CFLHD Highway Design Forms
These forms are prepared for each project during the design process in the Central Federal Lands Highway Division:
Design Documentation Forms
-
Highway Design Standards Form (internal projects) (Word, 85 KB) - Form used by internal staff to document decisions involving design standards and practices for each project. (Rev 10-20-16)
See also Supplement 9.1.3.4-1 (Acrobat, 118 KB) and HDS form examples (Acrobat, 172 KB)
-
Highway Design Standards Form (A/E projects) (Word, 86 KB) - Form used by A/E staff to document decisions involving design standards and practices for each project. (Rev 10-20-16)
See also Supplement 9.1.3.4-1 (Acrobat, 118 KB) and HDS form examples (Acrobat, 172 KB)
- ERFO Highway Design Standards Memorandum (Word, 99 KB) - Memorandum used to document decisions involving ERFO projects. (Rev 10-20-16)
-
Design Technical Memorandum Template (Word, 277 KB) - Form used to document design decisions (Rev 04-24-15)
See also Supplement 9.6.6.2-1 (Acrobat, 28 KB)
- Trip Report Form - Template used to document discussions and decisions during field trips (Rev 06-09-11)
- CFLHD CADD File Tracker - Used for tracking project-specific GEOPAK information. (Rev 04-24-15)
- Brand Name or Approved Equal Justification Memo - Document required when a specific brand name or approved equal is included in the contract. (Rev 10-20-16)
- PE Notebook Checklist - Checklist for transmittal of design information to Construction to be completed prior to award date. (Rev 03-02-16)
- Electronic File Disclaimer - Document included when responding to requests for CADD files. (Rev 05-08-09)
PS&E Advertisement Checklist Forms
- PS&E Advertisement Checklist - Tool used to verify all required information is gathered prior to forwarding the PS&E to Acquisitions. (Rev 09-01-15)
- Quality Assurance Certification - Use with PS&E Advertisement Checklist. (Rev 09-01-15)
- Contact List - Use with PS&E Advertisement Checklist. (Rev 09-01-15)
PS&E Review Forms
- Document Review Comment and Response Form - Form used to document PS&E comments. (Rev 10-15-07)
Customer Satisfaction Survey Request Form
- FLH Customer Satisfaction Survey Request Forms - Form used to collect feedback on CFLHD projects. (Rev 05-26-11)
Development Checklists
These checklists are used during the design process as a quality control tool.
- 15% Development Checklist (Rev 04-25-15)
- 30% Development Checklist (Rev 04-25-15)
- 50% Development Checklist (Rev 04-25-15)
- 70% Development Checklist (Rev 04-25-15)
- 95% Development Checklist (Rev 04-25-15)
- 100% Development Checklist (Rev 04-25-15)