RICHMOND, CITY OF

(Operator ID:17360 - CURRENTLY ACTIVE OPID)

Main Operator Report Page - Incidents and Mileage - Federal Inspection and Enforcement Data - More Pipeline Operators

The reports below provide inspection and enforcement data for the most recent 5-year period. This information includes only completed (not planned or ongoing) inspections and the enforcement actions pursued at the Federal level by PHMSA on Federally-inspected mileage. The number, type, inspection days, and date of inspections conducted by PHMSA are included, as well as both a summary of and specific details pertaining to enforcement cases against this operator.

In some cases, State pipeline safety agencies also provide oversight and enforcement on certain intrastate pipeline facilities (State-inspected mileage). Inspections and enforcement by PHMSA's partner State agencies are not included in these reports; however, information on State-initiated enforcement action is available at State Pages.

For more information on each inspection type see the Inspection Activity Glossary.

RICHMOND, CITY OF Federal Inspections
All Pipeline Systems(1) : 2006-2016
2016 YTD 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 Total
Site-Specific Field Inspection
Number 2 1 1 2 4 4 2 4 2 1 2 25
Days On-Site 34 36 49 58 22 42 7 6 10 0 0 264
System-Wide Program Inspection
Number 0 0 1 0 1 0 0 0 0 0 0 2
Days On-Site 0 0 4 0 4 0 0 0 0 0 0 8
Targeted Inspection/Investigation
Number 0 3 1 0 4 1 4 0 0 0 0 13
Days On-Site 0 33 1 0 30 5 14 0 0 0 0 83

Site-Specific Field Inspections - Include inspections and other compliance-related activities conducted at specific facilities or along specific lengths of pipelines ("Inspection Units"). Types of inspections/activities include on-site field verification of an operator's implementation of procedures and programs associated with corrosion control, integrity management, training and qualification, public awareness and damage prevention, control center operations, emergency preparedness and response, and other pipeline safety and compliance tasks.

System-Wide Program Inspections - Include inspections and other compliance-related activities that cover pipeline safety programs and processes that apply broadly across an operator's entire network of pipeline facilities. Types of inspections/activities include those which cover operating and maintenance procedures, integrity management and operator qualification programs, and integrated inspection of all operator safety and compliance programs.

Targeted Inspections/Investigations - Include inspections, investigations, and other activities related to specific pipeline safety areas which have been targeted for special review or emphasis. Types of activities include failure investigations, investigations into public concerns or complaints, drug and alcohol program inspections, new construction inspections, and other special-focus inspections or investigations.

For more information on each inspection type see the Inspection Activity Glossary.

For more information on each inspection type see the Inspection Activity Glossary.

RICHMOND, CITY OF Federal Inspections
All Pipeline Systems(1) : 2006-2016
Start Date Category Type PHMSA Lead Region Enforcement Case(s) Initiated
02/03/16 Site-Specific Field Inspection Unit Inspection Eastern
01/01/16 Site-Specific Field Inspection Unit Inspection Eastern
04/22/15 Targeted Inspection/Investigation Specialized Inspection Eastern 120150012W
01/13/15 Targeted Inspection/Investigation Specialized Inspection Eastern 120150009W
01/01/15 Targeted Inspection/Investigation Construction Inspection Eastern
01/01/15 Site-Specific Field Inspection Unit Inspection Eastern 120150010W,120150011
04/09/14 System-Wide Program Inspection Integrity Management Inspection Eastern 120150001M
02/24/14 Targeted Inspection/Investigation Specialized Inspection Eastern 120150002W
01/01/14 Site-Specific Field Inspection Unit Inspection Eastern
06/03/13 Site-Specific Field Inspection Unit Inspection Eastern 120150006M,120150007W,120150008
01/01/13 Site-Specific Field Inspection Unit Inspection Eastern
11/13/12 Site-Specific Field Inspection Unit Inspection Eastern 120140001
07/26/12 Site-Specific Field Inspection Unit Inspection Eastern 120130003
03/12/12 Site-Specific Field Inspection Unit Inspection Eastern 120130004W
02/21/12 System-Wide Program Inspection General Operations Inspection Eastern
01/17/12 Targeted Inspection/Investigation Other Inspection Eastern
01/13/12 Targeted Inspection/Investigation Other Inspection Eastern
01/01/12 Site-Specific Field Inspection Integrity Management Field Verification Eastern
01/01/12 Targeted Inspection/Investigation Construction Inspection Eastern
01/01/12 Targeted Inspection/Investigation Specialized Inspection Eastern
12/08/11 Site-Specific Field Inspection Unit Inspection Eastern 120130001
11/16/11 Site-Specific Field Inspection Unit Inspection Eastern 120130002W
05/12/11 Targeted Inspection/Investigation Specialized Inspection Eastern
01/01/11 Site-Specific Field Inspection Unit Inspection Eastern
01/01/11 Site-Specific Field Inspection Unit Inspection Eastern 120110002
09/14/10 Targeted Inspection/Investigation Construction Inspection Eastern 120110001
08/25/10 Targeted Inspection/Investigation Other Inspection Eastern
02/16/10 Site-Specific Field Inspection Unit Inspection Eastern
02/16/10 Site-Specific Field Inspection Unit Inspection Eastern 120100004
02/05/10 Targeted Inspection/Investigation Specialized Inspection Eastern
01/21/10 Targeted Inspection/Investigation Construction Inspection Eastern
05/27/09 Site-Specific Field Inspection Unit Inspection Eastern 120100001
04/28/09 Site-Specific Field Inspection Unit Inspection Eastern 120100001
03/26/09 Site-Specific Field Inspection Unit Inspection Eastern 120100001
02/24/09 Site-Specific Field Inspection Unit Inspection Eastern
03/27/08 Site-Specific Field Inspection Unit Inspection Eastern 120100002W
02/05/08 Site-Specific Field Inspection Unit Inspection Eastern 120100005M,120100006W
05/01/07 Site-Specific Field Inspection Unit Inspection Eastern 120100003W
12/12/06 Site-Specific Field Inspection Unit Inspection Eastern 120100003W
12/05/06 Site-Specific Field Inspection Unit Inspection Eastern 120100003W

For more information on each enforcement type see the Enforcement Type Glossary.

RICHMOND, CITY OF Federal Enforcement Cases
All Pipeline Systems(1) : 2006-2016
2016 YTD 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 Total
Cases Initiated 0 9 1 4 0 2 6 0 0 0 0 22
Cases Resolved 2 6 3 3 2 2 3 1 0 0 2 24
Penalties Proposed 0 0 5,600 43,700 0 84,000 105,900 0 0 0 0 239,200
Corrective Action Orders Issued 0 0 0 0 0 0 0 0 0 0 0 0

Cases Initiated: These are the yearly total of civil administrative enforcement actions that PHMSA has brought against pipeline owners and operators. It does not reflect those cases which the agency has referred to other Federal officials for criminal prosecution, nor does it include more egregious civil cases that are referred to the U.S. Department of Justice for judicial enforcement. The table shows the total number of Corrective Action Orders, Notices of Probable Violations, Notices of Amendment, Warning Letters, and Notices of Proposed Safety Orders issued in a given year.

Cases Resolved: These are the yearly total of PHMSA actions taken to resolve the various types of enforcement actions against operators. This includes the number of Corrective Action Orders, Final Orders, Notices of Amendment, and Consent Orders that have either been closed or issued in a given year. When an enforcement action is shown as "closed", PHMSA has verified that all of the corrective actions have been successfully completed and that any inadequate procedures that were identified successfully addressed. Enforcement actions shown as "issued" mean that corrective actions have been established that are acceptable to PHMSA, and that civil penalty assessments have been finalized.

For more information on each enforcement type see the Enforcement Type Glossary.

RICHMOND, CITY OF Federal Enforcement Cases
All Pipeline Systems(2): 2006-2016
Case Number Date Opened Date Closed Type Subject PHMSA Region Status Proposed Penalty Assessed Penalty Collected Penalty Final Compliance Order
120150012W 09/03/15 09/03/15 Warning Letter Operations - Gas Pipelines
EASTERN CLOSED $0 No
120150011 09/03/15 06/16/16 Proposed Compliance Order Maintenance - Gas Pipelines
EASTERN CLOSED $0 Yes
120150010W 08/24/15 08/24/15 Warning Letter Corrosion Control - Gas Pipelines
Procedure Manuals - Gas Pipelines
EASTERN CLOSED $0 No
120150009W 06/26/15 06/26/15 Warning Letter Operations - Gas Pipelines
EASTERN CLOSED $0 No
120150008 03/17/15 / / Proposed Compliance Order Corrosion Control - Gas Pipelines
EASTERN OPEN $0 Yes
120150007W 03/17/15 03/17/15 Warning Letter Corrosion Control - Gas Pipelines
EASTERN CLOSED $0 No
120150006M 03/17/15 06/03/15 Notice of Amendment Procedure Manuals - Gas Pipelines
EASTERN CLOSED $0 No
120150001M 02/12/15 03/01/16 Notice of Amendment Integrity Management - Gas Pipelines
EASTERN CLOSED $0 No
120150002W 02/12/15 02/12/15 Warning Letter Material Joining other than Welding - Gas Pipelines
Procedure Manuals - Gas Pipelines
EASTERN CLOSED $0 No
120140001 02/18/14 11/06/14 Proposed Civil Penalty
Warning Item
Corrosion Control - Gas Pipelines
Maintenance - Gas Pipelines
EASTERN CLOSED $5,600 $5,600 $5,600 No
120130004W 09/06/13 09/06/13 Warning Letter Procedure Manuals - Gas Pipelines
EASTERN CLOSED $0 No
120130003 09/03/13 11/26/14 Proposed Civil Penalty
Proposed Compliance Order
Corrosion Control - Gas Pipelines
EASTERN CLOSED $10,000 $10,000 $10,000 Yes
120130002W 07/12/13 07/12/13 Warning Letter Corrosion Control - Gas Pipelines
Maintenance - Gas Pipelines
EASTERN CLOSED $0 No
120130001 05/02/13 05/12/14 Proposed Civil Penalty Procedure Manuals - Gas Pipelines
EASTERN CLOSED $33,700 $12,000 $12,000 No
120110002 10/25/11 05/23/12 Proposed Civil Penalty Procedure Manuals - Gas Pipelines
EASTERN CLOSED $25,000 $25,000 $25,000 No
120110001 05/09/11 08/21/12 Proposed Civil Penalty
Warning Letter
Corrosion Control - Gas Pipelines
Maintenance - Gas Pipelines
Meters, Regulators, and Service Lines - Gas Pipelines
EASTERN CLOSED $59,000 $40,000 $40,000 No
120100004 10/14/10 01/24/11 Proposed Civil Penalty
Warning Letter
Procedure Manuals - Gas Pipelines
Procedure Manuals - Gas Pipelines (withdrawn)
EASTERN CLOSED $56,200 $0   No
120100005M 10/13/10 03/08/11 Notice of Amendment Failure Investigation - Gas Pipelines
Procedure Manuals - Gas Pipelines
EASTERN CLOSED $0 No
120100006W 10/13/10 10/13/10 Warning Letter Maintenance - Gas Pipelines
Procedure Manuals - Gas Pipelines
EASTERN CLOSED $0 No
120100001 05/06/10 03/14/13 Proposed Civil Penalty
Warning Letter
Construction - Gas Pipelines
Material Joining other than Welding - Gas Pipelines
Meters, Regulators, and Service Lines - Gas Pipelines (withdrawn)
EASTERN CLOSED $49,700 No
120100002W 05/03/10 05/03/10 Warning Letter Material Joining other than Welding - Gas Pipelines
EASTERN CLOSED $0 No
120100003W 05/03/10 05/03/10 Warning Letter Construction - Gas Pipelines
Procedure Manuals - Gas Pipelines
EASTERN CLOSED $0 No
120040006 09/02/04 11/05/09 Proposed Civil Penalty
Proposed Compliance Order
Incident Reports - Gas Pipelines
Maintenance - Gas Pipelines
Qualification of Pipeline Personnel - Gas Pipelines (withdrawn)
EASTERN CLOSED $80,000 $30,000 $30,000 Yes
120040005M 09/02/04 06/19/06 Notice of Amendment Procedure Manuals - Gas Pipelines
EASTERN CLOSED $0 No
120010002 12/06/01 06/30/06 Proposed Civil Penalty
Proposed Compliance Order
Procedure Manuals - Gas Pipelines (withdrawn)
EASTERN CLOSED $25,000 $0   No
Totals        $344,200 $122,600 $122,600  

Sources

  1. PHMSA Safety Monitoring and Reporting Tool (SMART) for the Pipeline Inspection Tracking System as of September 30, 2016.
  2. PHMSA Safety Monitoring and Reporting Tool (SMART) for the Pipeline Safety Enforcement Tracking System as of October 3, 2016.

For comments and questions on the information presented on this site, please send us feedback.

Feedback | Information Highlights | Privacy Policy | Accessibility Policy | ©2005-2016 PHMSA | DOT Home | PHMSA Home | PSA Forum | Adobe Reader | Generated: 10/06/16 04:13:43 PM