GAS TRANSMISSION NORTHWEST LLC

(Operator ID:15014 - CURRENTLY ACTIVE OPID)

Main Operator Report Page - Incidents and Mileage - Federal Inspection and Enforcement Data - More Pipeline Operators

The reports below provide inspection and enforcement data for the most recent 5-year period. This information includes only completed (not planned or ongoing) inspections and the enforcement actions pursued at the Federal level by PHMSA on Federally-inspected mileage. The number, type, inspection days, and date of inspections conducted by PHMSA are included, as well as both a summary of and specific details pertaining to enforcement cases against this operator.

In some cases, State pipeline safety agencies also provide oversight and enforcement on certain intrastate pipeline facilities (State-inspected mileage). Inspections and enforcement by PHMSA's partner State agencies are not included in these reports; however, information on State-initiated enforcement action is available at State Pages.

For more information on each inspection type see the Inspection Activity Glossary.

GAS TRANSMISSION NORTHWEST LLC Federal Inspections
All Pipeline Systems(1) : 2006-2016
2016 YTD 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 Total
Site-Specific Field Inspection
Number 0 0 5 0 4 5 4 3 7 6 3 37
Days On-Site 0 0 26 0 6 15 11 8 23 21 23 132
System-Wide Program Inspection
Number 0 0 1 0 0 0 1 0 2 0 0 4
Days On-Site 0 0 30 0 0 0 54 0 6 0 0 90
Targeted Inspection/Investigation
Number 1 1 1 2 1 1 0 0 1 0 0 8
Days On-Site 2 5 7 6 2 6 0 0 1 0 0 29

Site-Specific Field Inspections - Include inspections and other compliance-related activities conducted at specific facilities or along specific lengths of pipelines ("Inspection Units"). Types of inspections/activities include on-site field verification of an operator's implementation of procedures and programs associated with corrosion control, integrity management, training and qualification, public awareness and damage prevention, control center operations, emergency preparedness and response, and other pipeline safety and compliance tasks.

System-Wide Program Inspections - Include inspections and other compliance-related activities that cover pipeline safety programs and processes that apply broadly across an operator's entire network of pipeline facilities. Types of inspections/activities include those which cover operating and maintenance procedures, integrity management and operator qualification programs, and integrated inspection of all operator safety and compliance programs.

Targeted Inspections/Investigations - Include inspections, investigations, and other activities related to specific pipeline safety areas which have been targeted for special review or emphasis. Types of activities include failure investigations, investigations into public concerns or complaints, drug and alcohol program inspections, new construction inspections, and other special-focus inspections or investigations.

For more information on each inspection type see the Inspection Activity Glossary.

For more information on each inspection type see the Inspection Activity Glossary.

GAS TRANSMISSION NORTHWEST LLC Federal Inspections
All Pipeline Systems(1) : 2006-2016
Start Date Category Type PHMSA Lead Region Enforcement Case(s) Initiated
01/11/16 Targeted Inspection/Investigation Construction Inspection Western
08/10/15 Targeted Inspection/Investigation Construction Inspection Western
11/14/14 Targeted Inspection/Investigation Failure Investigation Western
09/08/14 Site-Specific Field Inspection Integrated Inspection Western
07/07/14 Site-Specific Field Inspection Integrated Inspection Western
01/22/14 System-Wide Program Inspection Integrated Inspection Western 520151006W
01/22/14 Site-Specific Field Inspection Integrated Inspection Western
01/22/14 Site-Specific Field Inspection Integrated Inspection Western
01/22/14 Site-Specific Field Inspection Integrated Inspection Western
10/21/13 Targeted Inspection/Investigation Other Inspection Western
03/19/13 Targeted Inspection/Investigation Failure Investigation Western
06/26/12 Site-Specific Field Inspection Operator Qualification Field Verification Western
06/25/12 Site-Specific Field Inspection Integrity Management Field Verification Western
06/18/12 Site-Specific Field Inspection Unit Inspection Western
03/27/12 Site-Specific Field Inspection Integrity Management Field Verification Western
03/27/12 Targeted Inspection/Investigation Specialized Inspection Western
12/01/11 Site-Specific Field Inspection Integrity Management Field Verification Western
12/01/11 Site-Specific Field Inspection Operator Qualification Field Verification Western
11/28/11 Site-Specific Field Inspection Unit Inspection Western 520121012W
02/02/11 Targeted Inspection/Investigation Specialized Inspection Western
01/03/11 Site-Specific Field Inspection Unit Inspection Western 520111009W
01/03/11 Site-Specific Field Inspection Unit Inspection Western 520121004W
08/27/10 Site-Specific Field Inspection Operator Qualification Field Verification Western
08/23/10 Site-Specific Field Inspection Unit Inspection Western
05/17/10 System-Wide Program Inspection Integrity Management Inspection Western
05/17/10 Site-Specific Field Inspection Unit Inspection Western
04/01/10 Site-Specific Field Inspection Integrity Management Field Verification Western
09/11/09 Site-Specific Field Inspection Integrity Management Field Verification Western
09/09/09 Site-Specific Field Inspection Operator Qualification Field Verification Western
08/24/09 Site-Specific Field Inspection Unit Inspection Western 520101005
10/19/08 System-Wide Program Inspection General Operations Inspection Western
10/09/08 System-Wide Program Inspection General Operations Inspection Western
09/08/08 Site-Specific Field Inspection Unit Inspection Western
06/20/08 Site-Specific Field Inspection Operator Qualification Field Verification Western
06/20/08 Site-Specific Field Inspection Operator Qualification Field Verification Western
03/28/08 Site-Specific Field Inspection Operator Qualification Field Verification Western
03/24/08 Site-Specific Field Inspection Unit Inspection Western
03/05/08 Site-Specific Field Inspection Unit Inspection Western
03/03/08 Site-Specific Field Inspection Unit Inspection Western
03/03/08 Targeted Inspection/Investigation Other Inspection Western
10/29/07 Site-Specific Field Inspection Unit Inspection Western
07/13/07 Site-Specific Field Inspection Operator Qualification Field Verification Western
07/10/07 Site-Specific Field Inspection Operator Qualification Field Verification Western
06/24/07 Site-Specific Field Inspection Unit Inspection Western 520081003M,520081004
06/14/07 Site-Specific Field Inspection Unit Inspection Western 520071013W
06/11/07 Site-Specific Field Inspection Unit Inspection Western 520071013W
11/13/06 Site-Specific Field Inspection Unit Inspection Western 520070015W,520070016M
08/28/06 Site-Specific Field Inspection Unit Inspection Western 520070018W
01/30/06 Site-Specific Field Inspection Unit Inspection Western 520070018W

For more information on each enforcement type see the Enforcement Type Glossary.

GAS TRANSMISSION NORTHWEST LLC Federal Enforcement Cases
All Pipeline Systems(1) : 2006-2016
2016 YTD 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 Total
Cases Initiated 0 1 0 0 2 1 1 0 2 4 2 13
Cases Resolved 0 1 0 1 1 2 0 2 1 5 1 14
Penalties Proposed 0 0 0 0 0 0 0 0 0 0 2,000 2,000
Corrective Action Orders Issued 0 0 0 0 0 0 0 0 0 0 0 0

Cases Initiated: These are the yearly total of civil administrative enforcement actions that PHMSA has brought against pipeline owners and operators. It does not reflect those cases which the agency has referred to other Federal officials for criminal prosecution, nor does it include more egregious civil cases that are referred to the U.S. Department of Justice for judicial enforcement. The table shows the total number of Corrective Action Orders, Notices of Probable Violations, Notices of Amendment, Warning Letters, and Notices of Proposed Safety Orders issued in a given year.

Cases Resolved: These are the yearly total of PHMSA actions taken to resolve the various types of enforcement actions against operators. This includes the number of Corrective Action Orders, Final Orders, Notices of Amendment, and Consent Orders that have either been closed or issued in a given year. When an enforcement action is shown as "closed", PHMSA has verified that all of the corrective actions have been successfully completed and that any inadequate procedures that were identified successfully addressed. Enforcement actions shown as "issued" mean that corrective actions have been established that are acceptable to PHMSA, and that civil penalty assessments have been finalized.

For more information on each enforcement type see the Enforcement Type Glossary.

GAS TRANSMISSION NORTHWEST LLC Federal Enforcement Cases
All Pipeline Systems(2): 2006-2016
Case Number Date Opened Date Closed Type Subject PHMSA Region Status Proposed Penalty Assessed Penalty Collected Penalty Final Compliance Order
520151006W 06/05/15 06/05/15 Warning Letter Integrity Management - Gas Pipelines
Operations - Gas Pipelines
WESTERN CLOSED $0 No
520121012W 05/17/12 05/17/12 Warning Letter Corrosion Control - Gas Pipelines
WESTERN CLOSED $0 No
520121004W 02/21/12 08/16/13 Warning Letter Pipeline Component Design - Gas Pipelines
WESTERN CLOSED $0 No
520111009W 11/01/11 11/01/11 Warning Letter Maintenance - Gas Pipelines
WESTERN CLOSED $0 No
520101005 09/21/10 05/27/11 Proposed Compliance Order Corrosion Control - Gas Pipelines
WESTERN CLOSED $0 Yes
520081004 01/11/08 10/01/09 Proposed Compliance Order
Warning Letter
Corrosion Control - Gas Pipelines
Maintenance - Gas Pipelines
Procedure Manuals - Gas Pipelines
WESTERN CLOSED $0 Yes
520081003M 01/09/08 03/03/08 Notice of Amendment Corrosion Control - Gas Pipelines
Maintenance - Gas Pipelines
Welding - Gas Pipelines
WESTERN CLOSED $0 No
520071013W 10/03/07 10/03/07 Warning Letter Maintenance - Gas Pipelines
WESTERN CLOSED $0 No
520070018W 04/26/07 04/26/07 Warning Letter Corrosion Control - Gas Pipelines
WESTERN CLOSED $0 No
520070015W 04/20/07 04/20/07 Warning Letter Emergency Response - Gas Pipelines
Operations - Gas Pipelines
WESTERN CLOSED $0 No
520070016M 04/20/07 06/16/07 Notice of Amendment Maintenance - Gas Pipelines
WESTERN CLOSED $0 No
520061012W 06/15/06 06/15/06 Warning Letter Maintenance - Gas Pipelines
WESTERN CLOSED $0 No
520061011 06/15/06 11/24/09 Proposed Civil Penalty
Warning Letter
Maintenance - Gas Pipelines
Procedure Manuals - Gas Pipelines
Welding - Gas Pipelines
WESTERN CLOSED $2,000 $2,000 $2,000 No
520030006 05/29/03 05/03/07 Letter of Concern
Proposed Compliance Order
Warning Letter

Corrosion Control - Gas Pipelines
Maintenance - Gas Pipelines
WESTERN CLOSED $0 Yes
Totals        $2,000 $2,000 $2,000  

Sources

  1. PHMSA Safety Monitoring and Reporting Tool (SMART) for the Pipeline Inspection Tracking System as of September 30, 2016.
  2. PHMSA Safety Monitoring and Reporting Tool (SMART) for the Pipeline Safety Enforcement Tracking System as of October 3, 2016.

For comments and questions on the information presented on this site, please send us feedback.