Summary of Findings The directional and highly anisotropic nature of advanced composites, and of the fibers themselves, make connections and detailing of local force transfer regions paramount design considerations. For new advanced composite structural systems, success depends largely on the connections. Specifically, the ease and speed with which individual components can be assembled and the performance of these connections, over time, in typically highly stressed regions will determine the viability of these systems. Different connection systems were encountered in Europe and Japan. In the Aberfeldy (E2) and Bonds Mill Bridges (E3), Maunsell used adhesive bonding and special pultruded connector elements with a mechanical toggle system (Figure 13). In Japan (J3), a more traditional steel construction approach was employed, using bolted connections, in which the bolts are manufactured from GFRP (Figure 14). In all three new bridge demonstration projects, the connections are significantly overdesigned and exposed to low permanent stress levels. Maunsell also developed a special suspender, or bracket, system for its bridge enclosure concept (E4). Both in Europe (E5, E9) and in Japan (J1, J3), reinforcement and cable systems mimic conventional reinforcement and tendon anchorage details, in the form of bonds with deformed bars or twisted strands and in metallic anchorage housings for prestressing tendons. In Japan, nonmetallic cable anchorages of GFRP were installed in one of the demonstration projects (J4). To eliminate tendon failures in the anchorage, new types of filler materials in the anchor cones need to be developed to ensure a gradual force transfer with constant shear stress distribution between the composite tendons and the anchor block housing. This force transfer is accomplished through the use of resin fillers of various stiffnesses inside the conical anchorage. A significantly larger force transfer and, therefore, total anchorage length, is required for advanced composite tendons than for steel tendons. Tendon anchorage systems that are based on significant research and development and show promise for future applications include the anchor cone and spike for the dry parallel aramid fiber cable, developed by Linear Composites, Ltd., and known as Parafil7 (E1, E2). In addition, the carbon tendon anchorage with gradated filler stiffness through the addition of aluminum oxide pellets in the epoxy filler, developed by BBR and EMPA (E8, E9) shows promise for future applications (see concept in Figure 15). Another promising technology is the GFRP anchor-age housing developed as part of the Tech-nora7 post-tensioning system and applied in one of the Sumitomo demonstration bridge projects (J4). Very limited data on actual failure loads and locations of tendon and anchorage systems and on manufacturing and installation costs were made available to the team. Finally, the connections between FRP laminate or sheet-strengthening measures and the existing concrete structures are typically controlled by the tensile (horizontal shear) strength of the existing concrete substrate. Because of the low substrate tensile characteristics and the high tensile capacity in the adhesive/resin system, generally no special design or detailing requirements arise. Other considerations include prestress CFRP laminates or applications where high forces can develop in discrete laminate strip systems and additional anchorage requirements into the concrete core or to the compression zone of the member. Relevance to U.S. Practice Although the connections and details observed by the scanning team seemed functional and well developed, they also represent fairly complicated systems that will be difficult to transfer to the U.S. market because of cost implications. The advantages of the manufacturing and assembly phases of the connections and details observed may be limited and do not seem to justify replacement of conventional construction technology in the United States. Transferable Technologies Specific technologies related to connections and details that deserve further investigation for transfer to the U.S. market are the CFRP cable anchorage system in Switzerland, the glass-fiber-reinforced composite (GFRC) nonmetallic anchorage developed in Japan, and the connection details of Maunsell's ACCS. Research and Development Needs For complete composite bridge structures, no connections of guard or barrier rails to the composite bridge deck have been developed. All connection systems need to be exposed and evaluated for durability under the typical civil engineering environment. This evaluation would include short-term accelerated tests and permanent instrumentation and monitoring of demonstration projects.
3.6 INSTRUMENTATION AND MONITORING (TOPIC 6) Summary of Findings One of the surprising findings of the team was that, despite the many questions and concerns raised about the durability characteristics of FRPs in the civil engineering environment, no long-term field instrumentation and monitoring plans for prototype projects have been developed or implemented. The only permanent monitoring system was encountered at the Schiessbergstrasse Bridge (E7) in Leverkusen, Germany, where the Polystal7 tendon system has effectively been discontinued in production. The emphasis of this monitoring system was more on the demonstration of the instruments, data gathering, and transmission than on the continued performance monitoring of the bridge. Short-term testing and monitoring over and above simple service load tests and one-time, in situ proof load tests are performed systematically both in Germany and Switzerland. In England, limited tests were primarily con-ducted to support academic studies. Most short-term monitoring programs were discontinued after a few years, because the bridge response had stabilized and no changes were recorded. No permanent or semipermanent instrumentation on the prototype structures visited in Japan was encountered. All countries visited conduct laboratory or demonstration field tests as part of their FRP system development and in situ service load tests. Conventional strain and deflection measurements seem to be routinely conducted following the FRP installations. However, no specific plans or schedules exist to repeat service load or proof load tests at regular intervals to determine changes in response characteristics. In terms of instrumentation technology, embedded fiber optic sensors in composite cable systems (i.e., Bragg sensors) (E5, E7, E8, E9) provide convenient strain measurements. In addition, the fiber optic and copper wire sensors embedded in the individual GFRP rods during the manufacturing of Polystal7 (Figure 16) show the vision to produce smart materials (E5) that simplify continued health monitoring. Complete bridge monitoring systems with remote real- time data transmission and online data checks with predicted performance models and built-in warning systems were presented by Deha Com in Germany (E5, E7). These sensors consisted of fiber optic and copper wire strain sensors, chemical corrosion gauges, and crack location and crack width instrumentation. Relevance to U.S. Practice The most significant finding related to U.S. practice was not so much what was encountered abroad in terms of monitoring and instrumentation systems, but rather in what does not seem to be done anywhere in the world. The team did not observe a comprehensive development and implementation plan for long-term monitoring and data generation in direct support of durability, general structural health, and life-cycle cost data development. Transferable Technologies Individual instrumentation and sensor technology is not new to the United States, and most of the technology encountered by the scanning team has actually been developed in the United States. For example, fiber optic Bragg sensors were developed by the U.S. Navy. The concept of smart materials that have sensors installed during the manufacturing process, such as Polystal7 (E5), should be pursued. Research and Development Needs Instrumentation and measurement systems need to be developed, and a comprehensive, long-term monitoring plan should be established and implemented on a series of prototype demonstration projects. Questions and concerns still exist about the durability of FRPs in the civil engineering environment, under such conditions as the following:
3.7 DURABILITY (TOPIC 7) Summary of Findings Durability, or the capacity to maintain visual and structural integrity with time in typical civil engineering environments, seems to be the most controversial aspect of advanced composite materials worldwide. The durability of FRPs is often cited as their strongest selling point, particularly when problems with a rapidly aging and deteriorating bridge infrastructure are being addressed. On the other hand, questions concerning uncertainties with the long-term performance of FRPs in terms of ultraviolet resistance, creep, relaxation, stress corrosion, chemical resistance, and fire exposure are raised around the world and must be answered before general acceptance by the civil engineering and construction community. The difficulty with determining long-term structural integrity of FRPs arises from the multitude of fiber, resin, and manufacturing systems and their widely different performance characteristics under exposure to permanent loads and various environmental conditions. Frequently, the limited short-comings of one material's system are generalized to all other FRPs or demands are placed on FRPs, such as fire exposure and resistance requirements, that are not placed on any other bridge construction material. To provide answers to questions of durability, accelerated tests and long-term exposure tests are conducted around the world. Typically, however, these tests are focused on one specific system and application, making extrapolations to other systems and environments difficult. Furthermore, the scientific community is still divided on the issues of merit and the meaning of accelerated tests and their correlation to actual exposures in the everyday environment. A good example is the potential problem of alkaline reaction with glass. Rapid degradation rates of glass can be shown in elevated pH environments, but contact with aged concrete may not be represented by these tests. Another example concerns aramids, which, when submerged in water, show very high water absorption rates that may not occur in AFRPs in typical bridge applications. Most of the FRP applications in bridge projects observed during the scanning tour were based on CFRPs. This was largely attributed to the high degree of chemical inertness of carbon fibers and the resulting durability benefits. Glass fibers were found in only limited applications, namely in the bridge systems made entirely of advanced composites (E2, E3, E4, and J3), as well as for reinforcing elements in the form of a post-tensioning system (E6, E7, E8) and a reinforcement grid (J1). The use of aramids was observed in the form of a dry parallel fiber cable system (E1, E2), as reinforcement and prestressing systems (J1, J4, J5, and J11), and as a seismic retrofit concept (J6). All other applications used CFRPs, largely because of durability considerations, but also based on the mechanical properties of the carbon fibers, in particular their modulus. Each country or region visited focuses on different material systems and, to a certain degree, justifies the choice with durability. Bridge applications in the United Kingdom focused on glass and aramids; in Germany, on glass; in Switzerland, on carbon; and, in Japan, on carbon and aramids. Although these choices are mostly driven by the countries' predominant types of applications, justifications are largely sought in the expected long-term performance (see Table 5 from reference [8]). All discussions on durability seem to point in one direction, which is: For specific applications, clear long-term performance specifications must be established, and the advanced composite industry must meet and ensure performance goals. In addition to well-defined short-term and accelerated test protocols, carefully planned and monitored field demonstration projects must be con-ducted to correlate some of the accelerated test data and to develop durability and service life prediction models. Relevance to U.S. Practice The durability issues of advanced composite materials in the civil engineering environment are the same around the world, and all established research data are clearly relevant to U.S. practice. Durability research in the United States does not seem to lag behind, however, and can be characterized as more generic and less system specific. Transferable Technologies One important aspect of durability observed during the scanning tour was the determination of structural integrity of CFRP laminates under elevated temperatures and fire exposure. Testing protocols, procedures, and data of these fire tests are relevant to U.S. applications. Research and Development Needs Systematic definition of performance characteristics, short-term validation tests, accelerated exposure tests, and long-term monitoring are required to provide a generic data base for FRP durability in civil engineering environments. Table 5. Quantitative Rating of Fiber Types [8]
Ratings: 3=very good, 2=good, 1=adequate, 0=inadequate
3.8 RESEARCH (TOPIC 8) Summary of Findings The introduction of new materials to the civil engineering and construction environments requires significant research and development. This was obvious at all stages of the technology scanning tour. Of interest, however, is the way in which research and development are conducted in the various countries visited. In the United Kingdom, industry seems to take the lead with ideas and product development, which are then supported by application-specific university testing. In addition, universities engage in smaller scale generic research to characterize FRP performance. Furthermore, large demonstration projects are implemented (E2, E3) following, or sometimes in parallel with, a few large-scale laboratory validation tests. In Germany, the developments of the GFRP Polystal7 post-tensioning system were led by industry and supported by government with systematic university research and validation testing. In Switzerland, the main thrust of research comes from EMPA, which has close ties to industry. Because EMPA is affiliated with the Swiss Federal Technical University (ETH), academic research is part of the development program. Key factors in the research at EMPA are the federally funded laboratories and research staff. The research is very systematic, but also very project and product specific. Finally, in Japan, most of the research and development is initiated, funded, and con-ducted in the industry sector. Government research laboratories, such as PWRI of the Japan Ministry of Construction, are charged with coordination and writing of specifications and standards. Most notable in Japan are the close alliance between the construction industry and the advanced composite manufacturing industry and the organization of industrial participants in national interest groups, such as the Advanced Composite Cable (ACC) Club. Such organizations promote their products and train the engineering community in the use of new technologies. Research in Japan is based on a significant amount of large-scale experimental testing of specific ideas and principles, followed by a large number of immediate prototype demonstration projects. There is less emphasis on generic and theoretically supported research data. Demonstration projects are subsidized through the participating companies to showcase product development. Relevance to U.S. Practice Research abroad differs from U.S. research practice in that most research in the United States is conducted by universities, with limited industry support. More fundamental and applied research seems to be conducted in the United States before large-scale prototype demonstration projects are implemented, and the U.S. Government seems to provide larger portions of funding for research and development. Transferable Technologies Although no specific technologies can be transferred in the research sector, incentives for industry to participate more actively in research and development efforts should be investigated. Japanese companies, for example, derive significant tax advantages when they can show a certain amount of expenditures directed toward research and development of new technologies. Research and Development Needs In many cases, research in the United States seems to be fragmented and isolated and should be better coordinated and focused to derive more and immediate benefits. Large prototype demonstration projects seem to find faster and easier application and implementation abroad. U.S. industry needs to participate much more directly and actively in the research process.
3.9 CONSTRUCTION (TOPIC 9) Summary of Findings One of the key advantages of advanced composite materials is their high strength-to- weight ratio, which typically results in significant structural weight savings. Direct benefits for construction are:
Possible disadvantages include the damage potential during handling and erection. To date, these characteristics are exploited to only a limited degree in the overall cost/ benefit assessment, as compared to conventional structural materials and construction procedures. Applications in which these advantages have been used include: the bridge systems made entirely of advanced composite materials, promoted by Maunsell in the United Kingdom (E2, E3, E4), the CFRP laminate strengthening system developed by Sika and EMPA in Switzerland (E8, E10, E11, E12), and the CFRP sheet strengthening of bridge deck soffit regions in Japan (J2, J8, and J10). Additional training of construction personnel is required in:
All of these areas require specially trained and experienced field labor and professionals, as well as onsite quality control and inspection procedures. Other construction considerations are connected to the use of advanced composite post-tensioning cable systems, which typically require larger and heavier tendon anchorages (E5, E8, J1) than conventional steel tendons. Because of the reduced material modulus, significantly larger stressing distances requiring resetting of jacks and/or larger stressing durations for typical power supplies are needed. To date, the number of commercial projects implemented is very small, allowing a realistic assessment of the construction impact of advanced composite materials. Most projects observed by the scanning team were one-of-a-kind demonstration projects, specifically designed to showcase new technologies and constructed or erected with significant volunteer labor and government or industry subsidies. Only when advanced composite bridge projects are competitively bid and executed can the true impact of these new materials on the construction market be assessed. Relevance to U.S. Practice Because most of the projects observed were not competitively bid, it is difficult to assess any relevance from the construction processes for the U.S. bridge industry. Transferable Technologies Of interest in the United States are the government and industry consortia assembled to implement large-scale demonstration projects to showcase the technology. Research and Development Needs Complete and detailed documentation of all construction-related aspects of advanced composite materials must be provided to use the information in competitive market situations.
3.10 MANAGEMENT (TOPIC 10) Summary of Findings Management implications of projects involving advanced composite materials are difficult to assess, because very few truly commercial projects based on competitive bidding were observed. The nature of project management generally follows the character of the project, namely that of a demonstration project. Management of these demonstration projects, however, shows clear differences from U.S. practice. For example, in most countries, demonstration projects seem easier to award by the sole source arrangement than in the United States. Additionally, in all countries visited, the construction industry participates in projects as a full partner and, in many cases, as the leading partner. Indus-try participates significantly in financing demonstration projects, in addition to government funding, which facilitates these projects to a large degree. Projects that can be viewed as "commercial" were encountered in the United Kingdom with Maunsell's bridge enclosure system at the Second Severn Approach Bridges (E4), in Switzerland with the CFRP laminate strengthening of bridge decks and girders (E11 and E1), and in Japan with the seismic bridge column retrofit using CFRP sheets (J6). Because no alternative products have been tested and approved in the United Kingdom for advanced composite bridge enclosure systems, or in Switzerland for FRP strengthening, it is difficult to judge the potential application of these projects in the United States. This is particularly true, because quoted costs seem to be high from a U.S. bridge construction point of view. In Japan, it was not clear how seismic CFRP sheet retrofit contracts are obtained by the construction companies.
Adjacent bridge columns include a variety of retrofits, such as steel-plate jacketing or reinforced-concrete jacketing, which seems to imply that the 200 bridge column installations were still more demonstration than commercial projects. Finally, one management aspect that was noticeable in all countries was the willing-ness by industry to organize and participate in the training of designers, engineers, and construction professionals. Industry also played a leadership role in developing de-sign guidelines and standards, cooperating very closely with the appropriate government agencies. Relevance to U.S. Practice Of direct relevance to U.S. practice are the close partnerships among industry, government, and the research community to educate the civil engineering profession in the new technologies and implement high-visibility demonstration projects. Another key factor is the direct participation of the civil engineering and construction industries in the projects and product development. Transferable Technologies Flexibility in the contracting of projects involving new materials and technologies, as well as government incentives to industry to participate in new technology development and demonstration projects, should be further addressed in the United States. Research and Development Needs Technology transfer workshops and seminars should be developed. In addition, cost/benefit models for new technologies should be generated and evaluated for all life-cycle cost predictions. Finally, special legislation could be enacted to facilitate implementation of these new technologies.
4.0 ADVANCED COMPOSITES IN BRIDGES IN EUROPE Over the past two decades, advanced composite materials have been used in civil engineering applications in many European countries. Three countries, the United Kingdom, Germany, and Switzerland, were selected by the scanning team as representative of recent developments and applications in the use of advanced composites in bridge engineering. In each country visited, the type of advanced composite materials and systems, as well as the bridge applications, differ depending on specific requirements, national needs, and/or industry participation. In the United Kingdom, the developments observed were driven primarily by industry with the introduction of a new fiberglass construction system and a lightweight aramid cable system. Problems with continued maintenance of steel girder bridges have led to an innovative GFRP enclosure concept, which will significantly reduce the corrosion rate and subsequent maintenance. In Germany, corrosion problems with older post-tensioned concrete structures prompted the Government to initiate a research and development program on nonmetallic ten-dons to eventually replace steel prestressing elements. The resulting new prestressing system, the HLV Polystal,7 was systematically developed, tested, installed in demonstration projects, and monitored. However, significant improvements in the durability and corrosion protection of conventional steel prestressing tendons have made the more costly Polystal7 tendons virtually obsolete. In Switzerland, the rehabilitation and strengthening of existing concrete bridge decks and structural concrete slabs has led to research and development of the CFRP laminate strengthening system. Furthermore, the Swiss tradition in post-tensioning and cable-stay concepts and systems (e.g., VSL, BBR, Suspa) has been extended to the area of advanced composites. Of interest are the development of pultruded parallel wire carbon cable stays and, in particular, the Swiss anchorage technology. Workshops were held to provide overviews of activities in the United Kingdom, Germany, and Switzerland. These took place in Cambridge, England (E1); Düsseldorf, Germany (E5); and Dübendorf, Switzerland (E8). Summaries of the workshop discussions, as well as project summaries for each of the project sites that the team visited, are provided in this section.
4.1 CAMBRIDGE WORKSHOP (PROJECT E1) Workshop Objective The objective of this workshop was to provide an overview of advanced composite research and applications in the United Kingdom. The workshop was organized by Prof. Chris J. Burgoyne at the University of Cambridge. Workshop Contacts and Meeting Participants Dr. Chris J. Burgoyne, Professor, University of Cambridge; Mr. John R. Cunninghame, Bridge Division, Transport Research Lab-oratory (TRL); Mr. Sibdas Chakrabati, Prin-cipal Engineer, Highways Agency (HA); Dr. Martin Pick and Mr. Brian Wilson, Mar-keting Managers, Linear Composites, Ltd. Workshop Description Dr. Burgoyne, shown in Figure 17, presented research developments [1] on aramid cables, reinforced-concrete beams with bonded and unbonded aramid tendons [2], and concrete shear reinforcement with aramid hoops or spirals. The key advantages of using external aramid cables are their strength, very high strength-to-weight ratio, and durability. For these applications, parallel lay (parafil) ropes have been developed. For bonded or partially bonded pretensioning tendons, braided or pultruded aramid-reinforced polymers (ARP) rods are used, which typically feature a reduced modulus with increased failure strain capacities. Research focused on the development of anchorage systems for the dry parallel lay "parafil" ropes using a friction cone concept (Figures 18 and 19) and on the use of aramid reinforcement with concrete beams (Figures 20 and 21). Bonded tendons show high load- carrying capacities at reduced deformation capacities. Unbonded tendons allow large deformations in prestressed concrete beams at reduced load-carrying capacities. A concept of partial unbonding of aramid tendons can increase both deformation and load-carrying capacities. Parafil rope applications were presented by Linear Composites, Ltd. These applications consisted of repair of a vertically cracked cooling tower; cable stays for bridges, antennas, and roof systems; and support of urban train and trolley bus overhead conductors. Related pro-ducts and applications are in the form of webbed flat materials (paraweb) for earth anchors, embankment stabilization, windbreaks, and sun-screens, as well as support slings. The reduced modulus of aramid tendons in comparison to steel ten-dons allows the tendon to maintain prestress load levels when creep and shrinkage in the main member result in member shortening. This property was used advantageously in the transverse pre-stressing of a log-decked bridge in Ontario, Canada, in 1995. The HA in the United Kingdom [3] is working on a program to assess the use of nonmetallic reinforcement and prestressing materials in concrete bridges and is planning a demonstration project of an experimental concrete bridge using nonmetallic materials. In conjunction with the planning studies for this demonstration project, TRL is con-ducting tests to validate safety of design methods and assess durability.
4.2 ABERFELDY FOOTBRIDGE (PROJECT E2) Project Summary World's first cable-stayed footbridge made entirely of advanced composite materials (Figure 22). The bridge is 113 m long with a 63-m mainspan. Superstructure/deck and pylons are made from pultruded E-glass (a type of fiberglass), and polyester sections and cables, from dry parallel aramid fibers in polyethylene sheathing. Project Data Designer: Maunsell Structural Plastics Contractor: O'Rourke Civil Engineering, Ltd.; University of Dundee; GEC Reinforced Plastics; Linear Composites, Ltd. Owner: Aberfeldy Golf Club Designed: 1991 Completed: June 1992 Cost: ,120,000* (US$200,000)
* Plus donated labor
Project Objective Extend Aberfeldy Golf Course from 9 holes to 18 holes on the other side of the River Tay with a footbridge that is maintenance free for at least 20 years. Demonstrate application of Maunsell's ACCS. Alternative Concepts Conventional timber, concrete, or steel cable-stayed bridges or steel truss bridges at more than twice the project cost. Design Considerations Construction access, lightweight (no heavy lifting equipment), durability, no scheduled maintenance for 20 years.
Project Contacts Allan E. Churchman, Managing Director, Maunsell Structural Plastics, Ltd.; George Innis, President, Aberfeldy Golf Club. Project Description The footbridge is 2.2 m wide (7.2 ft) and 113 m long (370 ft), with a mainspan of 63 m (206 ft), between two A-frame pylons (Figure 23). The pylons are 17.2 m tall and support the mainspan with fan-type cable. The main-span is a vertical circular arc linked to the side spans with continuous transition slopes. A-frame pylon dimensions were determined by the width of the bridge by a 30° slope of the uppermost cable stay [4]. All structural components of the bridge (except cable anchorages, cable connector moldings and ties, pylon foundations, and abutments) are made of advanced composite materials. The bridge deck, A-frame pylons, and handrails are made of GFRP (Figures 25 and 26), and the cable stays are made of dry parallel aramid fibers (Kevlar) in polyethyl-ene sheaths. The design concept was based on Maunsell's ACCS and Linear Compos-ites' parafil ropes. The ACCS consists of modular cellular pultruded GFRP sections that can be assembled into larger structural sections by mechanical toggle and adhesive bonding (Figure 24). Construction/Installation The GFRP elements were pultruded by GEC Reinforced Plastics and transported to the site for assembly. Tower legs were assembled at the factory with cable anchorage provisions and were delivered to the site following excavation and foundation work. Legs were assembled into the A-frames and bonded together, and anchorages were added. Towers were winched into a vertical position using temporary ropes, and the mainspan was assembled on land and winched over the crossbeams by hand using temporary ropes. Cable stays were anchored and handrails and approach spans added. Ballast was added to the mainspan deck. Instrumentation, Monitoring, Testing Initial testing of ACCS was performed at the University of Surrey. Two 3-cell box beams (2 m wide, 0.76 m deep, 18 m long) were assembled using the standard ACCS components, then proof-load tested under full design load in four-point bonding for 7 months. Subsequently, one of the beams was load tested to failure. Parallel accelerated weathering tests were carried out on laminates and bonded joints. Construction assembly tests were performed at the University of Dundee, which also monitored the bridge during and after construction. Static load tests with sandbags were performed. Special Issues Few problems were observed. The primary problem was associated with the light weight of the structure. Without added ballast, the bridge is somewhat underdamped in windy conditions and very lively under pedestrian traffic. During construction, the placement or driving of the toggles between long plank sections required special lubricants and toggle-driving equipment. Slight sagging of the bridge after 4 years of service can be attributed to the low cable modulus and creep in the parafil cables.
Project Summary Entirely advanced composite bascule bridge with 8.2-m span for two-lane traffic (Figure 27). Project Data Designer: Designer Composites Technology, Ltd. Owner: Cotswold Canals Trust Completed: 1994 Cost: ,65,000* (US$110,000)
*Plus volunteer labor Project Objective The project objective was to design and build a bascule bridge with minimal weight and long-term durability. Alternative Concepts Steel girder bascule bridge with orthotropic deck or open grating. Design Considerations Light weight, 40-ton-truck loading. Project Contact Allan E. Churchman, Managing Director, Manusell Structural Plastics, Ltd. Project Description The bascule bridge [4] is 8.2 m (27 ft) long and 4.3 m (14 ft) wide for two lanes of regular BS 5400 traffic loads (40-ton trucks). The structural depth is 0.86 m (2.8 ft), and the superstructure comprises a six-cell box girder built with the Maunsell ACCS. The overall bridge cross-section geometry is depicted in Figure 28. The cells of the ACCS pultruded planks are filled with structural epoxy foam that has a density of 100 kg/m3 (6.2 lb/ft3) to provide support to the thin
webs under high wheel loads. The super-structure is stiffened transversely with ACCS diaphragms. The deck consists of a "double ply" of ACCS planks with cells running in perpendicular directions. Wear, impact, and skid resistance are provided by replaceable epoxy-sealed and coated marine plywood with sand grit. The total weight of the superstructure and wear surface is 4.5 tonnes (10 kip) for 35 m2 (375 ft2) of bridge deck area. Construction/Installation The superstructure was built in two halves in the fabrication shop and delivered to the site, where the sections were bonded together. The second layer, or transverse deck planks, was bonded in place. The pultruded hand-rails were fitted to the bridge, and the complete bridge, with yoke, was lifted into place. The replaceable wear surface was added in situ. Site construction took 3 months, using a volunteer labor force. Instrumentation, Monitoring, Testing Static load, long-term creep, and durability tests were performed at the University of Surrey. Design of the bridge was based on Maunsell's limit state design for ACCS, considering deflection limits, maximum strain levels of 25 percent of first-ply failure in the laminates, and buckling limit states based on relevant test results. Special Issues No problems with the construction or service performance have been reported.
4.4 SECOND SEVERN APPROACH ENCLOSURES
(PROJECT E4) Project Summary GFRP bridge bottom soffit enclosure system suspended with hangers from the steel superstructure (Figure 31). Project Data Designer: Maunsell Structural Plastics Contractor: Balfour Beatty Civil Engineering, Ltd. Construction: Started March 1993 Cost: ,282/m2 (US$44/ft2) Project Objective The objective is to provide access to the steel girder superstructure for inspection and maintenance without traffic interruption. The enclosures also significantly reduce corrosion rates (up to 95 percent). Alternative Concepts None. Design Considerations Full access for inspection and maintenance. Also, capable of supporting construction loads during deck construction. Design load 1.9 kN/m2 (40 psf). Deflection limit under design load of L/120; that is, span length divided by 120. Project Contacts Allan E. Churchman, Managing Director, Maunsell Structural Plastics, Ltd.; Peter Head, Managing Director, Maunsell & Partners, Ltd. Project Description The Maunsell GRP bridge enclosure system [4] was conceived in the early 1980's and first applied on the Tees Viaduct in 1987B89. The system consists of pultruded multicell E-glass panels in polyester matrix, connected with special GRP connector elements, which allow attachment of GRP hangers (Figure 32). Separate enclosure sections are connected by neoprene joint seals. Specially molded curved side panels with foam core and triangular GRP facia edge moldings provide the enclosure system with aesthetically and visually pleasing characteristics. The enclosure system (Figures 33 and 34) allows for limited corrosion protection of the steel beams, because the corrosion potential in the enclosed system is reduced to less than 5 percent of the unenclosed level. Enclosures can also be used to support formwork during deck construction. The expected maintenance-free service life is 30 years. Construction/Installation The lightweight enclosure components and the specially designed and developed hanger system can be erected by two or three workers from hydraulic hoists or platforms. After enclosure installation, no further interruption of the roadways below is required. Instrumentation, Monitoring, Testing Load testing was conducted to verify service-load deflection limit states. No other testing or long-term monitoring of the enclosure system is in progress. Fire testing of the system was performed at the Warrington Fire Research Center.
Special Issues Potential problems include drainage, if water penetrates the enclosure, and handling du-ring construction. Costs are high at ,282/m2 (US$44/ft2) per enclosure area, but reported cost studies on the project have shown benefits when traffic management, traffic delays, access equipment, and reduced maintenance costs are taken into account in a life-cycle evaluation.
4.5 DÜSSELDORF WORKSHOP (PROJECT E5) Workshop Description An overview of advanced composite developments and applications in Germany was provided by Prof. Dr. Ing. Ferdinand Rostasy from the Technical University of Braunschweig. Dr. Rostasy has been active in advanced composite research for the past 13 years. In 1985, the German Federal Government provided a research grant to an industry consortium consisting of Bayer AG, a chemical company, and Strabag Bau AG, a contractor, to develop a nonmetallic post-tensioning system. The system, called HLV-Polystal7 [6], consists of pultruded glass fiber bars in online coated polyaramid sheaths with a tensile strength of >1,520 N/mm2 (220 ksi), a modulus of elasticity of 41 kN/mm2 (7.4 H 106 psi), and a strain to failure of 3.3 percent (see Figure 35). In addition to the industry participants, three of the leading German technical universities participated in research and development on HLV-Polystal7 system: the University of Stuttgart (Prof. Rehm) on materials, the University of Darmstadt (Prof. König) on design, and the University of Braunschweig (Prof. Rostasy) on anchorage systems. In addition to the mechanical characteristics mentioned above, other key advantages of HLV-Polystal7 are its low specific weight of 2 g/cm3 (125 pcf) and high durability in typical civil engineering applications. Disadvantages are sensitivity to stress corrosion and manufacturing costs, which are two to three times those of steel strands and ten-dons. Long-term strength was established experimentally at 70 percent of the short- term strength, and tolerable stress ranges were established at >50 N/mm2 (7.3 ksi) at 2 million cycles. Durability tests showed extensive resistance of load-bearing glass fibers to temperature loads and
electromagnetic neutrality. HLV-Polystal7 has been applied in several demonstration bridge projects in Germany (1980, Lünensche Gassel, Düsseldorf; 1986, Uhlenbergstrasse Bridge, Düsseldorf; Marientelde Pedestrian Bridge, Berlin) as regular or external tendons. However, improved durability and reduced costs of conventional prestressing tendons and the high manufacturing costs of Polystal7 have led to discontinuation of its production. Based on the German experience, special applications for Polystal7 can be found in temporary or permanent ground anchors in corrosive soils, for guy wires and cable stays, and for external post-tensioning in corrosive environments. However, limited applications in conventional prestressed concrete are envisioned. Instrumentation, Monitoring, Testing Another key element in the development of HLV-Polystal7 was the concurrent development of embedded health-monitoring systems and sensors. Copper wire and fiber optic sensors were embedded into the glass bar during manufacturing. In addition to the internal tendon health monitoring, extensive fiber optic and chemical sensor applications have been developed [7] and used in Germany to detect concrete cracking, crack width, and corrosion potential. Polystal7 was also used in the repair of a subway station tunnel in Paris, France (Figure 36), where 19 HLV-Polystal7 ties and 38 aramid fiber strands were placed as tension ties between newly strengthened buttress walls. As expected, the aramid ties showed more than double the relaxation of the Polystal7 ties. In November 1991, a followup BRITE/ EURAM Program, No. 4142, "Fiber Composite Elements and Techniques as Non-Metallic Reinforcement of Concrete," was started. Its objectives were to: (1) characterize materials and manufacturing processes suitable for applications in civil engineering structures, (2) determine load-carrying characteristics of concrete members rein-forced or prestressed with FRP, (3) develop reinforcing elements, anchorages and application techniques, and (4) develop criteria for design, detailing, and execution. Partners in this program are the University of Braunschweig, Germany, and the University of Ghent, Belgium, as well as Sicom, AK70, HBG, Suspa, Cousin, DSI, and NDI. Workshop Contact Dr. Ing. Ferdinand Rostasy, Professor, Technical University, Braunschweig.
4.6 ULENBERGSTRASSE BRIDGE (PROJECT E6) Project Summary A Federal demonstration project by the German Ministry of Economy, Medium-sized Enterprises, Technology and Transport of Northrhine-Westphalica, Düsseldorf, to test HLV-Polystal7 tendon bridge construction. Project Data Designer: Strabag Bau AG & König u. Heunisch Contractor: Strabag Bau AG/Bayer AG Owner: City of Düsseldorf Designed: 1985 Construction: 1986 Project Objective Internal post-tensioning and monitoring of a two-span, continuous slab bridge using 59 HLV (60-ton) tendons with nineteen 7.5-mm-diameter Polystal7 rods each. Alternative Concepts Conventional high-strength steel post-tensioning tendons. Design Considerations Conventional (DIN 1072) Bridge Design Guidelines for 60/30-ton loading. Project Contacts Dr. Ing. R. Voigt, Technical Program Manager, Federal Department of Trans-portation; Dr. Ing. F. Rostasy, Professor, Technical University, Braunschweig. Project Description The Ulenbergstrasse two-lane road bridge (plus oversized pedestrian walkways) in Düsseldorf is a 46.9-m-long (154-ft) and 15-m-wide (49-ft) slab and cantilever bridge continuous over two spans (see Figures 37 to 39). The depth of the superstructure is
1.52 m (5 ft), and the bridge is post-tensioned with 59 bonded HLV- Polystal7 parabolic tendons [6] at a working load of 60 tons each. Each tendon was made of 19 HLV-Polystal7 rods that are 7.5 mm in diameter (0.3 in) and stressed to 50 percent of their short-term strength. All 59 tendons were monitored for 8 years with embedded copper wire and fiber optic sensors [7] to validate design assumptions. Monitoring was terminated after all readings stabilized. Construction/Installation Construction of the bridge followed conventional construction procedures for cast-in-place prestressed concrete built on falsework with parabolic draped corrugated sheet metal ducts. Instrumentation, Monitoring, Testing Each tendon of the 19 HLV-Polystal7 rods included 3 rods with embedded copper wire and fiber optic sensors for multiplexed strain monitoring along the tendon profile. The bridge was load tested after completion with static and rolling-truck loading. The actual measured deflection under the test loading was 0.9 mm compared with the predicted expected deflection of 1.2 mm. Special Issues Special anchorage systems needed to be developed by SICOM AG for anchorage of the Polystal7 glass fiber rods. The anchorage consists of a machined profiled steel housing filled with a synthetic resin molded around the fanned-out Polystal7 rods.
Project Summary A 53-m (174-ft), three-span, two-lane road bridge on the premises of Bayer AG to pro-vide access to a future planned parking structure. Project Data Designer: Obermayer Owner: Bayer AG Designed: 1989 Completed: 1991 Project Objective Demonstrate applicability of HLV-Polystal7 post-tensioning system and instrument and monitor the structure under traffic loads. Alternative Concepts Conventional high-strength steel post-tensioning tendons. Design Considerations The specific weight of Polystal7 is 25 percent of steel tendons and the E-modulus is about 25 percent of steel. Allowable working stress level in Polystal7 is 50 percent of ultimate, and it is electromagnetically neutral. Project Contacts Dipl. Ing. H. Jonas, Department Head, Obermayer, Cologne; Dr. Ing. R. Voigt, Techn. Angest., Federal Department of Transportation. Project Description The three-span continuous slab bridge with cantilevers has a total length of 53 m (174 ft) and a width of 9.7 m (32 ft) (see Figures 40 and 41). The depth of the superstructure is
1.12 m (3.7 ft), and it is designed for DIN 1072 live load (60/30-ton trucks). The bridge is post-tensioned with 27 continuous parabolic HLV-Polystal7 tendons [6] comprised of 19 E-glass rods that are 7.5 mm (3 in) wide and have a nominal prestressing working load of 60 tons each. Construction/Installation Construction of Schiessbergstrasse Bridge followed conventional cast-in-place prestressed concrete construction on false-work. Post-tensioning ducts in the form of corrugated sheathing were provided for 27 HLV Type III Polystal7 tendons, as well as 12 Type 5-lb VSL steel tendons, in case an alternative post-tensioning system is needed at a later date. Instrumentation, Monitoring, Testing The Schiessbergstrasse Bridge is fully instrumented for traffic load and durability monitoring, as shown in Figures 43 and 44. Each of the 27 HLV-Polystal7 tendons contains 3 glass rods with embedded optical fiber sensors [7] to monitor tendon strains. Crack-monitoring fiber optic sensors were attached along four lines at the deck and bottom soffit (Figure 42) to detect concrete cracks and monitor crack width. Chemical sensors are placed in the deck and soffit concrete to monitor the corrosion potential. A program is in place to monitor the bridge every year for 5 years and, subsequently, every 5 years. Special Issues The bridge was monitored for the 12-month period from 1 January to 31 December 1994. All readings are computer controlled, transmitted through telephone lines directly to the engineering office, and automatically checked against predicted and allowable performance tolerances.
4.8 EMPA WORKSHOP (PROJECT E8) Workshop Objective The workshop objective was to provide an overview of advanced composite research and applications in civil engineering structures in Switzerland [8]. The workshop was organized by Prof. Urs Meier from the Swiss Federal Laboratories for Materials Testing and Research (EMPA) in Dübendorf, Switzerland. Workshop Contacts and Meeting Participants Prof. Urs Meier, Director, EMPA; Dr. Marie-Anne Erki, Professor and Head, Department of Civil Engineering, Royal Military College at Canada; Werner Steiner, Technical Manager, Sika AG; and the technical staff of EMPA. Workshop Description The EMPA workshop was hosted by Prof. Erki of the Royal Military College of Canada, in the absence of Prof. Meier, who had made all the arrangements and set the agenda. The workshop was also attended by Mr. Steiner from Sika AG, as well as eight members of the EMPA administrative and research staff. The main focus of the workshop was on structural rehabilitation using CFRP laminates [8, 9] post-bonded to existing structural members and systems to increase load-carrying capacities (Figure 45). The CFRP laminates are pultruded strips of 50-mm width (2 in) and 1.2-mm thickness (0.05 in) made from 12k rowings of Torey T700 carbon. For member strengthening, these CFRP laminate strips are bonded to the substrate with a two-component epoxy. To date, members and structures successfully strengthened with CFRP laminates include reinforced and prestressed concrete beams, timber, and steel crossbeams in bridges, as well as reinforced concrete columns and masonry walls for seismic retrofitting. Also, strengthening of aluminum box sections for automotive applications is being developed. Advantages of CFRP strengthening are the light weight and strength of the CFRP laminates, their ease of handling and installation without heavy equipment, and their simple application in overhead installations where the viscosity of the epoxy adhesive is sufficient to support the self-weight of the CFRP strip during curing. Installation can occur in sections that are 15 to 20 m (50 to 65 ft) long, can be performed in tight and congested areas and above suspended utility lines, and can cross other CFRP laminate strips with adjustments in the thickness of the epoxy adhesive layer. Cost of the CFRP strips is SFR55 to SFR80/m (US$14 to $20/ft) for materials or SFR100 to SFR120/m (US$25 to $30/ft), including surface preparation and installation. Research at EMPA concentrated on applications under traffic load (vibrations); applications as prestressed laminates, with end-anchorage details; and structural integrity of the carbon fiber laminates under fire exposure. Overhead applications to bridge soffit slabs were of particular interest, because added reinforcement and shotcrete is sensitive to application under vibrations. Tests on different adhesives under different excitation frequencies are in progress. Fire tests on loaded beams strengthened with steel plates or CFRP laminates showed steel plates debond two to six times faster than uncoated carbon laminates. Fire tests also showed that protective coatings that delay heating of CFRP laminates can significantly extend the duration of structural integrity. EMPA has also developed seismic strengthening methods for shear walls in buildings with diagonally applied CFRP laminate strips. Because of the concentrated force transfer in the carbon strips, anchorage at the ends of the carbon strips in footing and floor slabs should be addressed. In most advanced composite projects at EMPA, preference seems to be given to carbon fiber composites over glass and aramids because of the high susceptibility of glass to stress corrosion and to various chemical environments. For aramids, the high degree of water absorption and the mismatch in coefficient of thermal expansion (negative for aramids) compared to conventional structural materials are deterrents in civil engineering applications. Extensive cyclic loading and fatigue tests on fiberglass/epoxy beams (Figure 46) have demonstrated the outstanding fatigue characteristics of polymer matrix composite (PMC) structural members. Long-term creep tests on GFRP beams are also in progress at EMPA (see Figure 47). Another area of emphasis at EMPA is anchorages for composite cables and tendons. Corrosion problems have been found with carbon tendons and zinc-filled conical steel housings due to the formation of a galvanic cell. On the other hand, epoxy fillers stiffened with aluminum oxide pellets and stiffness gradation along the conical anchorage length proved to be very effective at resisting corrosion. These newly developed carbon tendon anchorage systems have been extensively tested in short-term and fatigue-type environments [10]. Other research and development programs reported during the EMPA workshop addressed filament-wound carbon tubes for poles, pipes, and traffic signals; CFRP-reinforcement grids for nonmetallic concrete reinforcement; and CFRP-reinforced high- strength spun concrete. In most of these applications in new structural systems, the disadvantage of high cost outweighs the advantages derived in terms of durability and light weight. In the rehabilitation and strengthening of existing structures, cost effectiveness can be achieved.
4.9 STORCHENBRÜCKE (Stork Bridge) (PROJECT E9) Project Summary First cable-stayed road bridge with 2 of 24 cable stays executed as CFRP cable stays, crossing a railroad station in Winterthur. Project Data Designer: Höltschi & Schurter Contractor: BBR, Ltd. (Cables) Owner: City of Winterthur Designed: 1994 Completed: November 1996 Cost: ~ 3H cost of steel cable stay Project Objective Demonstrate the use and long-term behavior of carbon fiber composite stay cables in an actual road bridge application. Alternative Concepts Conventional high-strength steel cable stays. Design Considerations Special design considerations were necessary for the anchorage of the carbon fiber composite cables and the temperature loading of the bridge, because of differences in thermal coefficient between the carbon cables and adjacent steel cable stays. Project Contacts Professor Urs Meier, Director, EMPA, Dübendorf; Dipl. Ing. Heinz Meier, Research Engineer, EMPA, Dübendorf. Project Description A symmetric, single A-frame pylon cable- stayed bridge with 12 pairs of cable stays (see Figures 48 to 53). Total length is 124 m (406 ft), and the pylon heights are 38 m (125 ft), as shown in Figure 49. One of the 12 pairs of cable stays has been executed
as carbon cable for demonstration and long-term monitoring. The two carbon cable stays were installed in April 1996, and the bridge was scheduled to open for traffic in November 1996. The key advantages of the carbon cable stays are their light weight, which results in reduced sag under dead load; a more efficient equivalent cable modulus; and the expected durability, with significantly reduced maintenance and replacement requirements. Disadvantages of the carbon cable stays include the lower actual modulus, compared to steel cables, and the higher costs. Each carbon stay cable consists of 241 parallel pultruded CFRP rods of 5 to 6 mm (0.2 in) in diameter, with a 65- to 70-percent fiber volume fraction [10]. Construction/ Installation The CFRP cable stays were prefabricated with anchorages and shipped to the site. Installation of the CFRP cable stays followed the same procedure used for the steel cable stays. The anchorage system consists of a conical steel shell casing that forms a molded epoxy cone around the CFRP rods. The modulus of the epoxy cone anchorage is gradated from soft, at the cable, to stiff, at the anchor terminus, to provide uniform shear force transfer to the transverse pressure-sensitive CFRP rods. The stiffness gradation in the anchorage filler material is achieved by the addition of aluminum oxide pellets with varying thicknesses of epoxy coating [10]. Instrumentation, Monitoring, Testing Bundles of 19 CFRP rods were tested at EMPA in static and fatigue loading. The static load-carrying capacity reached 92 percent of the sum of the single-wire capacity. Fatigue tests showed the superior performance of CFRP under cyclic loading. A 1,200-ton stay cable and anchorage of a 241-rod cable were tested at EMPA to over 8 million cycles at 3.2 times the service load stress levels, without any signs of damage. The installed 1,200-ton cable stays are instrumented with optical fiber Bragg gratings [11] and standard electrical resistance gauges for strain monitoring of the cable and anchorage, as well as temperature sensors, humidity sensors, and displacement transducers during the active monitoring time windows. Measured strains during construction, stressing, and anchoring were as expected and predicted. Special Issues One special issue relative to installation of two carbon cable stays between steel cable stays is the difference in cable stiff-ness and in the coefficient of thermal expansion. Carbon cable has a very small thermal co-efficient and will have a Astiffening@ effect with decreasing temperature, because of the respective elongation and contraction of adjacent steel cable stays.
4.10 CO-OP CITY DEPARTMENT STORE (PROJECT E10) Project Summary Strengthening of reinforced-concrete floor slabs with CFRP laminates to allow floor cutouts for elevator shafts and escalator openings (see Figure 54). Project Data Designer: Deuring & Oehninger AG Contractor: Renesco AG Owner: Co-op City Designed: 1995 Completed: September 1996 Cost: SFR120/m (US$31/ft) Project Objective To increase the factor of safety of floor slabs that have large cutouts by adding perimeter tension and distribution reinforcement to the bottom of the slab in the form of epoxy- bonded CFRP laminates. Alternative Concepts Steel plate bonding; however, problems exist with handling of the heavy steel plates onsite, pressure during epoxy curing, thickness of steel plates and crossing of strips, fire protection, and corrosion issues with steel plates. Design Considerations CFRP laminates are designed based on required strength and to keep the regular reinforcement in the elastic range under service loads to limit crack width. CFRP laminates are only applied in areas where the safety factor for the slab for the preexisting reinforcement is still $1.0. In all other cases, steel laminates are applied (Figure 55). Project Contact Werner Steiner, Techn. Manager, Sika AG.
Project Description The concrete flat slab structure of the Co-op City Shopping Center in Winterthur was erected 28 years ago. The multistory building had three underground floors, four above-ground levels, and an attic. Changes in use and the development of the attic space as a shopping area required the addition of an elevator and escalator extensions to below-ground floor and attic levels. The elevator cutout through five 350-mm (14-in) floor slabs had dimensions of 5 m H 3 m (16 ft H 10 ft), and the escalator openings had dimensions of 32 m H 17 m (105 ft H 56 ft). The strengthening around the openings required 3 km (1.9 mi) of CFRP laminates of 100-mm (4-in) width and 1.2-mm (0.05-in) thickness. CFRP laminate strips were up to 16 m (53 ft) long. In most cases, no suspended utility lines or service conduits needed to be removed for the CFRP installation (see Figure 57). More than 300 CFRP strip crossings were executed without problems (see Figure 56). Construction/Installation The reinforced concrete (RC) slab was sand-blasted to expose the concrete aggregate. The CFRP strips were cleaned, and a two-component epoxy paste was applied to both the RC slab and the CFRP or steel strip. The CFRP strips can be pressed on by hand (and a hand roller) once; the weight of the steel strips requires constant pressure during curing. The light weight and flexibility of the CFRP laminates allowed installations of long strips in very congested areas and over suspended utility lines and conduits. Excess adhesive is removed. Instrumentation, Monitoring, Testing Tensile bond strength was tested by a direct tension test of a 50-mm-diameter (2-in) cored plug through the laminate. Failure should always occur in the substrate, not in the laminate or the epoxy adhesive joint. Also, the dew point is checked before installation by measuring air temperature, substrate temperature, and relative humidity. Special Issues Application of CFRP laminates in pre-stressed form as post-tensioning elements has been successfully tested at EMPA; however, no commercial installations have yet been executed.
4.11 OBERRIET RHEIN BRIDGE (PROJECT E11) Project Summary Complete rehabilitation and live-load- capacity upgrade required by increased traffic loads since bridge construction in 1963. Bottom soffit strengthening with transverse carbon laminates. Project Data Designer: Albert Köppel, Consulting Engineer Contractor: Sika AG Owners: Kanton of St. Gallen and Austria Designed: 1996 Completed: October 11, 1996 Cost: Total rehabilitation SFR2 million (US$1.67 million)
Project Objective Rehabilitate entire bridge. Bring all elements up to current design standards. Increase factor of safety for transverse bending of deck slab to a factor of more than 1.5. Alternative Concepts Complete deck replacement or steel plate bonding to bottom soffit. Entire bridge replacement estimates were SFR4.5 million (US$3.75 million). Design Considerations Deck deterioration was not extensive, and only an 80-mm (3.1- in) concrete overlay was required. This kept the stress levels in the steel girders within the design range. CFRP strips were bonded to the deck soffit to increase the positive moment capacity. Negative moment region capacity was enhanced with additional steel embedded in the overlay concrete. Project Contacts Daniel Pfister, Bridge Engineer, Kanton of St. Gallen; Albert Köppel, Consultant, Bänzinger, Köppel & Partners. Project Description
The Oberreit Bridge connects Switzerland and Austria across the Rhein River (Figure 58). The bridge is a three-span steel girder and concrete deck composite structure with spans of 35-45-35 m (114-148-114 ft). The cross-section and dimensions are shown in Figure 59. A total of 670 m (~2200 ft) of 80-mm-wide (3.1 in) and 1.2-mm-thick (0.05 in) CFRP laminate strips was used to strengthen the positive moment region of the bridge deck in the transverse direction between the two steel main girders. The cost of the CFRP strengthening, including surface preparation and materials, was about SFR100,000 (US$83,000), compared to the deck replacement cost of about four times as much. The cost per unit length of installed carbon laminates was SFR149/m (US$38/ft). Construction/Installation The existing deteriorated concrete on top of the deck was removed with hydrojets, which also removed the 10 mm (0.4 in) of chloride contamination. The 80- to 100-mm (3.1- to 4.0-in) concrete overlay was used to increase the flexural capacity by adding additional reinforcement in the negative moment regions. The CFRP strips on the slab soffit were applied by hand after grinding and cleaning of the surface (Figures 60 and 61). CFRP strips were applied from a scaffold and spaced every 0.75 m (2.5 ft). Instrumentation, Monitoring, Testing Application begins only when the dew point on the concrete surface is not reached. This is determined for surface temperature and humidity measurements. After CFRP application, visual inspection, tapping for voids, and tension bond tests on cured car-bon strips are conducted. Tension bond core tests (Figure 62) must show the failure plane in the concrete substrate, not in the epoxy joint. Electrical resistance and Demec strain (Figure 63) measurements were taken under proof load (wheel load) tests. Continued or permanent monitoring is planned. Special Issues Sika set up a training course in 1993-94 to familiarize engineers with the new CFRP technology. Design seems to be driven largely by strength with some considerations to crack width control.
4.12 FÜRSTENLAND BRIDGE (PROJECT E12) Project Summary The Fürstenland Bridge (Figure 64) was constructed in 1941 and has extensive reinforcement corrosion and corrosion potential due to high chloride contents in the super-structure soffit slab. Partial soffit slab removal and repair required temporary girder strengthening. Project Data Designer: Bänzinger + Köppel + Partners Contractor: Fritz Bruderer AG Owner: Kanton of St. Gallen Designed: 1995 Completed: 1996-97 Cost: Total SFR10 million (US$8.3 million)
Project Objective Strengthen superstructure without visual impact during reconstruction of soffit slab by means of carbon laminates bonded to the lower portion of the multicell box girder webs on the inside of the superstructure. Alternative Concepts Steel plate bonding at the same locations where carbon laminates are applied. Although material costs would have been lower, construction difficulties with handling of the steel plates, welding inside the superstructure box girder, and continued maintenance, i.e., corrosion protection, led to the selection of the CFRP system. Design Considerations Repairs needed to be completed under full traffic conditions. An increase in the factor of safety was required for longitudinal flexural service-load-limit states during partial removal of soffit slab reinforcement and for permanent operation. Project Contacts Nuot Letta, Bridge Engineer, Kanton of St. Gallen; Albert Köppel, Consulting Engineer, Bänzinger + Köppel + Partners; Werner Kast, Consulting Engineer, Bänzinger + Köppel + Partners; Matthias Züst, Contractor, Fritz Bruderer AG.
Project Description The Fürstenland Bridge was constructed in 1941 as a reinforced concrete structure with a total length of 489 m (1,605 ft). The mainspan consists of a 135-m- (443-ft-) long and 60-m- (197-ft-) high open dual spandrel arch structure. Spandrel frames on the arch and approach frames are spaced approximately 22 m (72 ft) apart (Figure 65). The superstructure consists of a three-cell box girder with constant structural depth of 1.9 m (6.2 ft). Fifteen years ago, faulty deck drains were installed which allowed deck runoff water containing deicing salt to flow and accumulate inside the box girders. Measurements with electrical corrosion gauges indicated corrosion of the reinforcement. The decision was made to replace large portions of the soffit slab. With the removal of all or part of the soffit slab, the torsional and transverse load-carrying characteristics of the three-cell box girder superstructure will be significantly reduced, requiring individual girders to carry larger portions of the traffic load. Because the bridge has historical value, only internal strengthening measures were allowed. Individual girders were strengthened with the addition of CFRP laminates (Figure 66) to the bottom section of the girder webs. Construction/Installation As a first stage, the bridge deck was repaired and sealed to eliminate water penetration into the box sections. With electrical corrosion gauges (chloride content measurements), areas of high chloride contamination were identified. Carbon laminates, 80 mm (3.1 in) and 120 mm (4.7 in) wide and 1.2 mm (0.05 in) thick, were bonded to the lower web portions (Figure 67), and the bottom soffit slab was partially removed (Figure 68) and rebuilt (Figure 69). Estimated costs for the CFRP Strengthening are SFR100 to SFR120/m (US$25 to $31/ft) of installed CFRP laminate. Instrumentation, Monitoring, Testing Large-scale laboratory validation testing was conducted at EMPA. One of the beams was tested during the panel's visit and showed CFRP laminate failure to be about 5 percent below the design target load.
4.13 KOBLENZ/WALDSHUT BRIDGE (PROJECT E13) Project Summary This historic railroad wrought iron bridge (shown in Figure 70) is an excellent candidate for upgrading of the load rating by CFRP laminate bonding to the cross-girders. Project Data Owners: Shared by Swiss and German Federal Railway Systems Designed: 1857 Completed: 1859 Project Objective The project objective is to increase capacity for train speed, currently limited to 45 km/h (28 mph), and train weight, to permit double-deck commuter trains between Koblenz, Switzerland, and Waldshut, Germany. Alternative Concepts Steel plate bonding to the cross girders is one alternative, although it would increase the dead load of the structure. Historic preservation of this bridge does not allow additional members or other external strengthening measures. Design Considerations The Koblenz/Waldshut railway bridge is the oldest wrought iron bridge in continental Europe. Fracture analyses conducted by Prof. Brühwiler at the Federal Institute of Technology (ETH) in Lausanne determined crack growth rates and service life predictions. CFRP strengthening would possibly increase capacity and service life. Project Description The Koblenz/Waldshut wrought iron bridge was completely rehabilitated in 1992 (Figure 71) at a cost of SFR900,000 (US$750,000). The rehabilitation work included new corrosion protection, painting of all steel members, and replacement of steel roller bearings. Some corroded rivets were replaced with high-strength bolts, however, the bridge was not strengthened at the time. A desire for double-deck commuter train traffic and higher speeds led to investigation of strengthening measures. The strengthening of the cross-girders with CFRP laminates would be similar to a project for a railroad bridge at Ossingen (upriver from the bridge), which was scheduled for strengthening in late 1996 and early 1997.
4.14 ADVANCED COMPOSITES MANUFACTURING
(PROJECT E14) Project Summary An overview of advanced composite manufacturing was provided by Stesalit AG, a Swiss manufacturer of advanced composite systems and components in Zullwil, near Basel. Project Objective Demonstrate materials and manufacturing processes used to fabricate advanced composite materials for civil engineering applications. Project Contact Mark A. Erath, Managing Director and CEO, Stesalit AG. Project Description Stesalit's principal line of business is the manufacturing of aerospace components and materials and laminates for printed circuit boards. The discussions focused on fiber, resin, and curing technologies for advanced composite materials. Processes observed at Stesalit were the manufacturing of CFRP laminate strips by means of pultrusion (Figures 72 to 75) and the manufacturing of prismatic shapes by means of filament winding. The pultruded CFRP strips are made from 24k carbon tows and an epoxy resin. They are manufactured in thicknesses of 1.0 to 2.5 mm (0.04 to 0.1 in) and widths of 50 to 150 mm (2 to 6 in). The filament winding process uses the same base materials and allows for the inclusion of brackets, attachments, and fittings of different materials during the process. The material systems used and the observed manufacturing technology were identical to comparable materials and manufacturing methods used in the United States. After the plant visit, Mr. Erath made a presentation covering the plant's history and product development. The presentation included in-depth information on the adhe-sives developed and used by the plant in the manufacturing of various products. The presentation also offered an excellent overview of adhesive properties, applica-tions, and limitations. Both the presentation and subsequent discussion provided addi-tional assurance that, when used properly, adhesives developed for an application will serve the intended function.
4.15 HALTINGEN BRIDGES (PROJECT E15) Project Summary Complete rehabilitation and strengthening of three reinforced concrete bridges, required by high levels of chloride contamination in the bottom soffit. Project Data Designer: Eglin Ristic AG Owner: Kanton City of Basel
Original Rehabilitated Designed: 1935 1977 Completed: 1936-38 1981 Project Objective Remove carbonated concrete and corroded rebar and strengthen for increased transverse load-carrying capacity with steel plate bonding (Figures 76 and 77).
Alternative Concepts Complete replacement at an estimated cost of SFR15 million (US$12.5 million). Design Considerations Structures needed to be open for traffic at all times. Epoxy bond joints needed to be pro-tected against direct exhaust/temperature from steam locomotives in one bridge, and steamships in another (see Figure 78). Project Contact: Mr. V. Ristic, Partner, Eglin Ristic AG, Basel. Project Description Three reinforced-concrete bridges on the main access road to the German border needed to be repaired and strengthened.
In the original design, the predominantly longitudinal slab reinforcement led to the formation of longitudinal cracks. These cracks limited the tributary slab/reinforcement width and resulted in transverse cracks under wheel loads in the longitudinal slab strips. These extensive crack patterns allowed water penetration, which led to extensive concrete carbonation and reinforcement corrosion. One of the bridges was rehabilitated by complete soffit replacement with rebar and shotcrete. The other two bridges were strengthened with transverse steel plate bonding to the bridge soffit to provide the missing transverse reinforcement. Construction/Installation After complete deck replacement and water-proofing, the two bridge soffits that were to be strengthened with steel plate bonding were sandblasted and checked for concrete tensile strengths, and the cracks were repaired with epoxy injection. Steel mounting rods were drilled and set into the bridge soffit. Steel plates that were 10 m (33 ft) long, 200 mm (8 in) wide, and 6 mm (0.24 in) thick were cleaned, epoxy buttered, and pressed against the bridge soffit with lifting beams and mounting rods. Steel plate strips can be spliced or extended with epoxy-bonded steel plate overlays on top of a butt splice. Care must be taken that all steel surfaces are free of dust and grease before epoxy application. Instrumentation, Monitoring, Testing Some initial monitoring and load testing were performed in the early 1980's. Visual inspection shows that the bridges are in excellent condition 15 years after the rehabilitation measures. Special Issues Although the strengthening was performed with steel plates and not with advanced composites, there are strong indications that this kind of strengthening would now be executed with CFRP laminates bonded to the bottom soffit of the bridge slabs.
4.16 GIEZENEN BRIDGE (PROJECT E16) Project Summary First bridge in Switzerland strengthened with external steel plate bonding. Project Data Rehab. Contractor: Stahlton AG Designed: Before 1912 Completed: 1912 Rehabilitated: 1980 Project Objective Increase load-carrying capacity and correct original design deficiencies that neglected temperature stresses. Alternative Concepts External post-tensioning or complete replacement. Design Considerations The bridge carries a low volume of traffic, but heavy loads on lumber trucks from the Stoosg Forest. Because the traffic volume is low, expenditures needed to be kept low. Project Contact Prof. Urs Meier, Director, EMPA. Project Description The Giezenen bridge is a reinforced- concrete dual-tied arch bridge with vertical concrete hangers and an orthotropic beam and slab deck system. The bridge was built between 1911 and 1912 and spans 31 m (102 ft) over the Muota River connecting the village of Ried-Muotathal with the Stoosg Forest (Figures 79 to 82). The original bridge was designed for horse-drawn carriages and without consideration of temperature variations (which are between -20°C and +30°C, even in daytime). The external steel plates on the longitudinal beams and cross-beams were designed under the assumption that the original reinforcement had completely corroded. The bridge was strengthened in 1980 with steel plate bonding; how-ever, with current CFRP laminate bonding technology, strengthening of the Giezenen Bridge would most likely be executed with carbon laminates to avoid clearly visible corrosion problems with steel plates.
Construction/Installation Steel plates were bonded to the bottom of all transverse and longitudinal deck beams (see Figure 83). The longitudinal edge tie beams were strengthened continuously with plates spliced with epoxy-bonded plate overlays in the butt splice region (see Figure 84). After 16 years, corrosion damage and calcium stalactites are clearly visible. Special Issues Problems include durability and maintenance of bonded steel plates, in addition to more difficult handling and installation compared to CFRP laminate strengthening.
4.17 IBACH BRIDGE (PROJECT E17) Project Summary Repair/strengthening of a prestressed concrete box girder bridge with CFRP laminates. Project Data Designer: Prof. Urs Meier Contractor: EMPA Owner: Kanton of Luzern Completed: 1969 Rehabilitated: 1991 Project Objective Restore original load-carrying capacity after one of the grouted post-tensioning tendons was inadvertently damaged during traffic signal installations (see Figures 85 and 86). Alternative Concepts Steel plate bonding or external post-tensioning on the side of the box girder superstructure. Design Considerations Restore load path continuity for live load in region of damaged tendon through carbon laminates. Project Contacts Prof. Urs Meier, Director, EMPA; Dipl. Ing. Heinz Meier, Research Engineer, EMPA; Dipl. Ing. Giovanni Terrasi, Research Engineer, EMPA.
Project Description The Ibach Bridge is a multispan continuous post-tensioned multicell box girder constructed in 1969. The bridge has a total length of 228 m (748 ft). During traffic signal installations in 1991, coring of the exterior box girder web damaged one of the post-tensioning tendons. The damaged span, crossing the Swiss National Highway N2, had a length of 39 m (128 ft). Special permit loads on the bridge were restricted pending completion of the repair work. Repair work had to be conducted at night to limit traffic impact. To provide a new force transfer path for live load around the damaged tendon area, three 5-m-long (16.4 ft) and 150-mm- wide (6 in) strips of CFRP laminates, 1.75 mm thick (0.07 in), were epoxy bonded to the bridge soffit slab (Figure 87). Construction/Installation Installation of the three CFRP laminates occurred at night from lift trucks, without additional lifting equipment. The total weight of CFRP laminates installed was 6.2 kg (13.7 lb). A total of 175 kg (385 lb) of steel laminates would have been required for steel plate bonding repair. Instrumentation, Monitoring, Testing The carbon laminates and the adjacent concrete were instrumented with strain gates and Demec points, and load tests with test trucks were performed following the repair work.
Project Summary Strengthening of historic wooden arch bridge designed by Joseph Ritter and built in 1807. Project Data Original Rehabilitation Designer: Joseph Ritter EMPA Contractor: n/a EMPA Designed: Before 1807 1991 Completed: 1807 1992 Project Objective Increase service-load capacities to allow 20-ton truck traffic. Demonstration of transverse beam strengthening with CFRP laminates. Alternative Concepts Replacement, transverse post-tensioning. Project Contacts Prof. Urs Meier, Director, EMPA; Dipl. Ing. Giovanni Terrasi, Research Engineer, EMPA; Dipl. Ing. Heinz Meier, Research Engineer, EMPA. Project Description The covered wooden arch bridge near Sins was built in 1807 and designed by Joseph Ritter of Lucern. The eastern side of the bridge was blown up during the 1852 Civil War and rebuilt with a modified super-structure (see Figures 88 to 90). The bridge was designed for horse-drawn carriages and needed strengthening to accommodate 20-ton truck loading. A new wooden deck consisting of 200-mm-thick (8 in) pre-stressed wooden planks was added in 1992, and two of the transverse crossbeams were
strengthened with CFRP laminates to monitor their performance under traffic loads (see Figures 91 and 92). Each of these crossbeams was constructed from two solid oak beams placed directly or with spaces on top of each other. One of the crossbeams was strengthened with CFRP laminates that were 1 mm thick (0.04 in), 250 mm wide (10 in), and 5 m long (16 ft) and consisted of high-modulus fibers. The second was constructed of high-strength fibers that were 1 mm thick (0.04 in), 300 mm wide (11.8 in), and 5 m long (16 ft). Construction/Installation The wooden oak beams were planed with a portable planer, the surfaces were cleaned, and epoxy was applied to both the beam and the CFRP laminate. The CFRP laminates were installed manually from construction scaffolding. Instrumentation, Monitoring, Testing Selected crossbeams, as well as the CFRP- overlaid crossbeams, were instrumented for load test with electrical resistance gauges and Demec gauge joints. Pulse infrared thermography was also used to check the quality of the adhesive line under the CFRP sheet.
5.0 ADVANCED COMPOSITES IN BRIDGES IN JAPAN Applications of advanced composite materials in the bridge industry in Japan focus on two areas: nonmetallic reinforcement and prestressing tendon systems and structural rehabilitation with carbon fiber sheet overlays. Both are driven by specific national needs, which are to:
Nonmetallic reinforcement and prestressing systems for structural concrete use all three basic advanced composite fiber types-- glass, aramids, and carbon. Close to 100 demonstration projects [15] using this newly developed nonmetallic reinforcement approach have been completed in Japan. A workshop organized by the Advanced Composite Cable (ACC) Club of Japan was held in Tsukuba City (J1) to provide a general overview on research, product development, design criteria, and demonstration projects. The carbon fiber sheet rehabilitation systems for both concrete deck strengthening and bridge column seismic retrofitting were introduced in the Osaka Workshop (J2) and applied in numerous projects observed during the study tour (J6, J8, and J10). This section summarizes the 11 projects and workshops visited in Japan.
5.1 TSUKUBA CITY WORKSHOP (PROJECT J1) Workshop Objective The workshop was organized by PWRI and the ACC Club. Discussion focused on the development and use of nonmetallic reinforcement and prestressing systems for concrete structures in Japan. Workshop Contacts and Meeting Participants Mr. K. Nishikawa, Head, Bridge Division, PWRI; Mr. M. Kanda, Chief Research Engineer, Bridge Division, PWRI; Mr. S. I. Kumagai, Deputy General Manager, Sumi-tomo Construction Co., Ltd.; Dr. H. Kimura, Chief, Research Laboratory, Tokyo Rope Mfg., Ltd.; Mr. S. Kenzo, Senior Research Engineer, Shimizu Corporation; ACC Club members and technical advisers, Tatsuhiko Iwasaki, Secretary, ACC Club, General Manager, A-M Engineering Co., Ltd.; T. Hoshijima, Mitsubishi; Dr. H. Maikuma, Nippon Steel Corp.; M. Kamigoshi, Teijin, Ltd.; and PWRI engineering staff. Workshop Description The workshop was held at the Mitsubishi Research and Conference Facilities in Tsukuba-shi and was organized by the Bridge Division of PWRI and the Japan ACC Club. ACC is a group of construction companies, material suppliers, and research and design engineering firms organized to promote nonmetallic reinforcement and prestressing systems for concrete structures. Following a basic introduction to advanced composites, Mr. Kanda of PWRI summarized two documents, "Design and Construction Guidelines for Prestressed Concrete Highway Bridges Using FRP Tendons" (draft March 1994) [12] and "Study Reports and Papers on Prestressed Concrete Highway Bridges Using FRP Tendons" (September 1994) [13, 14], to demonstrate the state of nonmetallic reinforcement for concrete structures in Japan. Worldwide development of GFRP began in the 1950's. Research and development on AFRP and CFRP started in the 1970's; the first applications in Japan took place in the late 1980's. Japanese FRP developments and applications can be identified by the fiber system in three groups:
Basic manufacturing procedures are pultrusion, braiding, or stranding. About 100 civil engineering projects using nonmetallic tendons and reinforcement have been completed in Japan [15]. They range from bridges (24.4 percent) (Figures 93 and 94) to ground anchors (23.2 percent) and from architectural engineering or building applications (11 percent) to marine structures (8.5 percent). Industrial facilities, dams, underground tanks, or drainage systems account for the remainder (32.9 percent).
Mr. Kumagai of Sumitomo Construction provided an overview of the formation of the ACC Club in 1991 and described the membership makeup and club objectives. Dr. Kimura of Tokyo Rope Mfg., Ltd., discussed the various applications of FRP materials. The actual amounts of materials used (see Figure 95) deviate significantly following the economic recession in Japan in 1993, at which point industry subsidies for the use of advanced composite materials were significantly reduced. Finally, Mr. Sekijima of Shimizu Corporation offered an excellent overview of the various projects in which FRPs have been used in civil engineering applications. The ACC Club primarily promotes the use of advanced composite reinforcement and prestressing systems for use in new structures and construction, not in repair and rehabilitation. Most of the materials testing and validation is performed by the composite material manufacturers. These manufacturers in turn provide "guarantees" for minimum performance levels for their products, which are used as nominal design values by the design engineers. The high cost of advanced composite reinforcement and prestressing systems was acknowledged. No efforts to establish cost models that include life-cycle cost estimates and maintenance data have been undertaken, but such models are being investigated. Significant advances for the use and application of FRP reinforcing and prestressing materials and systems were made in Japan with the issuing of draft design and construction guidelines in 1994.
5.2 OSAKA WORKSHOP (PROJECT J2) Workshop Summary The Osaka workshop provided an overview of carbon sheet strengthening developments and applications in Japan. Workshop Objective Carbon fiber sheet for seismic retrofitting and structural rehabilitation/strengthening is manufactured at three companies in Japan: Mitsubishi Chemical (Replark7), Tonen Corporation (Towsheet7), and Toray Corporation (Torayca Cloth7). To date, two main areas of bridge-related applications exist: seismic column retro-fitting and superstructure deck strengthening (see Figures 96 and 97). In seismic retrofitting, over 200 bridge columns have been completed with carbon sheet overlays, and another 800 have been designed and implemented. The seismic column retrofitting is primarily aimed at flexural column strengthening and shear strengthening, rather than plastic hinge confinement (see Figures 98 and 99). Carbon sheets are preferred over glass or aramids, because of the chemical inertness of the carbon fiber and the expected excellent durability characteristics. In addition, carbon absorbs UV rays and, therefore, protects the resin system from degra-dation. Furthermore, carbon exhibits good strength-retention characteristics at high temperatures.
Strengthening of bridge decks is required as a result of an increase in legal truck weights from 20 to 25 tons. In Japanese bridge design, concrete decks typically span transversely between longitudinal girders. To increase the load- carrying capacity of the deck between girders, carbon fiber sheets are applied in primarily transverse strips to the bottom of the deck (Figure 97). In addition to flexural strengthening, repair of cracked decks and punching shear deficiencies are addressed using carbon sheets bonded to the bottom of the deck (Figure 100). Another application is the lining of tunnel sections for local flexural problems (Figure 101). Carbon sheet overlays are tested by coring and direct tension tests on the strengthened core plug. Tests are successful when the tensile failure occurs in the concrete substrate, not in the carbon overlay. In Japan, an association for carbon sheet rehabilitation has been formed--the Carbon Fiber Rehabilitation and Reinforcement Research Association (CFRRA). Draft design guidelines for seismic column retro-fitting and bridge deck strengthening exist but are not yet available in English. Workshop Contacts Mr. M. Uemara, Secretary, CFRRA and General Manager, Tonen Corp.; Mr. T. Hoshikima, General Manager, Mitsubishi Chemical Corp.; Dr. M. Koga, General Manager, Obayashi Construction Corp.
5.3 PWRI COMPOSITE CABLE-STAYED BRIDGE
(PROJECT J3) Project Summary Experimental cable-stayed pedestrian demonstration bridge made entirely of advanced composite materials. Shown in Figures 102 and 103. Project Objective Demonstrate feasibility of construction and assembly of a bridge system made entirely of advanced composite materials and monitor durability of materials and components under normal environmental exposure. Design Considerations Use of nonmetallic connectors made entirely of advanced composites. Keep member/ component weights less than 150 kg (330 lb) to allow manual assembly without lifting equipment. Design live load is 350 kg/m2 (72 psf). Project Contacts Mr. K. Nishikawa, Head, Bridge Division, PWRI; Mr. M. Kanda, Chief Research Engineer, Bridge Division, PWRI; Mr. K. Uchido, Research Engineer, Bridge Division, PWRI. Project Description The PWRI advanced composite experimental pedestrian bridge project features a three- span cable-stayed bridge with an 11.0-m (36-ft) mainspan and 4.5-m (15-ft) side spans. The width of the walkway is 2.0 m (6.5 ft). The total weight of the bridge is only 4.4 tons or 110 kg/m2 (22 psf), resulting in a dead load/ live load ratio of 0.3. The bridge is built on conventional RC foundations and anchored with steel anchor bolts (Figure 104).
Pylons and deck are manufactured as pultruded GFRP sections strengthened in some areas with carbon sheets. The longitudinal girders are supported by transverse beams, which, in turn, are supported by CFRP cable stays. Both Leadline and Tokyo Rope carbon cables of different sizes are used as stay cables. Construction/Installation All components have limited weight, less than 150 kg (330 lb), and are bolted together with 16-mm-diameter (e-in) FRP bolts for manual assembly and disassembly without the use of lifting equipment. Instrumentation, Monitoring, Testing The experimental all-advanced- composite pedestrian bridge was load tested upon completion. Similar load tests are planned for the future to determine the effects of environmental exposure and aging. Environmental exposure/ durability and creep tests are conducted onsite in a special creep test stand (see Figure 105).
5.4 SUMITOMO BRIDGES (PROJECT J4) Project Summary Pre- and post-tensioned demonstration bridges with AFRP reinforcement. Project Data Contractor: Sumitomo Construction Owner: Sumitomo Construction and Teijin, Ltd. Completed: 1990-91 Project Objective Demonstration of AFRP as mild reinforcement, pre-tensioned tendon reinforcement, and post-tensioned tendon reinforcement in two parallel concrete bridge structures. Design Considerations Bridge design to standard two-lane traffic load (one lane per bridge). Project Contacts Mr. S.I. Kumagai, Deputy General Manager, Sumitomo Construction Co., Ltd.; Mr. M. Kamiyoshi, Project Manager, Teijin, Ltd. Project Description The Sumitomo demonstration bridges (Figures 106 to 110) are at Oyama Works, Sumiken Concrete Industry Co., Ltd. The projects consist of two parallel bridge structures, each designed for TL-20 (20-ton) truck loads with a roadway/lane width of 4 m (13 ft). The shorter bridge consists of three pretensioned box girders that are 12.5 m (41 ft) long. These are reinforced with 8-mm- (0.3-in-) diameter stirrups and longitudinal distribution bars made of Technora7 deformed aramid/epoxy rods. They are pretensioned with 16 tendons consisting of three 6-mm- (0.24-in-) diameter strands. The three precast, preten-sioned box girders were overlaid with a cast-in-place RC slab. The second bridge is 25 m long (82 ft) and consists of a single-cell,
cast-in-place box girder with a depth of 1.9 m (6.2 ft). This is post-tensioned internally with 10 Technora7 tendons consisting of nineteen 6-mm-diameter (0.24-in) strands. External post-tensioning consists of six Technora7 tendons with seven 6-mm-diameter (0.24-in) strands (Figure 106). Stirrups and deck reinforcement consist of 8-mm (0.32-in) AFRP bars. The initial stressing or jacking force for the tendons was 75 percent fpu for a design prestress of 70 percent fpu, assuming a 7 percent prestress loss due to creep and relaxation. Internal post-tensioning tendons were anchored in epoxy-filled steel housings, whereas GFRP anchorages were used for external tendons (see Figure 107). Construction/Installation Conventional pre- and post-tensioning procedures were used. Pretensioning was achieved by group stressing against steel bulkheads. Because of the low modulus of the AFRP tendons, increased tendon elongation and stressing lengths required frequent resetting of the post-tensioning jacks. Tendon elongations were monitored during the stressing operations and were consistent, within 1.5 percent, with theoretical elongation values. Instrumentation, Monitoring, Testing A load cell was placed at the anchorage of one of the external tendons to monitor ten-don relaxation with time. Strain gauges were installed on the pretensioned girders to monitor concrete strain variations with time. The measured tendon force and concrete strains are consistent with theoretically predicted prestress losses. The bridge structures were load tested after completion and performed as predicted. The assumed 30-year relaxation rate at a load range of 0.5 to 0.6 fpu is expected to be around 14 percent.
5.5 ARAMID ROD ANCHOR BLOCK REINFORCEMENT (PROJECT J5) Project Summary Rehabilitation and strengthening of existing concrete bridge girders with external tendons at the Sone Viaduct, Hyogo Prefecture. Anchorage blocks for external tendons are post-tensioned to the existing girders with Technora7 multistrand tendons. Project Data Designers: Sumitomo Construction, Ltd., and Teijin, Ltd. Contractors: Sumitomo Construction, Ltd., and Teijin, Ltd. Owner: Japan Highways Public Corp. Completed: 1995 Project Objective Overcome loss of prestressing force in short post-tensioning tendons caused by anchor set and relaxation by means of low-modulus tendon materials (Technora7 aramid tendons). Alternative Concepts Other low-modulus post-tensioning systems. Design Considerations The basic design consideration for the use of Technora7 aramid tendons was the low elastic modulus, which is about 1/4 to 1/5 that of comparable steel tendons. Project Contacts Japan Highways Public Corp.; Mr. S.I. Kumagai, General Manager, Sumitomo Construction, Ltd.
Project Description Fifty-six anchor blocks for external post-tensioning have been stressed to existing concrete girders with Technora7 9-strand aramid tendons, made from 7.4-mm-dia-meter (0.3-in) deformed (spirally wound) aramid rods. The rehabilitation and strengthening was performed for the Japan High-ways Public Corporation (JHC). Each ten-don has a nominal design load of 850 kN (191 kip), and six tendons were used to anchor each anchorage bracket (Figure 111). The adjustable tendon end anchorages con-sist of epoxy-mortar-filled steel housings (Figure 112). Construction/Installation The existing concrete girders were cored at the anchor block tendon locations. Six 9-strand Technora7 tendons were placed over the entire bridge width through multiple girders and anchor blocks and pretensioned against bulkheads at both sides of the bridge. Anchor blocks were cast around the pretensioned tendons. After curing of the concrete, the tendons were cut between girders, and longitudinal external post-tensioning with conventional steel tendons began. Instrumentation, Monitoring, Testing No testing or monitoring of the anchor block tendon force was planned for this project. Special Issues The prestress force development perpendicular to the anchor blocks in a pretensioned system is questionable, because of the short block dimensions and bond transfer length in this direction.
5.6 SEISMIC COLUMN RETROFITTING (PROJECT J6) Project Summary Japanese developments in seismic column retrofitting with FRP sheets. Carbon fiber jacketing of columns on the Hanshin Expressway extension in Himeji. Project Data Designer: Toray and JHC Contractor: Sho-Bond Owner: JHC Completed: November 1996 Project Objective Enhance strength and ductility of existing reinforced-concrete columns for seismic loads with fiber-reinforced plastic sheet overlays by manual wet layup and ambient temperature curing. Alternative Concepts Automated winding of tows, steel or concrete jacketing. Design Considerations Design of retrofit measures follows manufacturers' design recommendations. Composite jackets are designed to carry longitudinal column forces because of column bar cutoffs over the column height. Project Contacts Mr. A. Sumida, Manager, DuPont Toray Kevlar, Ltd.; Mr. M. Uemura, General Manager, Tonen Corp. Project Description The Kobe earthquake of January 1995 prompted accelerated research and development of advanced composite retrofit systems for existing concrete columns. Examples of this research and development were seen and discussed at Sumitomo Construction Co., Ltd. (Figures 113 and 114). In addition to the enhancement of deformation capacities in the columns under seismic loads, in Japan many columns require longitudinal strengthening because of longitudinal bar dropoffs or cutoffs over the column height (Figures 115 to 117), based on linear elastic design assumptions.
On the Hanshin Expressway, 19 rectangular columns that are 2 m H 3 m (6.5 ft H 9.8 ft) in plan and 6 m (19.7 ft) tall were retrofitted by Sho-Bond Corporation using Torayca Cloth7 carbon sheets by Toray. Construction/Installation Standard manual wet layup techniques were employed. The column was enclosed with plastic barrier sheeting around scaffolding to keep the work area dust free and provide a screen for the public. No special environmental mitigation measures were used during the epoxy application and curing. Instrumentation, Monitoring, Testing No monitoring or testing is planned for the seismic column retrofit applications. Special Issues The Japanese bridge engineering and construction community is under severe pressure to implement retrofit measures as quickly as possible. Despite the fast pace, there are design concerns with retrofit measures of different stiffnesses for adjacent column bents. The effectiveness of rectangular FRP jackets on large rectangular columns to improve inelastic deformation capacities also needs to be addressed. Both of these issues are currently being investigated at PWRI.
5.7 AKASHI-KAIKYO BRIDGE (PROJECT J7) Project Summary Construction of the world's longest suspension bridge across the Akashi Straits from Honshu to Shikoku. Pilot rope for main cables was made of aramids. Project Data Owner: Honshu-Shikoku Bridge Authority Designed: 1985 Completed: Scheduled for 1998 Project Objective The project objective was to place a light pilot rope by helicopter over the bridge mainspan between the towers to pull the larger and heavier construction cables. Alternative Concepts Placement of pilot rope with ferry or tug boat, which would interrupt ship traffic.
Design Considerations Reduce pilot rope weight to allow placement by helicopter. Project Contact Mr. U. Nishikawa, Head, Bridge Division, PWRI. Project Description The Akashi-Kaikyo Bridge is the world's longest span bridge currently under construction (Figures 118 and 119). The main-span of the suspension bridge is 1,992 m (6,531 ft) long, and the towers are 283 m high (928 ft). Its superstructure consists of a double-deck stiffening steel truss with six lanes of highway traffic to be carried on an orthotropic steel deck on the upper level. The lower level carries utilities from Kobe to Awaji Island. Construction/Installation The aramid pilot rope is 3.6 times lighter than a comparable steel pilot rope of equivalent strength. Because of its light weight, the pilot rope for the Akashi-Kaikyo Bridge could be placed by helicopter with a suspended cable drum. A comparison with steel pilot rope is shown in Table 6. Instrumentation, Monitoring, Testing The pilot rope was capacity tested before use. Table 6. Akashi-Kaikyo Bridge Pilot Rope Comparison
5.8 BRIDGE DECK STRENGTHENING (PROJECT J8) Project Summary Strengthening of bridge deck on the Hanshin Expressway for increased traffic loads. Project Data Contractor: Mitsubishi/Tonen/Toray Owner: Hanshin Expressway Public Corporation Completed: 1996
Project Objective Demonstrate the application and effective-ness of different carbon sheet strengthening methods [16, 17, 18]. Strengthen deck-load- carrying capacity from 20- to 25-ton trucks. Alternative Concepts Steel plate bonding, shotcrete, and added reinforcement. Design Considerations Rehabilitation/strengthening must occur under rolling traffic loads. Bridge deck needs to be sealed to prevent water penetration from the roadway. Project Contact Mr. M. Uemura, Secretary, CFRRA, and General Manager, Tonen. Project Description On a section of the Hanshin Expressway in Kobe, three different carbon sheet types were installed with different layup sequences and orientations. The systems applied were Replark7 from Mitsubishi, Towsheet7 from Tonen, and Torayca Cloth7 from Toray. All systems were applied in an overhead wet layup using rolled-on epoxy adhesive. Costs per layer of installation were about -15000/m2 (US$15/ft2). Wheel load tests, strain, and deflection measurements are used to evaluate effectiveness. Construction/Installation All construction and installation followed standard overhead wet layup procedures (Figure 120). The carbon sheets were delivered onsite with a paper backing and pressed into a rolled-on epoxy adhesive. The applied systems were cured at ambient temperatures. Instrumentation, Monitoring, Testing
Wheel load tests with a 25-ton truck were performed before and after the carbon sheet strengthening. Strain levels in the carbon sheet of 150 to 160 με were measured after the strengthening.
Deflections reduced by 30 to 40 percent, almost independent of the amount of carbon fiber, which indicates that even small amounts of composite reinforcement are sufficient to keep the deck cracks closed. Draft design guidelines will be reevaluated after a 3-year test and demonstration period.
5.9 ROLLING TRAFFIC LOAD SIMULATOR (PROJECT J9) Project Summary Prototype development of rolling traffic test simulator for wheel loads on bridge decks. Project Objective Determine influence of rolling traffic loads on installation and durability of carbon overlays. Determine fatigue characteristics of carbon sheet strengthening methods under realistic loading conditions. Alternative Concepts Simulate rolling traffic loads with a series of online, servo-controlled hydraulic actuators. Design Considerations Duplication of crack patterns encountered in bridge decks for laboratory simulations of loading. Increase of legal truck weight from 20 to 25 tons. Project Contact Dr. Engr. S. Matsui, Professor of Civil Engineering, Osaka University. Project Description As part of an ongoing research project on bridge deck deterioration and strengthening, Prof. Matsui developed a machine that simulates running wheel loads (Figure 121). Its development was prompted by the observed crack patterns in bridge decks in the field (Figure 122), which start with cracks in the transverse or load-carrying direction of the deck. These cracks limit the tributary width of the transverse deck, resulting also in longitudinal cracks. Eventually, complete orthotropic crack patterns developed with a propensity for local punching shear failures. Laboratory tests with stationary point loads typically result in radial crack patterns, as outlined in Figure 123a. These are significantly different in the resulting failure modes and failure load than those observed in the actual slab shown in Figure 123b. To achieve representative and realistic crack patterns, under laboratory conditions, Prof. Matsui developed the running wheel load machine (see Figure 124). This machine can duplicate observed field crack patterns under laboratory conditions and simulate rolling traffic loads for strengthening application without traffic interruptions and for fatigue load testing with realistic load simulations (Figures 125 and 126). Based on the prototype machine, two test systems have been built at PWRI. Limitations of the test system are: a constant, though adjustable, applied load during a single test; a constant speed; and the need for a special rail or raceway track to convert the concentrated line load of a steel wheel to an appropriate tire patch load.
5.10 HIYOSHIGURA VIADUCT (PROJECT J10) Project Summary Bridge deck strengthening with Tonen Tow-sheet7 and Sho-bond CFRP bonding method. Project Data Designer: Tonen Corporation Contractor: Tonen Corporation Owner: JHC Designed: 1993 Completed: 1993 Project Objective Demonstration project for the JHC on the Hiyoshigura Viaduct to show the application and effectiveness of carbon sheet strengthening. Alternative Concepts Steel plate bonding. Design Considerations Change in live load brought about by code change from TL 20 to TL 25 (truck load increase from 20 to 25 tons). Project Contact Mr. M. Uemura, Secretary, CFRRA, and General Manager, Tonen. Project Description As a demonstration project for JHC, two deck sections of the Hiyoshigura Viaduct northwest of Narita Inter-national Airport were strengthened by Tonen Corporation with carbon sheets (see Figures 127 to 131). The deck sections are 3 m wide (9.8 ft) and 30 m long (98 ft) and were overlaid with two perpendicular layers of 300-g/m2 high-modulus, pitch-based carbon tow sheets. Before the repair and strengthening measures, deck slabs had exhibited the typical orthotropic distress crack patterns shown in Figure 128. Construction/Installation Installation was performed from scaffolds with two crews of two people each for one week doing the actual carbon sheet application. Construction steps consisted of: 1. Sandblast and clean surface 2. Apply primer to surface
3. Apply fabric to primer 4. Apply resin to fabric 5. Repeat 3 and 4, but rotate fabric 90 degrees. Instrumentation, Monitoring, Testing Proof testing with a 25-ton truck has been completed (see Figure 129). Future retesting is possible. Special Issues With a continuous watertight CFRP layer at the bottom soffit, questions of moisture drainage have been raised. Can possible problems be detected with only visual inspections?
5.11 TOKYO RAINBOW BRIDGE (PROJECT J11) Project Summary A double-deck suspension bridge with mainspan of 570 m (1,869 ft) at the entrance of the Port of Tokyo. Fibra7 pretensioned aramid rods were used in the southeast abutment boat landing and precast concrete walkway panels (Figure 132). Project Data Owner: Tokyo Metropolitan Expressway Public Corporation Completed: August 1991 (precast concrete panels)
Project Objective Increase durability and eliminate corrosion in the splash zone through the use of nonmetallic reinforcement (Fibra7 aramid bars) of the precast walkway panels around the southeast cable anchorage. Design Considerations Elimination of corrosion in the splash zone, increased durability, reduced maintenance. Project Contact Mr. K. Nishikawa, Head, Bridge Division, PWRI. Project Description The Rainbow Bridge at the Port of Tokyo is a 918-m-long (3,010-ft) suspension bridge with a 570-m (1,868-ft) mainspan (Figures 133 and 136). The upper level of the double-deck steel truss superstructure carries Route 11, the Daiba Line of the Tokyo Metropolitan Expressway. The lower level accommodates a new commuter transit system, waterfront roads, and a pedestrian promenade. At the base of the southeast cable anchorage housing is a cantilevered service and boat landing walkway, which is in the splash zone of the Tokyo Bay ocean water. The hollow-core, precast concrete walkway panels (Figures 134 and 135) were pretensioned with 9-mm (0.35-in) Fibra7 aramid rods to eliminate corrosion and reduce maintenance.
The hollow-core, precast concrete deck panels are 5 m long (16 ft), 0.91 m wide (3 ft), and 200 mm deep (8 in). They are prestressed with 10 Fibra FA 97 tendons that are 9 mm in diameter (0.35 in). A total of 900 m2 (9,675 ft2) of precast, prestressed concrete aramid deck panels was used.
6.0 TRANSFERABILITY OF TECHNOLOGY
TO THE UNITED STATES 6.1 U.S. Technology Perspective One of the main objectives of this technology scanning tour was to compare the U.S. advanced composite bridge technology with the state of technology abroad. A general observation from this scanning tour is that U.S. advanced composite bridge technology has developed concurrently with international technology and is neither behind nor significantly ahead of the countries visited. In specific areas, such as FRP cable/tendon and anchorage technology development, the United States has only limited commercial systems available; however, testing and evaluation of cable, anchorage, and reinforcing systems under short- and long-term load and environmental conditions is well advanced. On the other hand, seismic retrofitting systems for bridge columns seem to be more advanced in the United States, particularly in terms of consistent design philosophies and guidelines. Strengthening measures with FRP sheets have been developed and applied both abroad and in the United States. In the United States, more basic or generic research seems to be performed on the use of advanced composites in civil engineering environments at numerous universities and research laboratories. Abroad, research and development efforts seem to be much more product specific or industry driven, resulting in earlier and more high-visibility demonstration projects than in the United States. There are, however, significant differences between the United States and the countries visited in the following areas:
In the countries visited, there seemed to be a more direct link between research and pro-duct development, which is typical for re-search and development programs initiated and sponsored by industry. In the United States, the fragmented nature of independent and generic research, largely sponsored by government agencies, seems to be more of an obstacle to product development and implementation than a catalyst for it. The United State must strike a better balance between basic and applied research in the form of coordinated research and develop-ment programs that include full participation of the advanced composite industry and the civil engineering and construction industries. 6.2 Transferable Technology During the scanning tour, many different products, procedures, and concepts were encountered that should be further evaluated for transfer to the U.S. industry and market. In some cases, similar U.S. products and processes exist, but in others, the particular technology is not commercially available in the United States at this time. In virtually all instances, however, costs for the demonstrated technologies will make it very difficult to compete in the U.S. bridge market, unless significant reductions can be realized. Furthermore, transfer of specific technologies observed abroad may require reevaluation of their underlying design concepts and procedures to conform to U.S. practice and standards. For example, it will be difficult to provide external strengthening of bridge decks by bonding CFRP laminates or sheets to the bottom soffit to obtain significant flexural capacity increases. Such techniques would require provisions for continuation of at least parts of the reinforcement into the support region. Also, to ensure aggregate interlock in shear in beam or column strengthening, strict strain and dilation criteria need to be employed. These criteria will automatically result in stiffness-driven design approaches, where the high degree of strength of advanced composite material cannot be fully used. In other words, some of the design approaches observed by the scanning team would need to be evaluated and modified for consistent application in the United States. Specific technologies that should be further considered for possible U.S. applications are outlined below, in chronological order of the scanning tour.
Beyond direct technology transfer of the specific commercial systems outlined above, there are important lessons to be learned from abroad with respect to the involvement of the civil engineering and construction industries; coordinated applied research and product development, with full industrial backing and support; numerous industry-subsidized demonstration projects to showcase the technology; and comprehensive training and education of design and construction professionals. Missing items to date, both in the United States and abroad are: (1) comprehensive, performance-based design standards and specifications and (2) demonstration projects with full instrumentation and detailed long-term monitoring and evaluation plans and procedures. Such plan should be implemented to establish actual field data for durability, long-term performance characteristics, maintenance, and life-cycle costs. The technology scanning team hopes that these findings will lead to the necessary initiatives to establish long-term instrument-ation and monitoring programs on several prototype demonstration projects throughout the United States.
ACRONYMS AND ABBREVIATIONS
με micro-strains or 10 ACC Advanced Composite Cable (Club) (Japan)
REFERENCES
[1] Burgoyne, C.J., ANew Materials Research at the University of Cambridge,@ FRP RCS-2, Ghent, 1995. [2] Lees, J.M., and Burgoyne, C.J., AInfluence of Bond on Rotation Capacity of Concrete Pre-Tensioned with AFRP,@ ACMBS-2, Montreal, 1996. [3] Cunninghame, J.R; Chakrabati, S.; Clarke, J.L., ANon-Ferrous Prestressing and Reinforcement for Concrete Highway Bridges,@ United Kingdom Highways Agency and Transport Research Laboratory, United Kingdom, 1996. [4] Head, P., AHigh-Performance Structural Materials: Advanced Composites,@ IABSE Colloquium on Remaining Structural Capacity, Copenhagen, 1996. [5] Rostasy, F.S., AFRP: The European Perspective,@ Proceedings of the First International Conference on Composites in Infrastructure, Tucson, AZ, 1996. [6] Wolff, R., and Miesseler, H.J., AExperience with Glassfibre Prestressing Elements for Concrete Bridges,@ ACMBS-1, Sherbrooke, 1992. [7] Wolff, R., and Miesseler, H.J., AMonitoring of Trial Loadings of Bridges Using Optical Fiber Sensors,@ IABSE Colloquium on Remaining Structural Capacity, Copenhagen, 1993. [8] Meier, U., AAdvanced Composites for Structural Repair: European Perspective,@ ACMBS-2, Montreal, 1996. [9] Meier, U., AStrengthening of Structures Using Carbon Fibre/Epoxy Composites,@ Construction and Building Materials, Vol. 9, No. 6, 1995. [10] Meier, U., AExtending the Life of Cables by Use of Carbon Fibers,@ IABSE Symposium on Extending the Lifespan of Structures, San Francisco, 1995. [11] Sennhauser, U.; Bronnimann, R.; Nellen, P.M., AReliability Modeling and Testing of Optical Fiber Bragg Sensors for Strain Measurements,@ International Symposium on Optical Science, Engineering, and Instrumentation, SPIE Vol. 2839-7, Denver, CO, 1996. [12] PWRI, ADesign and Construction Guidelines for Prestressed Concrete Highway Bridges Using FRP Tendons,@ Report 100, Draft, Tsukuba City, 1994. [13] Kanda, M., et al., AMaterial Properties of FRP Tendons,@ FIP Symposium 1993, Kyoto, 1993. [14] Tsuji, Y.; Kanda, M.; Tamura, T., AApplications of FRP Materials to Prestressed Concrete Bridges and Other Structures,@ PCI Journal, July-August, 1993. [15] Advanced Composite Cable Club of Japan, AACC Club Projects Using New Materials,@ ACC Club, 02-2T-SA, 1995. [16] Hojishima, T.; Yagi, K.; Tanaka, T.; Ando, T., AProperties of CFRP Composites for Concrete Structures,@ Proceedings of the First International Conference on Composites in Infrastructure, Tucson, AZ, 1996. [17] Yagi, K.; Tanaka, T.; Jinnai, T., AExperimental Studies on Strengthening of Prestressed Concrete Beams with Carbon Fiber Sheet,@ Proceedings of the First International Conference on Composites in Infrastructure, Tucson, AZ, 1996. [18] Nakamura, M.; Sakai, H.; Yagi, K.; Tanaka, T., AExperimental Studies on the Flexural Reinforcing of Carbon Fiber Sheet Bonded to Reinforced Concrete Beams,@ Proceedings of the First International Conference on Composites in Infrastructure, Tucson, AZ, 1996. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|