Research & Development Program
Time: 11/01/2016 01:27 AM

Final Reports

Report Date File Name File Size
Project: White Paper on Risk Tolerance (Kiefner Applus RTD)
06/30/2016  File Type0339-1501_Final_Report_Paper_Study_on_Risk_Tolerance.pdf 2,829,132
Project: Approaches for Preventing Catastrophic Events (Gas Technology Institute)
07/22/2016  File TypeDTPH5615T00001_Prj_638_Final.pdf 4,475,019
Project: A Novel Approach to Establishing Remaining Strength of Line Pipe and Fittings with Corrosion Type Defects (Engineering Mechanics Corporation of Columbus)
12/09/2015  File TypeDOT_SBIR_Phase_I_Report_-_Attachment_J-1.pdf 73,904
Project: In-situ Sensors for Cathodic Protection Interrelationships Modeling (Sencontrology, Inc.)
02/17/2015  File TypeFINAL_PROJECT_SUMMARY_REPORT_J_1.pdf 787,459
Project: Pipeline Integrity Assessment Using In-Line Inspection (JENTEK Sensors Inc.)
09/24/2015  File TypeDOT_Contract_DTRT57-14-C-10015_ILI_Final_Report_PUBLIC_2014-09-21.pdf 4,828,998
Project: Repair/Replacement Considerations for Pre-Regulation Pipe (Kiefner Applus RTD)
03/12/2015  File Type0339-1401_Tsk_5_1_FINAL_REPORT.pdf 4,279,021
Project: Threat/Anomaly Mitigation Decision-Making Process (Kiefner Applus RTD)
02/25/2016  File TypePubilc_Final_Update_-_Threat-Anomaly_Mitigation_Decision-Making_Process.pdf 10,358,173
Project: Effects of Hydrocarbon Permeation on Plastic Pipe Strength and Fusion Performance (Gas Technology Institute)
02/08/2016  File TypeDTPH561400001_HC_Perm_FINAL_REPORT_2016-2-8.pdf 29,498,810
Project: Enhanced Mitigation of Pipeline Biocorrosion Using A Mixture of D-Amino Acids with A Biocide (Ohio University)
12/28/2015  File TypeFinal_report_-_PHMSA_V6b_revised_submitted_Dec__28-_2015.pdf 8,512,471
Project: Mitigating External Corrosion of Pipelines Through Nano-Modified Cement-Based Coatings (Columbia University)
07/07/2015  File TypeFinal_Report.pdf 1,446,919
Project: Composite Self-sensing Thermal Sprayed Coatings for Pipeline Corrosion Prevention and Mitigation (North Dakota State University)
12/10/2015  File TypeFinal_Report_NDSU.pdf 2,141,309
Project: Proactive and Hybrid Sensing based Inline Pipeline Defects Diagnosis and Prognosis (University of Colorado Denver)
12/11/2015  File TypeCAAP13_Diagnosis_and_Prognosis_Final_Report_CU_ASU_Dec2015.pdf 3,948,435
Project: Permanently Installed Pipeline Monitoring Systems (University at Buffalo)
12/19/2015  File Type2015_PHMSA_Final_Report.pdf 3,288,976
Project: Radio Frequency Identification (RFID) Smart Corrosion Coupon (Texas A&M Engineering Experiment Station)
05/08/2015  File TypeFinal_Report_RFID.pdf 1,216,446
Project: Improving Quality Management Systems (QMS) for Pipeline Construction Activities (Det Norske Veritas (U.S.A.), Inc.)
09/02/2015  File TypePHMSA_QMS_-_Item_17_-_Task_6_-_Final_Report_-_Rev3.pdf 2,391,268
Project: Technology Transfer, Demonstrations and Post-Mortem Testing of Cast Iron and Steel Pipe Lined with Cured-in-Place Pipe Liners (Northeast Gas Association)
01/20/2016  File TypeTechnology_Transfer_Demonstrations_and_Post-Mortem_Testing_of_CIPL_Cast_Iron_and_Steel_Pipe_-Final_Report_Public_Version_REV_1.pdf 2,788,769
Project: Evaluation of Structural Liners for the Rehabilitation of Liquid and Natural Gas Piping Systems (Operations Technology Development NFP)
01/24/2016  File TypePHMSA_501_Composite_Liners_Final.pdf 13,195,079
Project: Improve and Develop ILI Tools to Locate, Size, and Quantify Complex/Interacting Metal Loss Features (Kiefner Applus RTD)
04/26/2016  File TypeDOT-PHMSA_498_Topic_9_Public_Final_Report-April_26_2016.pdf 4,160,200
Project: EMAT Sensor for Small Diameter and Unpiggable Pipe (Operations Technology Development NFP)
02/03/2015  File TypeFINAL_PUBLIC_REPORT_DTPH56-13-T-000007_2015-02-03.pdf 6,515,814
Project: Advanced Development and Technology Transfer of a Methane/Natural Gas Microsensor (Northeast Gas Association)
06/02/2016  File TypeNYSEARCH-ANI-Methane-Sensor-Final-Report-PUBLIC-060216-FINAL.pdf 1,502,476
Project: INO Technologies Assessment of Leak Detection Systems for Hazardous Liquid Pipelines (Electricore, Inc.)
08/13/2015  File TypeDTPH56-13-T-000003_FINAL_REPORT+Appendix_08_13_2015.pdf 2,416,205
Project: The Effect of Pressurized Hydrogen Gas on the Fatigue Properties of the Heat-Affected Zones in X52 and X70 Pipelines (National Institute of Standards and Technology (NIST))
08/14/2015  File TypePVP_2015-45242__FINAL_Draft_b.pdf 1,643,577
Project: Subsurface Multi-Utility Asset Location Tool (Gas Technology Institute)
08/21/2014  File TypeDTPH56-13-T-000001_Final_Report_Item_8_August_2014.pdf 4,577,148
Project: Smart Pipeline Network - Pipe & Repair Sensor System (Odyssian Technology LLC)
08/19/2013  File TypePUBLIC_Final_Report-_Pipe_-_Repair_(DTRT57-12-C-10049)-_JUL2013.pdf 6,537,479
Project: Smart Pipeline Network - Cased Pipe for Monitoring and Sensor System (Odyssian Technology LLC)
11/19/2013  File TypePUBLIC_Final_Report-_Cased_Pipe_for_Smart_Pipeline_Sys_(DTRT57-12-C-10048)-_JUL2013.pdf 3,269,173
Project: Smart Pipeline Network - Seal Sensor System (Odyssian Technology LLC)
08/02/2013  File TypePUBLIC_Final_Report-_Sensor_Seal_(DTRT57-12-C-10050)-_JUL2013_copy.pdf 17,421,710
Project: A Quantitative Non-destructive Residual Stress Assessment Tool for Pipelines (Generation 2 Materials Technology LLC)
09/29/2014  File TypeG2MT_Phase_II_Final_Report.pdf 93,512,945
Project: Development of Non-Destructive In-Service Detection of Damage Severity for Pipeline Steel Inspection (Generation 2 Materials Technology LLC)
04/13/2012  File TypeG2MT_DOT_Final_Report.docx 15,064,191
09/29/2014  File TypeG2MT_Phase_II_Final_Report.pdf 93,512,713
Project: Comprehensive Study to Understand Longitudinal ERW Seam Failures (Battelle Memorial Institute)
01/21/2014  File TypePhase_I_Final_Report.pdf 754,369
Project: Consolidated Research Program, Right of Way Automated Monitoring Threat Prevention (Electricore, Inc.)
08/29/2012  File TypeDOT_422_DTPH56-11-T-000001_Final_Report.pdf 265,480
Project: Development and Field Testing of a Highly Sensitive Mercaptans Instrument (Northeast Gas Association)
10/23/2012  File TypeMercaptan_PHMSA-PUBLIC-REPORT-1012-FINAL.pdf 2,281,496
Project: Acoustic-based Technology to Detect Buried Pipes (Operations Technology Development NFP)
07/29/2011  File TypeAcoustic-based_Technology_to_Locate_Buried_Pipes_Final_Report_July_2011.pdf 4,705,814
Project: Advanced Development of PipeGuard Proactive Pipeline Damage Prevention System (Northeast Gas Association)
07/07/2014  File TypeAdvanced_PG_-PHMSA_report-11712-Public_VersionREV.pdf 1,013,172
Project: Odorant Effectiveness (Gas Technology Institute)
04/22/2014  File Type21093_final_report_2014-04-21.pdf 2,610,733
Project: Realistic Strain Capacity Models for Pipeline Construction and Maintenance (Center For Reliable Energy Systems)
10/15/2014  File TypeFinalReport_DOT_SBD2_Final20131209_rev20141015.pdf 4,637,290
Project: Optimization of Multi-Wire GMAW Welding Procedure for Heavy-Wall Offshore Pipeline Construction (Center For Reliable Energy Systems)
01/06/2012  File TypeDOT_Final_RPT_DTPH56-10-T-000015.pdf 47,439
Project: Selection of Pipe Repair Methods (Operations Technology Development NFP)
07/29/2013  File TypePHMSA_359_Pipe_Repair_Final.pdf 12,684,215
Project: Dent Fatigue Life Assessment - Development of Tools for Assessing the Severity and Life of Dent Features (BMT Fleet Technology Limited)
01/10/2012  File TypeDOT432_Closeout_report.pdf 1,586,593
Project: Integrated Internal Inspection and Cleaning Tool Technology for Pipelines (Electricore, Inc.)
08/31/2012  File TypeDOT_474_DTPH56-10-T-000011_Final_Report_Unrestricted.pdf 527,113
Project: Completion of Development of Robotics Systems for Inspecting Unpiggable Transmission Pipelines (Northeast Gas Association)
02/26/2013  File TypeNYSEARCH-DoT-_robotics-final-report_-PUBLIC-022013.pdf 2,986,969
Project: SETTING SAFE LIMITS ON BIODIESEL CONSTITUENTS FOR PIPELINE INTEGRITY (Det Norske Veritas (U.S.A.), Inc.)
01/26/2012  File TypeBiodiesel_Final_Report_version_1.pdf 835,726
Project: Landfill and Wastewater Treatment RNG Chemical and Physical Profiling: Increasing the Database Set (Gas Technology Institute)
10/12/2011  File TypeGTI-DOT_Final_Report.pdf 7,740,950
Project: Cost-Effective Techniques for Weld Property Measurement and Technologies for Improving Weld HE and IGSCC Resistance for Alternative Fuel Pipelines (The University of Tennessee)
02/25/2015  File TypeFinal_Report_1231_7.pdf 6,235,680
Project: Compatibility of Non-Ferrous Metals with Ethanol (Det Norske Veritas (U.S.A.), Inc.)
10/19/2010  File TypePRCI_(PR-186-09204)_Pump_Station_Final_Report_(EP001681)_(April_23).pdf 356,076
Project: Feasibility of Chemical Inhibition of Ethanol SCC (Det Norske Veritas (U.S.A.), Inc.)
04/13/2012  File TypeUSDT_-_Final_Report_(WP383_Chemical_Control)_EP02_1141.pdf 2,982,554
Project: Technical and Economic Feasibility of Preventing SCC through Control of Oxygen (Det Norske Veritas (U.S.A.), Inc.)
01/04/2012  File TypeUSDT_-_Final_Report_(WP284_Oxygen_Control)_EP02_1142_Jan_04.pdf 1,834,236
Project: Corrosion and Integrity Management of Biodiesel Pipelines (Det Norske Veritas (U.S.A.), Inc.)
11/02/2011  File TypeCorrosion_Intergity_Threats_Biodiesel_Final_Report_version_1.pdf 393,704
Project: Stress Corrosion Cracking of Pipeline Steels in Fuel Grade Ethanol and Blends (Georgia Tech Research Corporation)
01/26/2012  File TypeFinal_Report_-_DTPH56-09-T-000004__-GA_Tech.pdf 4,562,938
Project: New Design and Construction Techniques for Transportation of Ethanol and Ethanol/Gasoline Blends in New Pipelines (Electricore, Inc.)
03/21/2013  File TypePHMSA_DTPH56-09-T-000003_Ethanol_Final_Report_March2013.pdf 28,007,666
Project: Performance Evaluation of High-Strength Steel Pipelines for High-Pressure Gaseous Hydrogen Transportation (Center For Reliable Energy Systems)
07/29/2013  File TypeDTPH56-09-T-000005-HydrogenProjectReport-Final.pdf 3,353,149
Project: Modeling of Microbial Induced Corrosion on Metallic Pipelines Resulting from Biomethane & the Integrity Impact of Biomethane on Non-Metallic Pipelines (Gas Technology Institute)
09/28/2012  File TypeDOT_PHMSA_Prj_293_FINAL_REPORT_2012-9-28.pdf 18,751,085
Project: Digital Imaging of Pipeline Mechanical Damage and Residual Stress (JENTEK Sensors Inc.)
02/26/2010  File TypeDOT_Contract_DTRT57-09-C-10046_pipeline_mechanical_damage_final__report.pdf 16,118,201
Project: Low-Cost, Full-Field, Surface Profiling Tool for Mechanical Damage Evaluation (Intelligent Optical Systems, Inc. (IOS))
03/31/2010  File Type3190_(MK)_DOT_Final_Report_v7_(2).pdf 1,379,900
04/03/2010  File TypeFinal_Project_Summary_Report_form_v2.pdf 35,473
12/28/2010  File Type3190_(MK)_DOT_Final_Report_v7_(2)[1].pdf 1,379,892
Project: Design, Development, and Testing of Optimized Composite Soft Crack Arrestors (Engineering Mechanics Corporation of Columbus)
07/31/2013  File TypeDraft_Final_report_DOT_DTRT57-09-C-10031_Soft_Crack.pdf 871,374
Project: Pig Mounted Trials for Internal Corrosion Monitoring Fluidized Sensors (Det Norske Veritas (U.S.A.), Inc.)
10/16/2012  File Typepig_mounted_fluidized_sensor_final_report.pdf 1,473,196
Project: New IN-Field Composite Repair Techniques for Transmission or Distribution Pipelines (Odyssian Technology LLC)
05/19/2009  File TypeComposite_Repair_PhI_Final_Report,_18May2009,_DTRT57-08-C-10068.pdf 4,712,468
Project: Application of non-destructive evaluation techniques in pipeline inspection (Texas Transportation Institute)
04/21/2009  File TypeDOT_ROW_Sensor_report_4_21_09.pdf 1,539,959
Project: Structural Repair of Steel Piping by In-Situ Sleeving of Nanostructured Materials (Integran Technologies U.S.A., Inc.)
06/03/2009  File TypeIntegran_Tech_DTRT57-08-c-10070_final_report.pdf 255,579
Project: Broadband Electromagnetic Technology Sensor to Assess Ferrous Pipes without Removing Coatings in Both Traditional and Keyhole Excavations (Operations Technology Development NFP)
06/23/2011  File TypeGTI_Final_for_BEM_v12.pdf 3,493,708
Project: Validation for Flaw Acceptance of Mechanical Damage to Low Stress Natural Gas Pipelines (Operations Technology Development NFP)
01/04/2012  File TypePHMSA_257_Final_Report_Dec_2011.pdf 5,670,321
Project: Validation of External Corrosion Growth-Rate Using Polarization Resistance and Soil Properties (Operations Technology Development NFP)
04/13/2011  File TypePHMSA_256_Final_Aug_2010.pdf 10,051,036
Project: Internal Corrosion Detection in Liquids Pipelines (AGINOVA INC.)
04/17/2012  File TypeAginovaFinalReport.pdf 2,365,762
Project: Feasibility of Using Plastic Pipe for Ethanol Low Stress Lines (Gas Technology Institute)
05/28/2010  File TypeFinal_Report_Ethanol_Project_DTPH56-08-T-000021_Prj254.pdf 3,960,145
Project: Determine the Requirements for Existing Pipeline, Tank and Terminal Systems to Transport Ethanol without Cracking (Pipeline Research Council International)
10/15/2010  File TypeFinal_Report_SCC-4-4_-_June_15.pdf 2,022,631
Project: Advanced Development of Proactive Infrasonic Gas Pipeline Evaluation Network (Northeast Gas Association)
02/07/2014  File TypeAdvanced_Development_of_PIGPEN-Final_Report_Public_Documentat20714.pdf 2,850,007
Project: Achieving Maximum Crack Remediation Effect from Optimized Hydrotesting (University of Alberta)
01/10/2012  File TypeDTPH56-08-T-000008-WP-355_WChen_U_of_A[1].pdf 6,556,920
Project: Pipeline Quality Biogas: Guidance Document for Dairy Waste, Wastewater Treatment Sludge and Landfill Conversion (Gas Technology Institute)
02/24/2010  File TypeFinalReportDTPH-Project_250_02_24_2010.pdf 6,049,097
Project: GPS-Based Excavation Encroachment Notification (Gas Technology Institute)
10/31/2011  File TypeGPS-Based_EEN_-_Final_Report_(PHMSA)_2.pdf 5,220,703
Project: Monitoring Conditions Leading to SCC/Corrosion of Carbon Steel (Det Norske Veritas (U.S.A.), Inc.)
02/11/2011  File TypeFinal_Report-WP327.pdf 531,082
Project: Effect of Ethanol Blends and Batching Operations on Stress Corrosion Cracking of Carbon Steel (Det Norske Veritas (U.S.A.), Inc.)
02/09/2011  File TypeFinal_Report-WP325.pdf 3,574,343
Project: Effect of Ethanol Source on Stress Corrosion Cracking of Carbon Steel (Det Norske Veritas (U.S.A.), Inc.)
02/24/2011  File TypeFinal_Report-WP323.pdf 1,350,161
Project: Evaluation and Method for Qualification of Fiber Reinforced Composite Repair Techniques for Transmission and/or Distribution Pipelines (Det Norske Veritas (U.S.A.), Inc.)
12/29/2009  File TypeReport_2009-9332_Method_for_Qualification_of_Composite_Repairs_for_Pipelines_D_Hill_-_DNV_-_Final_DTPH56-08-T-000016.pdf 3,398,824
Project: ECDA - Potential Measurements on Paved Areas (Corrpro Companies Inc)
06/15/2010  File TypeFinal_Report_-_Project_243.pdf 19,460,710
Project: Severity Ranking of ECDA Indirect Inspection Indications (Corrpro Companies Inc)
06/15/2010  File TypeFinal_Report_-_Project_242.pdf 13,137,893
Project: ECDA Cased Pipes (Corrpro Companies Inc)
06/15/2010  File TypeFinal_Report_-_Project_241.pdf 639,170
Project: Effect of Concentration and Temperature of Ethanol in Fuel Blends on Microbial and Stress Corrosion Cracking of Pipeline Steels (Colorado School of Mines)
02/17/2012  File TypeDOT_REPORT.pdf 9,337,959
Project: Development and demonstration of an integrated tool for mapping, sizing and evaluation of SCC for remaining strength prediction (RTD Quality Services USA, L.P.)
07/08/2011  File TypeReport-DTPH56-08-T-000005_Final_ver_1.pdf 3,231,298
Project: Structural Significance of Mechanical Damage (Electricore, Inc.)
03/05/2013  File TypeDTPH56-08-T-000011_Q1-Q17_FINAL_REPORT.pdf 23,152,090
Project: Adaptation of MWM-Array and MFL Technology for Enhanced Detection/Characterization of Damage from Inside Pipelines (JENTEK Sensors Inc.)
03/26/2012  File TypeDOT306_final_report_final_final.pdf 17,863,904
Project: Development of a Free-Swimming Acoustic Tool for Liquid Pipeline Leak Detection Including Evaluation for Natural Gas Pipeline Applications (Arizona State University)
11/24/2010  File TypeFinal_Report_(DTPH56-07-BAA-000002).pdf 3,607,324
Project: The Effect of Cathodic Protection on Stress Corrosion Cracking of High-Strength Pipeline Steels (CANMET Materials Technology Laboratory)
12/02/2009  File TypeReport-DOT-_Final__RWR.pdf 2,741,705
Project: Improving Magnetic Flux Leakage In-Line Inspection Corrosion Sizing Using Phased Array Guided Ultrasonic Waves (Battelle Memorial Institute)
09/30/2010  File TypeFR_DOT_MFL-GWUT_9-30-10.pdf 7,407,746
Project: Enhanced Defect Detection and Sizing Accuracy Using Matrix Phased Array Ultrasonics Tools (Edison Welding Institute, Inc.)
08/31/2011  File TypeDTPH56-08-T-000002_Final_Report_8-30-11.pdf 20,919,663
Project: Development of Tools to Estimate Actual Corrosion Growth Rates (Internal and External) of Gas Pipelines (Southwest Research Institute)
10/31/2011  File TypeF14082DOT_091411_new.pdf 5,086,780
Project: Development of a Commercial Model to Predict Stress Corrosion Cracking Growth Rates in Operating Pipelines (Southwest Research Institute)
06/22/2011  File TypeFinal_Report_SwRI_Project14080_DOT_062011.pdf 2,107,576
Project: Crack Arrest and Structural Repair of High Strength Steel Piping by In-Situ Sleeving of Nanostructured Materials (Integran Technologies U.S.A., Inc.)
08/06/2008  File TypeFinal-ReportDoT_Phase_I__DTRT57-08-C-10022.pdf 1,855,974
Project: Development of Optimized Welding Solutions for X100 Linepipe Steel (Electricore, Inc.)
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_278-S-01_Summary_Report.pdf 4,205,741
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_278-T-01_State_of_Art_Review.pdf 2,916,355
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_278-T-02_Matl_Select_Welding_and_Weld_Monitor.pdf 1,193,104
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_278-T-03_Micro_and_Hardness_of_Girth_Welds.pdf 11,091,787
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_278-T-04_Microstructure_and_Prop_of_Simulated_WM.pdf 13,515,738
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_278-T-05_Micro_and_Properties_of_Sim_HAZ.pdf 8,148,160
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_278-T-06_Essential_Welding_Variables.pdf 6,795,639
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_278-T-07_Thermal_Model_Develop.pdf 2,037,437
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_278-T-08_Microstructure_Model_Develop.pdf 1,097,025
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_278-T-09_App__to_Other_Weld_Processes.pdf 854,097
Project: Update of Weld Design, Testing, and Assessment Procedures for High Strength Pipelines (Electricore, Inc.)
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_277-S-01_Summary_Report.pdf 2,170,705
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_277-T-01_Background_of_Linepipe_Specifications.pdf 2,098,059
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_277-T-02_Background_of_AWM_Tensile_Test_Protocol.pdf 1,209,764
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_277-T-03_Procedure_for_Low_Constraint_Tough_Testing.pdf 896,722
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_277-T-04__Summary_of_Publications-SE(T)_Tests.pdf 699,172
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_277-T-05_Small_Scale_Tensile_Charpy_V_and_Fract_Tough_Tests.pdf 4,844,234
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_277-T-06_Small_Scale_Low_Const_Fract_Tough_Test_Results.pdf 7,065,284
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_277-T-07_Small_Scale_Low_Const_Fract_Tough_Test_Discuss.pdf 3,419,536
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_277-T-08_Summary_of_Mechanical_Properties.pdf 1,097,070
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_277-T-09_Curved_Wide_Plate_Tests.pdf 3,257,031
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_277-T-10_Weld_Strength_Mismatch_Requirements.pdf 1,580,039
02/13/2012  File TypePHMSA_Project_DTPH56-07-000005_Final_Report_277-T-11_CWP_Test_Results.pdf 2,807,536
Project: In-Situ Hydrogen Analysis in Weldments: Novel NDE for Weld Inspection (Colorado School of Mines)
09/01/2010  File TypeDTPH56-07-T-000009_Final_Report.doc 20,337,152
Project: Automated Laser Ultrasonic Testing (ALUT) Of Hybrid Laser Arc Welds For Pipeline Construction (Intelligent Optical Systems, Inc. (IOS))
12/22/2009  File Type3163_(MK)_DOT_Final_Rpt.pdf 2,007,803
Project: Hybrid Laser Arc Welding (HLAW) System Development for Pipeline Construction (BMT Fleet Technology Limited)
06/03/2011  File Type6166-FR_Rv00KW_RH_DB_8Sep10[1].pdf 13,722,593
Project: Butt Fusion Joint Integrity and Evaluation of NDE Technologies (Northeast Gas Association)
02/04/2013  File TypeBFI_PH_II-_Final_Report__DOT_PUBLIC_Ver_020213.pdf 761,589
Project: Validation of Assessment Methods for Production Scale Girth Welding of High Strength Pipelines with Multiple Pipe Sources (Electricore, Inc.)
04/03/2012  File TypePHMSA_DTPH56-07-T-000006_Final_Report_Valid_of_Methods_for_HS_Steel.pdf 16,820,678
Project: Hybrid Laser/GMAW of High Strength Steel Gas Transmission Pipelines (Edison Welding Institute, Inc.)
04/30/2010  File TypeHybrid_Laser-GMAW_of_High_Strength_Steel_Gas_Transmission_Pipe_-_DOT_Final_Report.pdf 8,280,279
Project: Advanced Technologies and Methodology for Automated Ultrasonic Testing Systems Quantification (Edison Welding Institute, Inc.)
03/24/2011  File TypeAppendix_A_for_DTPH56-07-T000002_Final_Report.pdf 107,062
03/24/2011  File TypeAppendix_B_for_DTPH56-07-T000002_Final_Report.pdf 91,787
03/24/2011  File TypeAppendix_C_for_DTPH56-07-T000002_Final_Report.pdf 63,530
03/24/2011  File TypeAppendix_D_for_DTPH56-07-T000002_Final_Report.pdf 230,352
03/24/2011  File TypeAppendix_E_for_DTPH56-07-T000002_Final_Report.pdf 3,846,401
03/24/2011  File TypeAppendix_F_for_DTPH56-07-T000002_Final_Report.pdf 2,940,590
03/24/2011  File TypeAppendix_G_for_DTPH56-07-T000002_Final_Report.pdf 31,594
03/24/2011  File TypeAppendix_H_for_DTPH56-07-T000002_Final_Report.pdf 633,409
03/24/2011  File TypeAppendix_I_for_DTPH56-07-T000002_Final_Report.pdf 114,723
03/24/2011  File TypeAppendix_J_for_DTPH56-07-T000002_Final_Report.pdf 9,277,511
03/24/2011  File TypeAppendix_K_for_DTPH56-07-T000002_Final_Report.pdf 4,420,167
03/24/2011  File TypeAppendix_L_for_DTPH56-07-T000002_Final_Report.pdf 3,214,790
03/24/2011  File TypeAppendix_M_for_DTPH56-07-T000002_Final_Report.pdf 1,470,323
03/24/2011  File TypeAppendix_N_for_DTPH56-07-T000002_Final_Report.pdf 1,204,436
03/24/2011  File TypeAppendix_O_for_DTPH56-07-T000002_Final_Report.pdf 4,528,258
03/24/2011  File TypeAppendix_P_for_DTPH56-07-T000002_Final_Report.pdf 2,284,324
03/24/2011  File TypeAppendix_Q_for_DTPH56-07-T000002_Final_Report.pdf 1,414,355
03/24/2011  File TypeAppendix_R_for_DTPH56-07-T000002_Final_Report.pdf 1,224,655
03/24/2011  File TypeAppendix_S_for_DTPH56-07-T000002_Final_Report.pdf 1,181,504
03/24/2011  File TypeAppendix_T_for_DTPH56-07-T000002_Final_Report.pdf 1,538,761
03/24/2011  File TypeAppendix_U_for_DTPH56-07-T000002_Final_Report.pdf 29,138,780
03/24/2011  File TypeAppendix_V_for_DTPH56-07-T000002_Final_Report.pdf 85,366
04/29/2011  File TypeDTPH56-07-T-000002_Final_Report_4-29-2011.pdf 8,590,747
Project: Improving Joint Integrity and Assessment for Non-Metallic Materials (Gas Technology Institute)
07/31/2009  File TypeDTPH56-07-T-000001_Final.pdf 2,185,672
Project: Development of HAZ Hardness Limits for In-Service Welding (Det Norske Veritas (U.S.A.), Inc.)
09/30/2009  File Type82673428_PHMSA_Final_DTPH56_07_T_000004_093009.pdf 7,035,662
Project: High Resolution Electromagnetic Imaging and Decision Support for Pipeline Life Management Delivery (JENTEK Sensors Inc.)
06/04/2007  File TypeDOTFinal_Report_070531_final.pdf 5,841,265
Project: Pipe Disbondment Detection and Coating Assessment Using the Dynamic Wavelet Fingerprinting Technique (Solers Inc.)
09/05/2007  File TypeProjno214_Solers_DOT_Final_Report-Public.pdf 134,820
Project: MEIS System for Pipeline Coating Inspection (HD Laboratories, Inc.)
01/18/2008  File Typefinal_report_11_07.pdf 2,587,334
Project: Effect of Surface Preparation on Residual Stress in Multi-layer and Other Pipeline Coatings (NOVA Research & Technology Centre)
02/11/2010  File TypeNRTC_Coatings_BAA_FINAL_Report_(3).pdf 3,134,320
Project: Phase Sensitive Methods to Detect Cathodic Disbondment (Gas Technology Institute)
01/23/2014  File TypeFinal_Report_-_Phase_Sensitive_Methods_to_Detect_Cathodic_Disbondment.pdf 730,571
Project: Method for Qualification of Coatings Applied to Wet Surfaces (Det Norske Veritas (U.S.A.), Inc.)
01/07/2010  File TypePHMSA_wet_coating_Final_Report.pdf 1,163,450
Project: Dissecting Coating Disbondments (Det Norske Veritas (U.S.A.), Inc.)
12/06/2010  File Typedissecting_coating_disbondment_final_report_rev1.pdf 2,397,955
Project: Improved In-field Welding and Coating Protocols (Gas Technology Institute)
07/22/2009  File TypeFinalReport.pdf 11,111,086
Project: Augmenting MFL Tools with Sensors That Assess Coating Condition (Battelle Memorial Institute)
08/26/2009  File TypeFR_DTPH56-06-T-000019.pdf 9,274,921
Project: External Pipeline Coating Integrity (Texas A&M Engineering Experiment Station)
12/31/2009  File TypeDOT_TAMU_HJSue.pdf 1,413,298
Project: Mechanical Properties and Crack Behavior in Line Pipe Steels (National Institute of Standards and Technology (NIST))
12/04/2012  File TypeDOT_NIST_Report_Final_November_30__2012.pdf 8,675,335
Project: Investigate Fundamentals and Performance Improvements of Current In-Line Inspection Technologies for Mechanical Damage Detection (Pipeline Research Council International)
09/01/2008  File TypePRCI-U206-002-Phase_I_Report-_Final-ver001-Posted-July_2008.pdf 3,000,013
08/03/2009  File TypeMD1-2_Final_Report_Phase_II_version_000.pdf 761,034
Project: Development of Dual Field MFL Inspection Technology to Detect Mechanical Damage (Pipeline Research Council International)
03/27/2013  File TypeFinal_Report_Dual-Field_MFL_ILI_Technology_DTPH56-06-T-000016_March_2013.pdf 8,308,633
Project: Pipeline Integrity Management for Ground Movement Hazards (Pipeline Research Council International)
01/29/2009  File TypeENV-1REPORT_FINAL_REPORT_JAN_09_std1.pdf 9,324,335
Project: Second Generation Models for Strain-Base Design (Pipeline Research Council International)
08/31/2011  File TypeFinalReport_ABD1_Project2_20110830.pdf 4,420,244
Project: Validation and Documentation of Tensile Strain Limit Design Models for Pipelines (Pipeline Research Council International)
08/04/2011  File TypeFinalReport_ABD1_Project1_Mainbody.pdf 10,097,067
08/04/2011  File TypeABD_1_4Aug11_Appendix_5.zip 13,717,321
  0
09/17/2011  File TypeFinalReport_ABD1_Project1_Appendix5A.pdf 7,851,971
09/17/2011  File TypeFinalReport_ABD1_Project1_Appendix5B.pdf 3,780,046
09/17/2011  File TypeFinalReport_ABD1_Project1_Appendix5C.pdf 2,458,978
09/17/2011  File TypeFinalReport_ABD1_Project1_Appendix5D.pdf 108,567
Project: Guidelines for the Identification of SCC Sites and the Estimation of Re-Inspection Intervals for SCCDA (Pipeline Research Council International)
12/22/2010  File Typefinal_report_DTPH56-06-T-000013.pdf 8,326,526
Project: Long Term Monitoring of Cased Pipelines Using Long-Range Guided-Wave Technique (Northeast Gas Association)
09/01/2010  File TypeM2004-005_MsS_PhaseII_NYSEARCH_Final_Report.pdf 19,590,885
Project: ECDA for Unique Threats to Underground Pipelines (Det Norske Veritas (U.S.A.), Inc.)
01/05/2011  File TypeECDA_Unique_Threats_Final__report_DTPH56_06_T_0012.pdf 6,982,633
Project: Demonstration of ECDA Applicability and Reliability for Demanding Situations (Gas Technology Institute)
10/01/2008  File TypeFinal_Report_DTPH56-06-T-000001_Proj_195_-_2008-08-31.pdf 19,427,722
Project: Plastic Pipe Failure, Risk, and Threat Analysis (Gas Technology Institute)
04/30/2009  File TypeDTPH56-06-T-0004_Final_Report.pdf 12,642,218
Project: Guidelines for Interpretation of Close Interval Surveys for ECDA (Det Norske Veritas (U.S.A.), Inc.)
06/07/2016  File TypeUS_DOT_CIS_Final_Report_secured.pdf 1,835,952
Project: Internal Corrosion Direct Assessment Detection of Water (Det Norske Veritas (U.S.A.), Inc.)
12/02/2010  File Typeicda_sensor_final_report_rev_3.pdf 2,188,426
Project: Enhancing Direct Assessment with Remote Inspection through Coatings and Buried Regions (EMAT Ultrasonics Inc.)
05/11/2009  File TypeFinal_Report-DTPH56-06-T-0009.pdf 213,135
Project: Differential Impedance Obstacle Detection Sensor (DIOD) - Phase 2 (Gas Technology Institute)
09/26/2008  File TypeDTPH56-06-T-005_Final_2008_09.doc 1,115,648
Project: Real-time Active Pipeline Integrity Detection (RAPID) system for Direct Assessment of Corrosion in Pipelines (Acellent Technologies, Inc.)
01/15/2007  File TypeFinal_report-complete.pdf 1,036,896
Project: Characterization of Stress Corrosion Cracking Using Laser Ultrasonics (Intelligent Optical Systems, Inc. (IOS))
10/08/2008  File Type3153_(MK)_DOT-LASSON_Final_Report.pdf 6,016,090
Project: Define, Optimize and Validate Detection and Sizing Capabilities of Phased-Array Ultrasonics to Inspect Electrofusion Joints in Polyethylene Pipes (Edison Welding Institute, Inc.)
09/26/2008  File TypeDTPH56-06-T-000002 Final Report.zip 138,342,694
Project: Feasibility of an Ultrasonic Based Instrument for Assessing In-Situ Pipeline Coatings (FBS, Inc.)
06/09/2006  File TypeVOLPE_Final_Report.pdf 1,553,451
Project: In-Line Nondestructive Inspection of Mechanical Defects in Pipelines with Shear Horizontal Wave EMAT (Intelligent Automation, Inc.)
05/17/2006  File TypeDOT_SBIR_Pipeline_Monitoring_Final_Report.pdf 1,651,605
06/05/2006  File TypePipeline_inspection_final_debriefing6_6_06_rev1.pdf 1,854,806
Project: Infrasonic Frequency Seismic Sensor System for Pipeline Integrity Management (Physical Sciences Inc.)
11/06/2007  File Type1474-TR-2247.pdf 7,878,986
Project: New Touch-Down Zone Solutions for Steel Catenary Risers (SCR) (Granherne-KBR)
04/07/2008  File TypeFinal_Report_-_Project_182.pdf 934,890
Project: DW RUPE: Deepwater GOM Pipeline Damage Characteristics & Repair Options (Stress Engineering Services)
12/29/2005  File TypeProjno181-FinalReport.pdf 1,063,646
Project: Steel Catenary Riser (SCR) Integrity Management (MCS Advanced Engineering Solutions)
04/24/2009  File TypeProject180.pdf 567,410
Project: Pipeline Assessment and Repair Manual (Det Norske Veritas (U.S.A.), Inc.)
07/04/2007  File TypePR-186-0324_Udated-Pipeline-Repair-Manual_Final-Report.pdf 3,207,115
Project: Understanding Magnetic Flux Leakage (MFL) Signals from Mechanical Damage in Pipelines (Electricore, Inc.)
09/28/2011  File TypeDTPH56-05-T-0001_Phase-1_FinalReport.pdf 4,929,302
09/28/2011  File TypeDTPH56-05-T-0001-Phase-2_FinalReport.pdf 5,354,038
05/31/2012  File TypePhase_3_Final_Report_DTPHH56-05-T-0001.pdf 14,547,047
05/31/2012  File TypePhase_4_Final_Report_DTPHH56-05-T-0001.pdf 7,446,636
Project: Update Guidance Document (Electricore, Inc.)
10/27/2016  File TypeFinal_Report_-_DTPH56-05-T-0003_-_Report_9492_Issue_3_0.pdf 551,687
Project: Remaining Strength of Corroded Pipe Under Secondary (Biaxial) Loading (Electricore, Inc.)
10/08/2009  File TypeFinal_report_DTPH56-05-T0003_project_153J.pdf 3,007,049
Project: Assessment of Older Corroded Pipelines with Reduced Toughness and Ductility (Electricore, Inc.)
09/17/2015  File TypeFinal_Report_-_DTPH56-05-T-0003_-_Report_9492_Issue_3_0.pdf 551,687
Project: Behavior of Corroded Pipelines Under Cyclic Pressure (Electricore, Inc.)
05/29/2008  File Type153_K_Interim_Final_Report__R8928_.pdf 5,311,431
09/15/2011  File TypeR8928_Issue_2.pdf 8,620,921
Project: Corrosion Assessment Guidance for Higher Strength Pipelines (Electricore, Inc.)
10/08/2009  File TypeFinal_Report_DTPH56-05-T0003_project153H.pdf 630,431
11/05/2009  File TypeReport_6781_Issue_6_1_Final.pdf 1,238,184
12/11/2009  File TypeDTPH56-05-T-0003_153H__171__Phase_2_Final_Report.pdf 2,344,962
Project: Use of Unmanned Underwater Vehicle (UUAV) for Pipeline Surveillance to Improve Safety and Lower Cost (Electricore, Inc.)
07/11/2007  File TypeDTPH56-05-T-0004_161_Final_Report.pdf 2,183,742
Project: Use of Unmanned Air Vehicle (UAV) for Pipeline Surveillance to Improve Safety and Lower Cost (Electricore, Inc.)
08/24/2007  File TypeFinal_Report_-_DTPH56-05-T-0004.pdf 2,564,800
Project: Evaluation and Validation of Aboveground Techniques for Coating Condition Assessment (Det Norske Veritas (U.S.A.), Inc.)
03/03/2009  File TypeDTRS56-05-T-0004_final-Rev1.pdf 3,083,243
Project: A New Approach to Control Running Fracture in Pipelines (Battelle Memorial Institute)
03/05/2007  File TypeRunningFracture-DFR.pdf 1,218,264
Project: Integrity Management for Wrinklebends and Buckles (Battelle Memorial Institute)
12/29/2007  File TypeWrinklebends-FR.pdf 6,765,602
Project: Model Modules to Assist Assessing and Controlling Stress Corrosion Cracking (SCC) (Battelle Memorial Institute)
04/07/2008  File TypeDTRS56-05-T-0003__SCC_DFR_040708_.pdf 1,631,551
Project: Applying External Corrosion Direct Assessment (ECDA) to Difficult to Inspect Areas (Battelle Memorial Institute)
06/06/2007  File TypeDTRS56-05-T-0003_130_ECDA-FR.pdf 1,291,115
Project: Validation and enhancement of long range guided wave ultrasonic testing: A key technology for DA of buried pipelines (Northeast Gas Association)
08/23/2007  File TypeFinal_Report_-_Project_161.pdf 1,095,528
Project: Design, Construction and testing of a segmented MFL sensor for use in the inspection of unpiggable pipelines (Northeast Gas Association)
07/07/2011  File TypeNYSERACH_Robotics__Final_Report_Public_Submitted_070711.pdf 8,562,146
Project: Design, construction and demonstration of a robotic platform for the inspection of unpiggable pipelines under live conditions (Northeast Gas Association)
07/07/2011  File TypeNYSERACH_Robotics__Final_Report_Public_Submitted_070711.pdf 8,562,146
Project: Innovative Safety and Reliability Technologies for Pipeline System Integrity and Management (Intelligent Automation, Inc.)
02/20/2009  File TypePipeline%20inspection_debriefing%20slides.pdf 1,802,919
Project: Pipeline Integrity Process - Management/Audit System (PIPe-MAS) (AECsoft USA, Inc.)
03/31/2005  File TypeProjno156_Phase_I_Final_Report_2-7-05_V3_PRIVATE.pdf 2,242,412
Project: Task Order #1: External Corrosion of Line Pipe Steels (National Institute of Standards and Technology (NIST))
09/11/2007  File TypeNISTIR_7415_PL_Corro-Ricker.pdf 1,780,563
Project: Innovative Welding Processes for Small to Medium Diameter Gas Transmission Pipelines (Edison Welding Institute, Inc.)
06/09/2009  File TypeEWI_Project_No__47961GTH_Technical_Report_Task_7.pdf 311,541
06/09/2009  File TypeEWI_Project_No__47961GTH_Technical_Report_Task_6.pdf 3,831,837
06/09/2009  File TypeEWI_Project_No__47961GTH_Technical_Report_Task_5.pdf 2,340,613
06/09/2009  File TypeEWI_Project_No__47961GTH_Technical_Report_Tasks_3_and_4.pdf 1,163,924
06/09/2009  File TypeEWI_Project_No__47961GTH_Technical_Report_Task_2.pdf 231,328
06/09/2009  File TypeEWI_Project_No__47961GTH_Technical_Report_Task_1.pdf 5,562,127
Project: Optimizing Weld Integrity for X80 and X100 Linepipe (Edison Welding Institute, Inc.)
08/15/2007  File Type47960GTH_Final_Report_8-15-2007.pdf 5,176,222
02/25/2011  File TypeDTRS56-04-T-0011_-_Appendix_A.pdf 6,884,403
02/25/2011  File TypeDTRS56-04-T-0011_-_Appendix_B.pdf 120,192
02/25/2011  File TypeDTRS56-04-T-0011_-_Appendix_C.pdf 5,967,697
Project: Infrasonic frequency seismic sensor system for preventing third party damage to gas pipelines (Northeast Gas Association)
05/28/2010  File Typepigpen_final_report.pdf 10,143,482
Project: Modeling and Assessing a Spectrum of Accidental Fires and Risks in a LNG Facility (Technology & Management Systems, Inc.)
09/18/2007  File TypeFINAL_Tech_Report_-_Phase_1.pdf 2,142,369
09/18/2007  File TypeFINAL_Report_-_Phase_2_-_Stow_Burn.pdf 6,270,423
Project: Effectiveness of Prevention Methods for Excavation Damage (C-FER Technologies)
12/18/2006  File TypeCFER-Final_Rpt-06Dec18.pdf 1,138,287
Project: Mechanical Damage at Welds (BMT Fleet Technology Limited)
08/01/2006  File Type5827CFR_KS1Aug06.pdf 2,058,483
Project: Human Factors Analysis of Pipeline Monitoring and Control Operations (Battelle Memorial Institute)
01/15/2009  File TypeDeliverables_Nov_2008_PDF.zip 2,913,031
Project: Evaluation of Hydrogen Cracking in Weld Metal Deposited using Cellulosic Electrodes (Edison Welding Institute, Inc.)
06/16/2009  File TypeFinalReport_to__DOT_Rev1.pdf 1,637,387
Project: Determining Integrity Reassessment Intervals Through Corrosion Rate Modeling And Monitoring (Southwest Research Institute)
10/31/2006  File TypeF11027DOT-ExtendedWork.pdf 3,821,646
Project: Nonlinear Harmonic-based Mechanical Damage Severity Criteria for Delayed Failures in Pipelines (Southwest Research Institute)
04/19/2007  File TypeDTRS56-04-T-0001_SwRI_Project_Presentation_19APR2007.pdf 3,265,669
Project: Strain-Based Design of Pipelines - Phase II (Edison Welding Institute, Inc.)
03/21/2007  File TypeProject_140_Final_Report.pdf 3,342,913
03/21/2007  File TypeProject_140_Final_Report_-_Appendix_A.pdf 65,186
Project: Managing the Integrity of Early Pipelines (Battelle Memorial Institute)
04/20/2005  File TypeRSPA-CrackGrowthAnalysis-FinalReport.pdf 1,904,784
Project: Piezo Structural Acoustic Pipeline Leak Detection System (Midé Technology Corporation)
08/23/2005  File TypeProjNo137_Final_Rpt_June_04-Sm.pdf 6,773,779
Project: Intrinsic Distributed Fiber Optic Leak Detection (Prime Research)
08/30/2004  File TypeProjno136_Final_Rpt_June_2004.pdf 677,072
Project: Infrasonic Frequency Seismic Sensor System for Pipeline Integrity Management (Physical Sciences Inc.)
11/30/2006  File TypeProjno135_FinalReport_May_2004-Small-Public.pdf 6,804,940
Project: High-power, Long-range, Guided-wave Inspection of Pipelines (Southwest Research Institute)
09/08/2005  File Type10062DOT_FR-HK.pdf 3,100,758
Project: Improved Inspection and Assessment Methods for Pipeline Girth Welds and Repair Welds (Edison Welding Institute, Inc.)
02/24/2006  File Type01_-_02-46997GTH_Final_Report_-_Chapters_I_-_II.pdf 72,852
02/24/2006  File Type03-46997GTH_Final_Report_-_Chapter_III.pdf 2,143,222
02/24/2006  File Type04-46997GTH_Final_Report_-_Chapter_IV.pdf 605,648
02/24/2006  File Type05-46997GTH_Final_Report_-_Chapter_V.pdf 4,994,306
02/24/2006  File Type06-46997GTH_Final_Report_-_Chapter_VI.pdf 7,744,445
02/24/2006  File Type07-46997GTH_Final_Report_-_Chapter_VII.pdf 8,168,900
02/24/2006  File Type08-46997GTH_Final_Report_-_Chapter_VIII.pdf 1,762,728
02/24/2006  File Type09-46997GTH_Final_Report_-_Chapter_IX.pdf 231,722
02/24/2006  File Type10-46997GTH_Final_Report_-_Chapter_X.pdf 16,904
02/24/2006  File Type11-46997GTH_Financial_Report_Chapter_XI.pdf 17,937
02/24/2006  File Type46997GTH_Final_Report_Appendix_A1_5_1_(final).pdf 2,297,723
02/24/2006  File Type46997GTH_Final_Report_Appendix_A1_6_1_(final).pdf 2,946,121
02/24/2006  File Type46997GTH_Final_Report_Appendix_A1_6_2_(final).pdf 4,735,876
02/24/2006  File Type46997GTH_Final_Report_Appendix_A1_6_4_(final).pdf 4,239,939
02/24/2006  File Type46997GTH_Final_Report_Appendix_A1_7_2_(final).pdf 408,352
02/24/2006  File Type46997GTH_Final_Report_Appendix_A1_9_(final)_ppt.pdf 2,377,404
02/24/2006  File Type46997GTH_Final_Report_Appendix_B1_6_4_(final).pdf 2,495,787
02/24/2006  File Type46997GTH_Final_Report_Appendix_B1_7_2_(final).pdf 4,912,595
02/24/2006  File Type46997GTH_Final_Report_Appendix_B1_9_(final)_ppt.pdf 991,714
02/24/2006  File Type46997GTH_Final_Report_Appendix_C1_6_4_(final).pdf 1,389,755
02/24/2006  File Type46997GTH_Final_Report_Appendix_C1_9_(final).pdf 3,007,271
Project: Validation of Sleeve Weld Integrity and Workmanship Limit Development (BMT Fleet Technology Limited)
08/01/2006  File Type5666CFR_KS1Aug06.pdf 1,690,645
Project: Alternate Welding Processes for In-service Welding (BMT Fleet Technology Limited)
04/27/2009  File TypeAPPENDIX_N.pdf 50,769
04/27/2009  File TypeAPPENDIX_M.pdf 114,552
04/27/2009  File TypeAPPENDIX_L.pdf 52,846
04/27/2009  File TypeAPPENDIX_K.pdf 55,702
04/27/2009  File TypeAPPENDIX_J.pdf 139,559
04/27/2009  File TypeAPPENDIX_I.pdf 59,976
04/27/2009  File TypeAPPENDIX_H.pdf 150,533
04/27/2009  File TypeAPPENDIX_G.pdf 61,085
04/27/2009  File TypeAPPENDIX_F.pdf 87,699
04/27/2009  File TypeAPPENDIX_E.pdf 59,369
04/27/2009  File TypeAPPENDIX_D.pdf 199,292
04/27/2009  File TypeAPPENDIX_C.pdf 60,884
04/27/2009  File TypeAPPENDIX_B.pdf 7,247,466
04/27/2009  File TypeAPPENDIX_A.pdf 804,157
04/27/2009  File Type5637CFR_KSDB24Apr09.pdf 3,297,664
Project: Corrosion Assessment Criteria: Rationalizing Their Use Applied to Early vs Modern Pipelines (Battelle Memorial Institute)
03/14/2006  File TypeFinalCorrosionCriteriaReport.pdf 2,623,320
Project: Advanced Welding Repair and Remediation Methods for In-service Pipelines (Edison Welding Institute, Inc.)
07/30/2007  File TypeDTRS56-03-T-0009_Final_Report.pdf 9,928,288
Project: First Major Improvements to the Two-curve Fracture Arrest Model (Engineering Mechanics Corporation of Columbus)
05/30/2007  File TypeEmc2_-First_major_improvement_to_BTC_final_report_-full_document.pdf 8,774,528
04/05/2010  File TypePIPE-DFRAC_setup.zip 9,481,150
Project: An Assessment of Magnetization Effects on Hydrogen Cracking for Thick-Walled Pipelines (Colorado School of Mines)
03/19/2007  File TypeFinal Report - Hydrogen Measurement Probe.pdf 18,123,915
Project: An Assessment of Safety, Risks & Costs Associated with Subsea Pipeline Removals (Scandpower Risk Management, Inc.)
10/06/2004  File TypeProjno124_Scandpower_Final_Report_Aug_04.pdf 2,185,705
Project: NoPig Metal-Loss Detection System for Non-Piggable Pipelines (FINO AG, Hildersheil Germany)
01/19/2005  File TypeProjno122_FinalReport_011905.pdf 631,750
Project: High CP Potential Effects on Pipelines (Det Norske Veritas (U.S.A.), Inc.)
01/26/2005  File TypeProjno121_FinalReport_Nov2004.pdf 8,672,159
Project: Emerging Padding and Related Pipeline Construction Practices (Battelle Memorial Institute)
02/06/2006  File TypeFR-RSPA-B-P020206revision.pdf 3,866,518
Project: Internal Corrosion Direct Assessment (ICDA) of Gas Transmission, Gathering, and Storage Systems (Southwest Research Institute)
12/30/2004  File TypeProjno119_Final_Report_123004.pdf 4,685,973
Project: Improvements to the External Corrosion Direct Assessment Methodology by Incorporating Soils Data (Battelle Memorial Institute)
07/07/2006  File TypeProjno118-Final-Report-Soils_Model-FR.pdf 1,141,668
Project: Assessment & Validation of TFI-Identified Anomalies Criteria for Repair and Available Repair Methods (Det Norske Veritas (U.S.A.), Inc.)
01/26/2005  File TypeProjno115_Final_Appendix_A_Jan05.pdf 4,424,217
01/26/2005  File TypeProjno115_Final_Jan05.pdf 291,315
01/26/2005  File TypeProjno115_Final_Appendix_B_Jan05.pdf 12,787,737
Project: Pipeline Damage Prevention Through the Use of Locatable Magnetic Plastic Pipe and a Universal Locator (Gas Technology Institute)
01/02/2006  File TypeProjno111-Final-Report-12292005.pdf 705,227
Project: Baseline Study of Alternative In-Line Inspection Vehicles (Southwest Research Institute)
04/27/2004  File TypeProjectno110-FinalReport-October2003.pdf 787,052
Project: Digital Mapping of Buried Pipelines with a Dual Array System (Witten Technologies, Inc.)
02/11/2009  File TypeUSDOT_DUAL_ARRAY_PROJECT_FINAL_REPORT_PUBLIC.pdf 900,515
Project: Feasibility of In-Line Stress Measurement by Continuous Barkhausen Method (Southwest Research Institute)
08/27/2004  File TypeProjNo_108_Final_Report_June04_Guidelines.pdf 1,675,496
Project: Mechanical Damage Inspection Using MFL Technology (Battelle Memorial Institute)
06/02/2005  File TypeProjno107_FinalReview2005-may-4.pdf 3,136,862
PHMSA Home | Pipeline Safety Website | Feedback | Privacy Policy | FOIA