklahoma City, Dallas-Fort Worth, San Antonio, and several cities in South Texas, to study the feasibility of implementing new passenger rail service between these markets. $5,600,000
TX ARRA Crossing Signal Timing, Burlington Northern Santa Fe Fort Worth Sub Oklahoma City – Fort Worth Construction of upgrades to signaling equipment at grade crossings outside of Fort Worth, TX to increase the operating speed of Amtrak's Heartland Flyer. $1,833,599
Mid-Atlantic Region
StateFunding SourceProject NameProject CorridorProject SummaryAwarded Funding
DC ARRA Long Bridge Study - Washington, DC Charlotte - Raleigh - Richmond - Washington DC Engineering and environmental analysis for the replacement and/or rehabilitation of the CSX-owned Long Bridge between Washington, DC and Arlington, VA, potentially incorporating multimodal uses. $2,900,000
DC FY09 Union Station Passenger Access Improvements Northeast Corridor (DC - NYC - Boston) Design and construction of access improvements to passenger terminal facilities at Washington, DC's Union Station, to accommodate increased ridership. $4,009,659
DE FY10 Delaware Northeast Corridor Third Track Project Northeast Corridor (DC - NYC - Boston) Installation of 1.5 miles of a high-speed third track on the Northeast Corridor near Wilmington, DE, including bridge rehabilitation and replacement to relieve a chokepoint, add capacity for intercity passenger rail service, and improve on-time performance while increasing flexibility for dispatching. $13,300,000
DE FY09 Delmarva Intercity Rail Study Wilmington - Delmarva Peninsula Engineering and environmental analysis to support new passenger rail service between destinations on the Delmarva Peninsula and the Northeast Corridor. $183,820
MD ARRA Amtrak Baltimore & Potomac Tunnel - Preliminary Engineering and National Environmental Policy Act Study Northeast Corridor (DC - NYC - Boston) Engineering and environmental analysis to study the replacement and/or rehabilitation of the Baltimore & Potomac (B&P) Tunnel in Baltimore, MD, on the Northeast Corridor.  $60,000,000
MD ARRA Susquehanna Bridge Reconstruction and Expansion Project Northeast Corridor (DC - NYC - Boston) Engineering and environmental analysis to study the replacement and/or rehabilitation of the Susquehanna River Bridge in Maryland, a chokepoint that precludes capacity increases on the Northeast Corridor.  $22,000,000
MD ARRA PE/NEPA for BWI Area Improvements Northeast Corridor (DC - NYC - Boston) Engineering and environmental analysis to study the construction of an additional track to approximately nine miles of existing tracks surrounding the BWI station, and station expansion.  $9,400,000
NJ ARRA New York City to Trenton, NJ, High-Speed Rail Improvements Northeast Corridor (DC - NYC - Boston) Upgrades or replacement of catenary, power, track, and signal systems between Trenton and New York to improve operations, speeds, and reliability along the Northeast Corridor. $449,944,000
NJ ARRA Portal Bridge Capacity Enhancement Project Northeast Corridor (DC - NYC - Boston) Final design for the replacement of an existing swing-bridge over the Hackensack River with a 3-track, fixed-span bridge, plus track reconfiguration on either end of the bridge where a choke point exists on the busiest portion (Newark, NJ to New York, NY) of the Northeast Corridor. $38,497,982
PA ARRA State Interlocking Final Design / Construction Philadelphia - Harrisburg - Pittsburgh Final design and construction upgrades to tracks in and out of Harrisburg, PA on the Keystone Corridor to decrease trip time, increase on-time performance, and improve service reliability. $40,000,000
PA ARRA Keystone Corridor Grade Crossing Elimination Philadelphia - Harrisburg - Pittsburgh Final design and construction for the elimination of three public grade crossings on the Philadelphia-Harrisburg Keystone Corridor to improve speed, reliability, and safety. $11,437,213
PA ARRA Keystone Corridor Interlockings Program Philadelphia - Harrisburg - Pittsburgh Engineering and environmental analysis for the replacement and reconfiguration of tracks along the Philadelphia-Harrisburg Keystone Corridor to improve speed, reliability, and on-time performance. $6,300,000
PA ARRA Keystone Corridor ABS/Centralized Control Project Philadelphia - Harrisburg - Pittsburgh Engineering and environmental analysis for new signaling and traffic control equipment on the Philadelphia-Harrisburg Keystone Corridor, to improve speed, reliability, and on-time performance. $1,119,299
PA FY09 Keystone Corridor West High Speed Rail Study Philadelphia - Harrisburg - Pittsburgh Engineering and environmental analysis to support improved passenger rail service on the Keystone Corridor between Harrisburg and Pittsburgh, PA. $628,347
Midwest Region
StateFunding SourceProject NameProject CorridorProject SummaryAwarded Funding
IA ARRA IA - Ottumwa Sub-Crossover Improvements Amtrak Long Distance (California Zephyr) Construction of four new track crossovers in order to significantly reduce delays to passenger rail traffic in Iowa. $12,978,050
IA FY10 Chicago to Iowa City Passenger Rail Service Phase 2: Quad Cities to Iowa City Expansion  Chicago - Iowa City - Omaha  Engineering and environmental work for the initiation of new passenger rail service between Moline, IL, and Iowa City, IA, by upgrading 57 miles of track, installing new signaling and traffic control systems, and constructing one new station. This is Phase II of the creation of a new Chicago-Iowa City corridor.  $4,970,400
IA FY09 Chicago to Omaha Corridor Investment Plan Chicago - Iowa City - Omaha Engineering and environmental analysis to support new intercity passenger rail service between Chicago, IL, and Omaha, NE. $982,903
IA FY10 IA State Rail Plan - Iowa Statewide Travel Demand Model-Rail Component n/a - State Rail Plan Development of new transportation forecasting and analysis software to support the Iowa State Rail Plan. $400,000
IL ARRA CREATE P1-Englewood Flyover Project Chicago - Detroit - Pontiac Construction of a new elevated flyover track at a railroad junction on the South Side of Chicago, IL, integrating intercity passenger rail operations with commuter rail, and reducing travel delays. $125,986,998
IL FY10 Chicago-to-Iowa City: Chicago-Quad Cities Expansion Program Chicago - Iowa City - Omaha Initiation of new passenger rail service between Chicago and Moline, IL, by upgrading 74 miles of track, installing new signaling and traffic control systems, and constructing two new stations. This is Phase I of the creation of a new Chicago-Iowa City corridor. $177,280,000
IL FY09 Wadsworth Bridge Replacements Chicago - Milwaukee - Twin Cities Replacement of two bridges in northern Illinois in order to improve reliability and safety on the Chicago-Milwaukee corridor. $2,998,873
IL ARRA Chicago-St. Louis Corridor Improvement Program Chicago - St. Louis Construction and delivery of upgraded passenger rail service between Chicago, IL and St. Louis, MO, including major improvements to track, signal systems, stations, and rolling stock to increase performance, passenger comfort, and safety. $1,142,324,000
IL FY10 Supplemental Corridor Improvements Program Chicago - St. Louis Construction and delivery of upgraded passenger rail service between Chicago, IL and St. Louis, MO, including safety improvements on the corridor and major improvements to track and signal systems between Dwight and Joliet to increase performance, passenger comfort, and safety. $186,380,000
IL FY09 Chicago–St. Louis Full Build-Out Tier-1 Environmental Impact Statement (EIS) Chicago - St. Louis Engineering and environmental analysis to support increased high-speed passenger rail service, including improved performance, reliability, and safety on the Chicago-St. Louis corridor. $1,250,000
IL ARRA IL - Midwest Next Generation Passenger Rail Equipment Purchase n/a - Multiple (Chicago Hub) Acquisition of at least 48 passenger cars and approximately 7 locomotives for use on intercity rail corridors in the Midwest, improving reliability, reducing operating costs, and enabling trains to operate at higher speeds. $268,201,084
IN ARRA Indiana Gateway Project Chicago - Detroit - Pontiac Construction of 8 infrastructure projects along Norfolk Southern and Amtrak-owned rail lines in northwestern Indiana, reducing congestion on tracks shared by multiple intercity passenger rail routes. $71,364,980
MI ARRA Dearborn to Kalamazoo: Service Development Program Chicago - Detroit - Pontiac Rehabilitation of track and signal systems, following the purchase of 135 miles of track between Kalamazoo and Dearborn, MI, to significantly increase reliability and decrease trip time on the Chicago-Detroit-Pontiac corridor. $196,503,208
MI FY10 Dearborn-Kalamazoo Corridor Acquisition and Improvements Chicago - Detroit - Pontiac Purchase of 135 miles of track between Kalamazoo and Dearborn, MI, to allow upgrades to track and signal systems that will significantly increase reliability and decrease trip time on the Chicago-Detroit-Pontiac corridor. $150,000,000
MI ARRA Dearborn Intermodal Rail Facility Chicago - Detroit - Pontiac Construction of a new intermodal facility that consolidates Dearborn, MI's two passenger rail stations into a new location in the West Downtown section of the city, enhancing access to The Henry Ford Museum, a major travel destination. $ 28,198,511
MI ARRA Troy Multimodal Transit Facility Chicago - Detroit - Pontiac Construction of a new intermodal facility that will replace a currently underutilized station in Birmingham, MI to a new, more accessible site in Troy, MI, on the Chicago-Detroit-Pontiac corridor. $8,485,212
MI FY09 West Detroit Rail Improvements Chicago - Detroit - Pontiac Construction 1.3 miles of new passenger-only track between two existing rail lines, significantly streamlining passenger rail access to the Detroit area. $7,912,773
MI ARRA City of Battle Creek Intermodal Station Renovations Chicago - Detroit - Pontiac Construction of improvements to the passenger rail station in Battle Creek, MI, to ensure the facility is compliant with the Americans with Disability Act. $3,620,509
MI FY10 Chicago-to-Detroit/Pontiac Corridor Investment Plan Chicago - Detroit - Pontiac Engineering and environmental analysis for expanding high-speed passenger rail service between Chicago, IL, and Detroit and Pontiac, MI. $3,200,000
MI ARRA Preliminary Engineering and Environmental Documentation for the Ann Arbor Station Chicago - Detroit - Pontiac Engineering and environmental analysis for the design and construction of a new high-speed rail station in Ann Arbor, MI on the Chicago-Detroit-Pontiac corridor. $2,806,400
MN FY10 Union Depot Multi-Modal Transit Hub Chicago - Milwaukee - Twin Cities Rehabilitation, as part of a larger multi-agency effort, of the historic St. Paul, MN Union Depot to serve as a multimodal hub for intercity rail, future high-speed rail, local rail and bus transit, and other local modes of access.  $40,000,000
MN FY09 Tier I Environmental Impact Statement (EIS) Study for Minneapolis-St. Paul, MN, to Milwaukee, WI, High-Speed Rail Corridor Chicago - Milwaukee - Twin Cities Engineering and environmental analysis to support new passenger rail service between Minneapolis-St. Paul, MN, and Milwaukee, WI. $600,000
MN ARRA Northern Lights Express - PE/NEPA Twin Cities - Duluth Engineering and environmental analysis for the proposed Northern Lights Express, a 155-mile intercity passenger rail corridor between Minneapolis and Duluth, MN. $5,000,000
WI ARRA Milwaukee to Madison High-Speed Intercity Passenger Rail (HSIPR) Corridor: Service Development Program Chicago - Milwaukee - Twin Cities Early stages of engineering and design work executed before the cancellation of a larger program to initiate passenger rail service between Milwaukee and Madison, WI. $14,794,955
WI ARRA Chicago to Milwaukee High-Speed Intercity Passenger Rail Corridor: Truesdell Crossovers Chicago - Milwaukee - Twin Cities Construction of two track crossovers in southern Wisconsin, improving performance and reducing delays on the Chicago-Milwaukee corridor. $ 7,045,102
WI ARRA Chicago to Milwaukee High-Speed Intercity Passenger Rail Corridor: Milwaukee Airport Rail Station Platform and Canopy Extensions Chicago - Milwaukee - Twin Cities Construction of upgrades to the platforms and canopies at Milwaukee Airport Rail Station on the Chicago-Milwaukee corridor, improving passenger comfort and accessibility. $678,021
Northeast Region
StateFunding SourceProject NameProject CorridorProject SummaryAwarded Funding
CT FY10 New Haven-Hartford-Springfield Rail Program Phase 2 (New Haven - Hartford) New Haven - Hartford - Springfield Construction of 10 miles of second track in between New Haven and Meriden, CT, to increase capacity and improve performance on the New Haven-Springfield corridor. $120,900,000
CT ARRA New Haven-Springfield Corridor Second Track (Milepost 20.6 to 31.1) New Haven - Hartford - Springfield Construction of a second track near Berlin, CT, increasing capacity and improving performance on the New Haven-Springfield corridor. $40,000,000
CT ARRA Hartford-Windsor Capacity Improvement Project New Haven - Hartford - Springfield Construction of 6 miles of second track between Hartford, and Windsor, CT, in addition to a side track to allow streamlined use of the tracks by both passenger and freight trains. $30,000,000
MA ARRA Downeaster MBTA Track Improvement Project Boston - Portland - Brunswick Construction of several improvements to increase reliability and improve performance on the Boston-Brunswick Corridor, including 3 miles of new double track between Wilmington and Ballardvale, MA, and the replacement of 5 miles of existing track between Lawrence and Bradford, MA. $20,822,341
MA FY10 Boston South Station Expansion and Layover Facility Project Northeast Corridor (DC - NYC - Boston) Engineering and environmental analysis for expansion at South Station in Boston, MA, to address anticipated capacity needs for intercity rail operations in a facility shared with commuter rail traffic. $32,500,000
MA ARRA Knowledge Corridor Restore Vermonter Project Springfield - St. Albans Construction of 50 miles of new track, plus grade crossing improvements and two new station platforms between Springfield and East Northfield, MA, allowing Amtrak's Vermonter service to operate on a more direct route, serve more customers, and reduce trip times. $72,800,000
ME ARRA Downeaster-Portland North Project Boston - Portland - Brunswick Construction of approximately 30 miles of new track, plus signals, and grade crossings, to extend Amtrak's existing Downeaster service to the communities of Freeport and Brunswick, ME. $38,385,495
ME FY10 Downeaster Corridor Service Development Plan and National Environmental Policy Act Documentation Boston - Portland - Brunswick Engineering and environmental analysis to support new passenger rail service between Boston, MA, and Auburn, ME. $600,000
NH FY10 New Hampshire Capital Corridor Planning Boston - Concord Engineering and environmental analysis to support new passenger rail service between Boston, MA, and Concord, NH. $2,000,000
NY ARRA Albany - Schenectady Second Main Track New York City - Albany - Buffalo - Niagara Falls Construction of approximately 20 miles of new second track between Albany and Schenectady, NY, to improve performance and increase safety on the Empire Corridor. $91,200,000
NY ARRA Empire Corridor Capacity Improvements: Albany-Rensselaer Fourth Station Track, Hudson Line Signal Wire Relocation, and Schenectady Station Projects New York City - Albany - Buffalo - Niagara Falls Construction of track, signal, and station upgrades between Rhinecliff and Schenectady, NY, increasing average speed, improving reliability, and reducing trip times on the Empire Corridor from New York to Niagara Falls. $58,131,756
NY FY10 Syracuse Area Congestion Relief Project New York City - Albany - Buffalo - Niagara Falls Construction of track and signal upgrades to reduce delays caused by passenger and freight train interference in Syracuse, NY area. $18,546,602
NY FY10 Hudson Line Signal Wire Relocation (Phase I) New York City - Albany - Buffalo - Niagara Falls Installation of new underground signal equipment between Poughkeepsie and Redhook, NY, to increase reliability on the Empire Corridor between New York and Albany. $7,913,687
NY ARRA Rochester Station Improvement New York City - Albany - Buffalo - Niagara Falls Engineering and environmental analysis for the design and construction of a new, Americans with Disabilities Act-compliant intermodal passenger facility in Rochester, NY. $2,900,000
NY ARRA Empire Corridor South - Grade Crossing Improvements New York City - Albany - Buffalo - Niagara Falls Construction of improvements to 13 grade crossings between Poughkeepsie and Stuyvesant, NY, improving safety on the Empire Corridor. $2,450,000
NY FY10 Livingston Avenue Bridge Preliminary Engineering and Project NEPA New York City - Albany - Buffalo - Niagara Falls Engineering and environmental analysis for the replacement of a rail bridge in Albany, NY, to reduce congestion and increase reliability on the Empire Corridor between New York and Niagara Falls. $2,000,000
NY ARRA Niagara Falls Maintenance Facility Project New York City - Albany - Buffalo - Niagara Falls Engineering and environmental analysis for the proposed construction of a modern, efficient train maintenance and inspection facility in Niagara Falls, NY. $1,750,000
NY FY09 Empire Corridor Improvements - Service Development Plan, Tiered Environmental Impact Statement and Other Necessary Studies New York City - Albany - Buffalo - Niagara Falls Engineering and environmental analysis to support improved passenger rail service between Albany and Niagara Falls, NY, including increased speeds and reduced trip times along this corridor. $1,000,000
NY ARRA Empire Corridor West - Buffalo-Depew Station Improvement New York City - Albany - Buffalo - Niagara Falls Construction of improvements to the passenger rail station in Depew, NY, to ensure the facility is compliant with the Americans with Disability Act, and to improve passenger access on the Empire Corridor between New York and Niagara Falls. $770,668
NY ARRA Ballston Spa Second Main Track New York City - Albany - Montreal Construction of 2.3 miles of new double track near Saratoga Springs, NY, to reduce congestion and improve performance on intercity passenger rail trains serving Montreal, Canada, and Rutland, VT. $3,318,333
NY ARRA Harold Interlocking - Northeast Corridor Congestion Relief Project Northeast Corridor (DC - NYC - Boston) Construction of a conflict-free, grade-separated route through the heavily-congested Harold Interlocking railroad junction in Queens, New York, streamlining passenger rail traffic into New York City from along the Northeast Corridor. $294,781,579
NY ARRA Moynihan Station - Phase I Northeast Corridor (DC - NYC - Boston) Construction of new underground walkways and upgrades to ventilation systems at New York's Penn Station, the first step in a multi-agency effort to expand station capacity, which is vital to regional mobility and economic development efforts along the Northeast and Empire Corridors. $30,000,000
RI ARRA Kingston Track Capacity & Platform Improvement Project Northeast Corridor (DC - NYC - Boston) Engineering and environmental analysis for the installation of two miles of third track and installation of high-level station platforms in Kingston, RI, to reduce congestion and increase passenger accessibility on the Northeast Corridor. $26,200,000
RI ARRA Providence Station Improvement Project PE/NEPA Northeast Corridor (DC - NYC - Boston) Engineering and environmental analysis for rehabilitation of the intercity rail station in Providence, RI, to improve passenger accessibility on the Northeast Corridor. $3,000,000
VT FY09 New York-Vermont Bi-State Intercity Passenger Rail Project Albany - Rutland - Burlington Engineering and environmental analysis to support new passenger rail service between Albany, NY, and Bennington and Rutland, VT. $500,000
VT ARRA Vermonter Rehabilitation Springfield - St. Albans Rehabilitation of 190 miles of track between St. Albans and Vernon, VT, on the Vermonter corridor, increasing reliability and reducing trip times. $52,722,258
South Region
StateFunding SourceProject NameProject CorridorProject SummaryAwarded Funding
AL FY09 Birmingham-Montgomery-Mobile Intercity Passenger Rail Feasibility Study Birmingham - Montgomery - Mobile Feasibility study for the development of a proposed intercity passenger rail corridor in Alabama between Birmingham and Montgomery, with a potential extension to Mobile. $100,000
FL ARRA Florida High-Speed Rail – Phase I, Tampa-Orlando Tampa - Orlando - Miami Engineering work required to implement 84 miles of track, station improvements, and acquisition of five train sets, to provide for 16 daily round-trips at maximum and average speeds of 186mph and 100mph, respectively.  $31,892,085
GA FY09 Evaluation of High-Speed Rail Options in the Atlanta - Birmingham Corridor Atlanta - Birmingham Feasibility study for the development of a proposed high-speed intercity passenger rail corridor between Birmingham, AL and Atlanta, GA. $249,489
GA FY10 Atlanta - Charlotte Corridor Investment Plan Atlanta - Charlotte Engineering and environmental analysis for the development of the Southeast High Speed Rail Corridor between Charlotte, NC and Atlanta, GA. $4,100,000
GA FY09 Evaluation of High-Speed Rail Options in the Atlanta - Nashville - Louisville Corridor Atlanta - Chattanooga - Nashville - Louisville Feasibility study for the development of a proposed high-speed intercity passenger rail corridor between Chicago, IL and Atlanta, GA along a route serving Louisville, KY and Nashville and Chattanooga, TN. $249,489
GA FY09 Evaluation of High-Speed Rail Options in the Atlanta - Macon - Jacksonville Corridor Atlanta - Macon - Savannah - Jacksonville Feasibility study for the development of a proposed high-speed intercity passenger rail corridor in Georgia between Atlanta and Jacksonville, FL along a route also serving Macon and Savannah, GA. $249,489
NC ARRA NCDOT Piedmont Third and Fourth Frequency Program Charlotte - Raleigh - Richmond - Washington DC Construction of railroad capacity and station upgrades to improve schedule reliability and service quality, and to expand passenger service to four daily round trips on the Piedmont Corridor between Raleigh and Charlotte, NC.  Investments will improve railroad and roadway safety in North Carolina by constructing 12 highway-rail grade separations and closing up to 50 at-grade crossings along the corridor. $520,000,000
NC ARRA NCDOT Intercity Passenger Rail Congestion Mitigation Charlotte - Raleigh - Richmond - Washington DC Construction of four new railroad interlockings on the CSX railroad corridor between Rocky Mount and Selma, NC and at the intersection of the CSX and NS railroads in Raleigh, NC to improve capacity, schedule reliability and service quality for freight and passenger trains in North Carolina. $26,560,839
NC FY10 NCDOT Piedmont Improvement Program Sugar Creek Road Grade Separation Charlotte - Raleigh - Richmond - Washington DC Engineering, environmental review and construction of a highway-rail grade separation for Sugar Creek Road in North Charlotte, NC, to improve road and rail safety. $22,000,000
NC ARRA Southeast High Speed Rail Corridor PE/NEPA - Richmond, VA to Raleigh, NC Charlotte - Raleigh - Richmond - Washington DC Engineering and environmental analysis for the development of the Southeast High-Speed Rail Corridor between Richmond, VA and Raleigh, NC. $4,000,000
VA ARRA Arkendale to Powell's Creek Third Track Charlotte - Raleigh - Richmond - Washington DC Construction of 11 miles of a third mainline track near Quantico, VA to improve capacity, schedule reliability, and service quality for freight, commuter and passenger trains on the CSX-owned railroad corridor between Washington, DC and Richmond, VA. $74,840,119
VA FY10 Southeast High-Speed Rail I-95 Corridor PE/NEPA - Washington, DC to Richmond, VA Charlotte - Raleigh - Richmond - Washington DC Engineering and environmental analysis for the development of the Southeast High-Speed Rail Corridor between Washington, DC and Richmond, VA. $44,308,000
WV FY09 WVDOT State Rail Plan n/a - State Rail Plan Planning and engineering study to develop a comprehensive State Rail Plan for the freight and passenger rail network in West Virginia. $666,662
Southwest Region
StateFunding SourceProject NameProject CorridorProject SummaryAwarded Funding
CA ARRA Yolo West Crossover CA - Capitol Corridor Construction of a new track crossover and signals to allow for more flexible operations on the San Jose-Sacramento Capitol Corridor. $4,654,759
CA FY10 California Pacific Coast Corridor Proposed Coast Daylight Service Investment Plan CA - Coast Daylight Engineering and environmental analysis to support new passenger rail service between Los Angeles and San Francisco, CA, using existing infrastructure. $300,000
CA ARRA California High-Speed Train Program ARRA Grant CA - High-Speed Rail Engineering and environmental analysis for the early phase(s) of the California High-Speed Train System, as well as station area planning, and construction of the initial Central Valley section. $2,552,556,231
CA FY10 Initial Central Valley Section: Madera County to Bakersfield (Kern County) of the California High-Speed Train Program CA - High-Speed Rail Construction and delivery of the initial Central Valley section of the California High-Speed Train system. $928,620,000
CA ARRA Train Box: Part of Phase I - Transbay Transit Center (TTC) within the Transbay Program CA - High-Speed Rail Construction of the underground level of the Transbay Transit Center project in downtown San Francisco, CA, in anticipation of the arrival of the California High-Speed Train system. $400,000,000
CA FY10 California High-Speed Train System - San Francisco to San Jose Project Section: Communications-Based Overlay Signal System/PTC System Project CA - High-Speed Rail Design and development of new signaling and traffic control systems, for use on the San Francisco-San Jose High-Speed Rail Corridor. $15,999,995
CA FY10 CA - Statewide Rolling Stock Acquisition (FY10) CA - Multiple Corridors Acquisition of at least 15 passenger cars and approximately four locomotives for use on intercity rail corridors in California, enabling trains to accommodate increasing ridership, improve reliability, reduce operating costs, and operate at higher speeds. $100,000,000
CA ARRA CA - Statewide Rolling Stock Acquisition (ARRA) CA - Multiple Corridors Acquisition of at least 27 passenger cars and approximately two locomotives for use on intercity rail corridors in California, enabling trains to accommodate increasing ridership, improve reliability, reduce operating costs, and operate at higher speeds. $68,000,000
CA ARRA San Jose South Terminal Station Improvement Project CA - Multiple Corridors Construction of two new platforms, installation of upgraded passenger information systems, and construction of new track and signal systems at San Jose, CA's Diridon Station. $17,999,998
CA ARRA Rolling Stock - Locomotive Emissions Upgrade CA - Multiple Corridors Rebuild/upgrade 15 train engines, for use on intercity passenger rail corridors in California, to reduce emissions and improve air quality. $13,295,511
CA ARRA Rolling Stock-Cab Car Bicycle Storage CA - Multiple Corridors Reconfiguration of 14 railcars to enlarge space available for bicycle storage, while maintaining ADA accessibility and luggage storage space. $8,230,000
CA FY09 Sacramento Intermodal Facility Phase I-Track Relocation Project CA - Multiple Corridors Realignment of existing mainline rail tracks as the first phase of a three-phase project to expand the existing Sacramento Intermodal Facility into a state-of-the-art multimodal regional transportation center. $6,200,000
CA ARRA Los Angeles to Fullerton Triple Track - Segment 7 CA - Pacific Surfliner Construction of 3.8 miles of new track between the cities of Pico Rivera and Santa Fe Springs in Los Angeles County, CA, contributing to efforts to connect Los Angeles and Fullerton with a triple-tracked route, which will increase capacity on the line. $28,422,368
CA FY09 San Onofre - San Diego PTC Implementation CA - Pacific Surfliner Implementation of new Positive Train Control signaling and traffic control equipment between San Diego and San Onofre, CA, to enhance safety on the San Diego-Los Angeles-San Luis Obispo Pacific Surfliner corridor. $24,900,000
CA FY09 Moorpark-San Onofre Signal and Communication System Improvements for PTC CA - Pacific Surfliner Implementation of new Positive Train Control signaling and traffic control equipment between Moorpark and San Onofre, CA, to enhance safety on the Pacific Surfliner corridor. $13,500,000
CA FY10 Pacific Surfliner Elvira to Morena Double-Track Preliminary Engineering/National Environmental Policy Act CA - Pacific Surfliner Engineering and environmental analysis for the addition of 2.6 miles of new track in San Diego, including four railway bridges, to add capacity and mitigate congestion along the Los Angeles-San Diego Pacific Surfliner corridor. $10,000,000
CA ARRA Pacific Surfliner - Railroad Crossover Program CA - Pacific Surfliner Construction of new track crossovers in San Diego to allow for more flexible operations on the Los Angeles-San Diego Pacific Surfliner Corridor. $5,677,409
CA FY10 San Dieguito Bridge and Del Mar Platform Preliminary Engineering/National Environmental Policy Act CA - Pacific Surfliner Engineering and environmental analysis for the addition of 1.1 miles of new track in Del Mar, CA, including a new rail bridge and signal improvements to improve service on the Los Angeles-San Diego Pacific Surfliner corridor. $7,000,000
CA FY10 Pacific Surfliner Eastbrook to Shell Double-Track Bridge Preliminary Engineering/National Environmental Policy Act CA - Pacific Surfliner Engineering and environmental analysis for the addition of 1.9 miles of new track in Oceanside, CA, including a new rail bridge over the San Luis Rey River, to improve service on the Los Angeles-San Diego Pacific Surfliner Corridor. $4,000,000
CA ARRA Pacific Surfliner - Oceanside Pass-Through Track Project CA - Pacific Surfliner Construction of a new track at the Oceanside Transit Center to facilitate more efficient traffic in an area of overlapping intercity and commuter service. $3,400,000
CA FY10 Pacific Surfliner Sorrento to Miramar Phase 2 Double-Track Preliminary Engineering/National Environmental Policy Act CA - Pacific Surfliner Engineering and environmental analysis for the addition of 2.1 miles of a new second track between Sorrento and Miramar, CA, to improve service on the Los Angeles-San Diego Pacific Surfliner Corridor. $3,142,000
CA FY10 Raymer-to-Bernson Double-Track Preliminary Engineering/National Environmental Policy Act CA - Pacific Surfliner Engineering and environmental analysis for the addition of 6 miles of new track in the Los Angeles, CA area, as well as new bridges, grade crossings, platforms, and other station improvements, to improve service on the Pacific Surfliner Corridor. $1,477,021
CA ARRA Pacific Surfliner – Maintenance-of-Way Spurs CA - Pacific Surfliner Construction of two new track spurs in Orange County, CA, improving intercity passenger rail services by minimizing maintenance delays on the Los Angeles-San Diego Pacific Surfliner Corridor. $1,377,831
CA FY10 LOSSAN North Rail Corridor Investment Plan CA - Pacific Surfliner Engineering and environmental analysis to support improved passenger rail service on the Pacific Surfliner Corridor between Los Angeles and San Luis Obispo, CA. $1,360,000
CA ARRA Pacific Surfliner Corridor-PE NEPA Ortega CA - Pacific Surfliner Engineering and environmental analysis for the reconstruction of 7,000 feet of track near Santa Barbara, CA, that had been removed due to erosion and storm damage, to alleviate congestion and improve safety. $950,000
CA FY10 Seacliff Track Realignment and Siding Extension Preliminary Engineering/National Environmental Policy Act CA - Pacific Surfliner Engineering and environmental analysis for the construction of 10,000 feet of track near Santa Barbara, CA, and the realignment of existing tracks away from eroding cliffs to alleviate congestion and improve safety. $950,000
CA FY10 Van Nuys North Platform Preliminary Engineering/National Environmental Policy Act CA - Pacific Surfliner Engineering and environmental analysis for improvements to the Van Nuys Boulevard station in Los Angeles, CA, to enhance passenger access to the station and improve service on the Surfliner Corridor. $593,589
CA FY10 Pacific Surfliner Carlsbad Village Double-Track PE/NEPA CA - Pacific Surfliner Engineering and environmental analysis for the construction of 5.4 total miles of new track in four locations between Carlsbad and San Diego, CA, improving travel time and on-time performance on the Pacific Surfliner Corridor, and benefiting Coaster commuter services. $400,000
CA FY09 Pacific Surfliner Corridor Strategic Assessment Implementation Plan CA - Pacific Surfliner Analysis of proposed improvements along the Pacific Surfliner Corridor in anticipation of a future corridor investment program. $200,000
CA FY10 San Joaquin Corridor Investment Plan CA - San Joaquin Engineering and environmental analysis to support improved passenger rail service between Oakland, Sacramento, and Bakersfield, CA, on the San Joaquin Corridor. $299,589
CA FY10 California State Rail Plan n/a - State Rail Plan Completion of a State Rail Plan in accordance with the Passenger Rail Investment and Improvement Act of 2008 and Federal Railroad Administration requirements. $1,500,000
CO FY09 Colorado Regional Interconnectivity Study n/a - Multiple (Denver Hub) Engineering and environmental analysis to support new passenger rail service within Colorado, including the Denver area. $998,361
CO FY09 Colorado Comprehensive Statewide Freight and Passenger Rail Plan n/a - State Rail Plan Completion of the State Rail Plan in accordance with the Passenger Rail Investment and Improvement Act of 2008 and Federal Railroad Administration requirements. $377,848
NM FY09 New Mexico State Rail Plan n/a - State Rail Plan Completion of a State Rail Plan in accordance with the Passenger Rail Investment and Improvement Act of 2008 and Federal Railroad Administration requirements. $100,000
NV FY10 Nevada State Rail Plan n/a - State Rail Plan Preparation of a State Rail Plan that is compliant with the Passenger Rail Investment and Improvement Act of 2008 and Federal Railroad Administration requirements. $545,272
West Region
StateFunding SourceProject NameProject CorridorProject SummaryAwarded Funding
ID FY10 Idaho Passenger and Freight Rail Plan n/a - State Rail Plan Completion of a State Rail Plan in accordance with the Passenger Rail Investment and Improvement Act of 2008 and Federal Railroad Administration requirements. $199,788
OR ARRA Portland Union Station Rehabilitation Eugene - Portland - Seattle - Vancouver BC Reinforcement and historic preservation of Union Station in Portland, OR, improving passenger accessibility and safety. $7,240,582
OR FY10 Oregon Corridor Investment Plan: Pacific Northwest Rail Corridor Oregon Segment, Eugene to Portland Eugene - Portland - Seattle - Vancouver BC Engineering and environmental analysis to support increased passenger rail service between Eugene and Portland, OR. $4,200,000
OR FY10 Portland Union Station Tracks & Building: Preliminary Engineering and Environmental Review Eugene - Portland - Seattle - Vancouver BC Engineering and environmental analysis for improvements at Union Station in Portland, OR, designed to enable passenger rail service to operate more efficiently, and to improve passenger accessibility and safety. $3,967,243
OR ARRA Eugene Stub Tracks:  Preliminary Engineering and Environmental Review Eugene - Portland - Seattle - Vancouver BC Engineering and environmental analysis for proposed stub tracks in Eugene, OR, which would allow increased capacity and efficiency on the Pacific Northwest corridor. $1,500,000
OR ARRA North Portland & Peninsula Junction Connection Improvements: Preliminary Engineering and Environmental Review Eugene - Portland - Seattle - Vancouver BC Engineering and environmental analysis for new track connections in North Portland, OR that would allow higher speeds and shorter trip times on the Pacific Northwest corridor. $1,288,805
OR ARRA Willbridge Crossovers: Preliminary Engineering and Environmental Review Eugene - Portland - Seattle - Vancouver BC Engineering and environmental analysis for the replacement of track switches in Willbridge, OR, that will improve performance and speed on the Pacific Northwest corridor $274,146
OR FY10 Oregon State Rail Plan n/a - State Rail Plan Completion of the State Rail Plan in accordance with the Passenger Rail Investment and Improvement Act of 2008 and Federal Railroad Administration requirements. $741,809
WA ARRA Pacific Northwest Rail Corridor Program Eugene - Portland - Seattle - Vancouver BC Construction and delivery of upgrades intended to increase frequency, reduce travel time, and improve performance on the Pacific Northwest Rail Corridor in Washington State. Work includes track and signal improvements, acquisition of new equipment, and station upgrades. $751,575,100
WA FY10 King Street Station Seismic Retrofit Eugene - Portland - Seattle - Vancouver BC Installation of steel to reinforce the clock tower and main hall of King Street Station in Seattle, WA, as well as other upgrades to improve safety and passenger experience as part of a larger restoration effort to accommodate increased ridership. $16,209,802
WA ARRA Vancouver-Port Access Rail Improvements Eugene - Portland - Seattle - Vancouver BC Construction of new tracks to allow freight trains to access the Port of Vancouver, WA, without disrupting passenger rail service on the Seattle-Portland corridor, improving performance and reliability. $12,644,065
WA FY09 Tukwila Station Improvements Eugene - Portland - Seattle - Vancouver BC Construction of a new station building in Tukwila, WA, and development of new passenger information communications systems, to accommodate increased ridership to and from SEA-TAC international airport. $6,905,092
WA FY09 PNWRC-Mount Vernon Siding Extension Eugene - Portland - Seattle - Vancouver BC Construction of 4,000 feet of new track and signal improvements in Mount Vernon, WA, enabling more efficient operation of freight and passenger services in the area. $3,258,836
WA FY10 Washington State Rail Plan n/a - State Rail Plan Completion of a State Rail Plan in accordance with the Passenger Rail Investment and Improvement Act of 2008 and Federal Railroad Administration requirements. $400,000

 

 