ADB-2016-05 |
[Docket No. PHMSA-2016-0075]; [FR Cite: 81 FR 54512]; Pipeline Safety: Clarification of Terms Relating to Pipeline Operational Status. |
08/16/2016 |
ADB-2016-04 |
[Docket No. PHMSA-2016-0071]; [FR Cite: 81 FR 40398]; Pipeline Safety: Ineffective Protection, Detection, and Mitigation of Corrosion Resulting From Insulated Coatings on Buried Pipelines. |
06/21/2016 |
ADB-2016-03 |
[Docket No. PHMSA-2016-0013]; [FR Cite: 81 FR 7412]; Pipeline Safety: Dangers of Abnormal Snow and Ice Build-up on Gas Distribution Systems. |
02/11/2016 |
ADB-2016-02 |
[Docket No. PHMSA-2016-0016]; [FR Cite: 81 FR 6334]; Pipeline Safety: Safe Operations of Underground Storage Facilities for Natural Gas. |
02/05/2016 |
ADB-2016-01 |
[Docket No. PHMSA-2015-0283]; [FR Cite: 51 FR 2943]; Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding, River Scout, and River Channel Migration. |
01/19/2016 |
ADB-2015-02 |
[Docket No. PHMSA-2015-0140] Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by the Passage of Hurricanes; ACTION: Notice; Issuance of Advisory Bulletin. |
Jun 23, 2015 |
ADB-2015-01 |
Potential for Damage to Pipeline Facilities Caused by Flooding, River Scour, and River Channel Migration, Notice: Issuance of Advisory Bulletin |
Apr 9, 2015 |
ADB-2014-05 |
Docket No.: PHMSA 2014-0086 Reminder to perform evaluations of their Integrity Management (IM) programs. Notice: Issuance of Advisory Bulletin |
Oct 15, 2014 |
ADB-2014-04 |
Docket Number: PHMSA-2014-0400 Potential significant impacts of flow reversals, product changes and conversions. Notice: Issuance of advisory bulletin |
Sep 18, 2014 |
ADB-2014-03 |
Docket No. PHMSA-2014-0017 Pipeline Safety: Construction Notification Action: Notice: Issuance of Advisory Bulletin |
Sep 12, 2014 |
ADB-2014-02 |
Docket Number: PHMSA-2014-0020 Pipeline Safety: Lessons Learned From the Release at Marshall, Michigan ACTION: Notice; issuance of advisory bulletin. |
May 6, 2014 |
ADB-2014-01 |
[Docket No. PHMSA-2013-0226] Improvements in Preparing Oil Spill Facility Response Plans ACTION: Notice; Issuance of Advisory Bulletin |
Jan 28, 2014 |
ADB-2013-03: Correction |
[Docket No. PHMSA-2013-0097] 78 FR 65427 Pipeline Safety: Reminder of Requirements for Liquefied Petroleum Gas and Utility Liquefied Petroleum Gas Pipeline Systems |
Oct 31, 2013 |
ADB-2013-04 |
Docket No. PHMSA-2013-0185 Pipeline Safety: Notice to Operators of Hazardous Liquid and Natural Gas Pipelines of a Recall on Leak Repair Clamps Due to Defective Seal |
Aug 28, 2013 |
ADB-2013-03 |
[Docket No. PHMSA-2013-0097] 78 FR 42889 Reminder of Requirements for Utility LP-Gas and LPG Pipeline Systems |
Jul 18, 2013 |
ADB-2013-02 |
Potential for Damage to Pipeline Facilities Caused by Flooding |
Jul 12, 2013 |
ADB-2013-01 |
Pipeline Safety: Accident and Incident Notification Time Limit: Issuance of Advisory Bulletin. |
Jan 30, 2013 |
ADB-2012-11 |
ADB-2012-11: Reporting of Exceedances of Maximum Allowable Operating Pressure December 21, 2012 |
Dec 21, 2012 |
ADB-2012-10 |
Pipeline Safety: Using Meaningful Metrics in Conducting Integrity Management Program Evaluations December 5, 2012 |
Dec 5, 2012 |
ADB-12-09: Communication During Emergency Situations |
SUMMARY: PHMSA is issuing this Advisory Bulletin to remind operators of gas, hazardous liquid, and liquefied natural gas pipeline facilities that operators should immediately and directly notify the Public Safety Access Point (PSAP) that serves the communities and jurisdictions in which those pipelines are located when there are indications of a pipeline facility emergency. |
Oct 11, 2012 |
ADB-12-08 |
SUMMARY: PHMSA is issuing an advisory bulletin to alert all pipeline owners and operators of the circumstances of the Canadian National Railway Company freight train derailment that occurred in Cherry Valley, Illinois on June 19, 2009. |
Jul 31, 2012 |
ADB-12-07 |
SUMMARY: PHMSA is issuing an Advisory Bulletin to provide clarification to owners and operators of gas distribution pipeline facilities when completing the Mechanical Fitting Failure Report Form, PHMSA F 7100.1-2. |
Jun 11, 2012 |
ADB 12-06 |
PHMSA is issuing an Advisory Bulletin to remind operators of gas and hazardous liquid pipeline facilities to verify their records relating to operating specifications for maximum allowable operating pressure (MAOP) required by 49 CFR 192.517 and maximum operating pressure (MOP) required by 49 CFR 195.310. |
May 7, 2012 |
ADB-12-05 |
PHMSA is issuing an advisory bulletin to owners and operators of natural gas cast iron distribution pipelines and state pipeline safety representatives. |
Mar 23, 2012 |
ADB-12-04 |
PHMSA is issuing this notice to advise owners and operators of pipeline facilities of PHMSA's plan for implementing the national registry of pipeline and liquefied natural gas operators. This notice provides updates to the information contained in a PHMSA Advisory Bulletin published on January 13, 2012 (77 FR 2126). |
Mar 21, 2012 |
ADB-12-03 |
PHMSA is issuing this advisory bulletin to alert operators using Driscopipe® 8000 High Density Polyethylene Pipe (Drisco8000) of the potential for material degradation. |
Mar 6, 2012 |
ADB-12-02 |
PHMSA is issuing this advisory bulletin to remind operators of pipelines and LNG facilities of the need to conduct post accident drug and alcohol testing of all potentially involved personnel despite uncertainty about the circumstances of the accident. |
Feb 23, 2012 |
ADB-12-01 |
PHMSA is issuing this advisory bulletin to advise owners and operators of pipeline facilities within PHMSA's plan of the implementation of the national registry of pipeline and liquefied natural gas operators. |
Jan 13, 2012 |
ADB-11-05 |
Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by the Passage of Hurricanes |
Sep 1, 2011 |
ADB-11-04 |
Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding |
Jul 27, 2011 |
ADB-11-07 |
PHMSA is issuing this document to notify operators of natural gas and hazardous liquid pipeline facilities of the creation of a dedicated "Presiding Official" for informal pipeline enforcement hearings and the process operators can expect when requesting an informal hearing. |
Jul 12, 2011 |
ADB-11-03 |
PHMSA-2011-0121: Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements |
May 17, 2011 |
ADB-11-02 |
PHMSA -2011-0028: Pipeline Safety: Dangers of Abnormal Snow and Ice Build-Up on Gas Distribution Systems |
Feb 9, 2011 |
ADB -11-01 |
PHMSA-2010-0381; Pipeline Safety: Establishing Maximum Allowable Operating Pressure or Maximum Operating Pressure Using Record Evidence, and Integrity Management Risk Identification, Assessment, Prevention, and Mitigation |
Jan 10, 2011 |
ADB-10-08 |
PHMSA-2010-0307: Pipeline Safety: Emergency Preparedness Communications |
Nov 3, 2010 |
ADB-10-07 |
PHMSA-2010-0226; Liquefied Natural Gas Facilities: Obtaining Approval of Alternative Vapor-Gas Dispersion Models |
Aug 31, 2010 |
ADB-10-06 |
Pipeline Safety: Personal Electronic Device Related Distractions |
Aug 3, 2010 |
ADB-10-05 |
PHMSA-2010-0175- Pipeline Safety: Updating Facility Response Plans in Light of the Deepwater Horizon Oil Spill |
Jun 28, 2010 |
ADB-10-04 |
PHMSA-2008-0211 - Pipeline Safety: Implementation of Electronic Filing for Recently Revised Incident/Accident Report Forms for Distribution Systems, Gas Transmission and Gathering Systems, and Hazardous Liquid Systems |
Apr 29, 2010 |
ADB-10-03 |
PHMSA-2010-0078 Pipeline Safety: Girth Weld Quality Issues Due to Improper Transitioning, Misalignment, and Welding Practices of Large Diamater Line Pipe |
Mar 24, 2010 |
ADB-10-02 |
PHMSA-2008-0211: Implementation of Revised Incident/Accident Report Forms for Distribution Systems, Gas Transmission and Gathering Systems, and Hazardous Liquid Systems |
Feb 3, 2010 |
ADB-10-01 |
PHMSA-2009-0421: Pipeline Safety: Leak Detection on Hazardous Liquid Pipelines |
Jan 26, 2010 |
ADB-09-04 |
PHMSA-2009-0408: Reporting Drug and Alcohol Test Results for Contractors and Multiple Operator Identification Numbers |
Jan 19, 2010 |
ADB-09-03 |
PHMSA-2009-0349; Pipeline Safety: Operator Qualification (OQ) Program Modifications |
Dec 7, 2009 |
ADB-09-02 |
PHMSA-2009-0158;Weldable Compression Coupling Installation |
Sep 30, 2009 |
ADB-09-01 |
PHMSA-2009-0148; Pipeline Safety: Potential Low and Variable Yield and Tensile Strength and Chemical Composition Properties in High Strength Line Pipe. |
May 21, 2009 |
ADB-08-08 |
PHMSA-2008-0300; Pipeline Safety: Proper Identification of Internal Corrosion Risk; Notice; Issuance of Advisory Bulletin |
Nov 24, 2008 |
ADB-08-07 |
PHMSA-RSPA-1997-2426; National Pipeline Mapping System; Notice; Issuance of Advisory Bulletin |
Jul 31, 2008 |
ADB-08-06 |
Dynamic Riser Inspection, Maintenance, and Monitoring Records on Offshore Floating Facilities. |
Jul 2, 2008 |
ABD-08-05 |
Notice to Hazardous Liquid Pipeline Operators of Request for Voluntary Advance Notification of Intent To Transport Biofuels |
Jun 25, 2008 |
ADB-08-04 |
Pipeline Safety: Installation of Excess Flow Valves into Gas Service Lines |
Jun 5, 2008 |
ADB-08-01 |
Notice to Operators of Gas Transmission Pipelines on the Regulatory Status of Direct Sales Pipelines |
May 13, 2008 |
ADB-08-03 |
Dangers of Abnormal Snow and Ice Build-up on Gas Distribution Systems |
Mar 10, 2008 |
ADB-08-02 |
Issues Related to Mechanical Couplings Used in Natural Gas Distribution Systems |
Mar 4, 2008 |
ADB-08-02 |
Correction to Advisory Notice |
Feb 29, 2008 |
ADB-07-01 |
Updated Notification of the Susceptibility to Premature Brittle-like Cracking of Older Plastic Pipe |
Sep 6, 2007 |
ADB-07-01 |
Senior Executive Signature and Certification of Integrity Management Program Performance Reports |
Apr 23, 2007 |
ADB-06-04 |
Lessons Learned From a Security Breach at a Liquefied Natural Gas Facility |
Dec 28, 2006 |
ADB-06-03 |
Notice to Operators of Natural Gas and Hazardous Liquid Pipelines to Accurately Locate and Mark Underground Pipelines Before Construction-Related Excavation Activities Commence |
Nov 22, 2006 |
ADB-06-02 |
Submission of Public Awareness Programs |
Jun 16, 2006 |
ADB-06-01 |
Advisory on Operator Qualifications for Excavation Activities |
Jan 17, 2006 |
ADB-05-07 |
Potential for Damage to Natural Gas Distribution Pipeline Facilities Caused by the Passage of Hurricane Katrina |
Sep 7, 2005 |
ADB-05-08 |
Potential for Damage to Pipeline Facilities Caused by the Passage of Hurricane Katrina |
Sep 7, 2005 |
ADB-05-06 |
Countermeasures to Prevent Human Fatigue in the Control Room |
Aug 11, 2005 |
ADB-05-05 |
Inspecting and Testing Pilot-Operated Pressure Relief Valves |
Aug 10, 2005 |
ADB-05-04 |
Integrity Management Notifications for Gas Transmission Lines |
Jul 29, 2005 |
ADB-05-03 |
Planning for Coordination of Emergency Responses to Pipeline Emergencies |
May 23, 2005 |
ADB-05-02 |
Strapping Table Calibration for Breakout Tank Operators |
Apr 6, 2005 |
ADB-05-01 |
Semi-Annual Reporting of Performance Measures for Gas Transmission Pipeline Integrity Management |
Jan 21, 2005 |
ABD 04-05 |
Modifications to OQ programs for individuals performing covered tasks on gas and hazardous liquid pipeline facilities |
Nov 26, 2004 |
ABD-04-01 |
Hazards Associated with de-watering of pipelines |
Sep 29, 2004 |
ADB-04-04 |
Potential for Damage to Pipeline Facilities Caused by the Passage of Hurricane Ivan |
Sep 23, 2004 |
ADB-04-03 |
Unauthorized excavations and the installation of third-party data acquisition devices on underground pipeline facilities |
Aug 18, 2004 |
ADB-04-02 |
Semi-Annual Reporting of Performance Measures for Gas Transmission Pipeline Integrity Management |
Jul 22, 2004 |
ADB-03-09 |
Potential Service Disruptions in Supervisory Control and Data Acquisition Systems |
Dec 23, 2003 |
ADB-03-08 |
Self-Assessment of Pipeline Operator Public Education Programs |
Nov 25, 2003 |
ADB-03-07 |
Guidance On When The Baseline Integrity Assessment Begins |
Nov 17, 2003 |
ADB-03-06 |
Corrosion Threat to Newly Constructed Gas Transmission and Hazardous Liquid Pipelines |
Nov 12, 2003 |
ADB-03-05 |
Stress Corrosion Cracking (SCC) Threat to Gas and Hazardous Liquid Pipelines |
Oct 8, 2003 |
ADB-03-04 |
Pipeline Industry Implementation of Effective Public Awareness Programs |
Sep 5, 2003 |
ADB-03-03 |
Identified Sites as Part of High Consequence Areas for Gas Integrity Management Programs |
Jul 17, 2003 |
ADB-03-02 |
Required Submission of Data to the National Pipeline Mapping System Under the Pipeline Safety Improvement Act of 2002 |
Feb 3, 2003 |
ADB-03-01 |
Updates of Digital Mapping Data for Hazardous Liquid Pipeline High Consequence Areas |
Jan 22, 2003 |
ADB-02-07 |
Notification of the Susceptibility to Premature Brittle-Like Cracking of Older Plastic Pipe; Notice; correction |
Dec 3, 2002 |
ADB-02-07 |
Notification of the Susceptibility to Premature Brittle-Like Crackin of Older Plastic Pipe |
Nov 26, 2002 |
ADB-02-06 |
Definition of Onshore Gas Gathering Lines |
Oct 18, 2002 |
ADB-02-05 |
Safety of Liquefied Petroleum Gas (LPG) Distribution Systems |
Sep 10, 2002 |
ADB-02-04 |
Telephonic Notification to National Response Center |
Aug 30, 2002 |
ADB 02-02 |
Revised Natural Gas Transmission Pipeline Incident and Annual Report Forms |
Jul 17, 2002 |
ADB-02-01 (02) |
Revised Natural Gas Transmission Pipeline Incident and Annual Report Forms |
Jul 5, 2002 |
ADB-02-03 |
Gas and Hazardous Liquid Pipeline Mapping |
Jun 13, 2002 |
ADB-02-01 |
Notice to Operators of Natural Gas and Hazardous Liquid Pipelines To Encourage Continued Implementation of Safe Excavation Practices |
May 24, 2002 |
ADB-01-02 |
Emergency Plans and Procedures for Responding to Multiple Gas Leaks and Migration of Gas into Buildings |
Oct 4, 2000 |
ADB-01-01 |
Closure of Gas Shut-Off Valves Serving Permanently Moored Vessels (PMV) During High-water Condition |
Sep 27, 2000 |
ADB-00-02 |
Internal Corrosion in Gas Transmission Pipelines |
Sep 1, 2000 |
ADB-99-02 |
Potential failures due to cracking of plastic pipe in natural gas systems |
Oct 1, 1999 |
ADB-99-01 |
Potential failures due to cracking of plastic pipe manufactured by Century Utility Products, Inc. |
Sep 1, 1999 |
ADB-99-04 |
Directional Drilling and Other Operations Conducted in Proximity to Underground Pipeline Facilities |
Aug 23, 1999 |
ADB-99-03 |
Potential Service Interruptions in Supervisory Control and Data Acquisition Systems |
Jul 7, 1999 |
ADB-98-04 |
Regulatory authority of pipelines on the OCS |
Sep 15, 1998 |
ADB-98-03 |
Damage potential from Hurricane Georges |
Sep 1, 1998 |
ADB-98-01 |
Potential Computer Problems Related to the Year 2000 (Y2K) |
Aug 7, 1998 |
ADB-97-05 |
Potential Failure of Check Valves Following Remanufacturing |
Nov 12, 1997 |
ADB-97-04 |
Underground Storage of Natural Gas or Hazardous Liquids |
Jul 10, 1997 |
ADB-97-03 |
Potential Soil Subsidence on Pipeline Facilities |
Mar 4, 1997 |
ADB-97-01 |
Potential Damage to Pipelines by Impact of Snowfall, and Actions Taken by Homeowners and Others to Protect Gas Systems from Abnormal Snow Build-up |
Jan 24, 1997 |
ADB-95-02 |
Increased Pipeline Transportation Security Measures |
Aug 9, 1995 |
ADB-95-01 |
Auditing of Drug and Alcohol Plans by Consortiums or Third Party Administrators |
May 12, 1995 |
ADB-94-05 |
Pipelines Affected by Flooding |
Nov 2, 1994 |
ADB-94-03 |
Pipelines in a common right-of-way, parallel right-of-way, or cross a rail right-of-way |
Feb 23, 1994 |
ADB-94-02 |
]alve Location and Spacing |
Jan 19, 1994 |
ADB-94-01 |
Certain Requirements Applying to Supplemental Incident/Accident Reports and Estimated Property Damage Totals |
Jan 13, 1994 |
ADB-93-05 |
Drug Testing Information |
Dec 10, 1993 |
ADB-93-04 |
Persons Seeking Interpretations of Pipeline Safety Regulations Include Certain Information |
Nov 16, 1993 |
ADB-93-03 |
Advisory to Owners and Operators of Hazardous Liquid and Natural Gas Pipeline Facilities in Areas of Flooding |
Jul 29, 1993 |
ADB-93-02 |
Advisory to Owners and Operators of Gas Distribution and Gas Transmission Facilities; Continuing Educational Program for Gas Customers and the Public |
Apr 9, 1993 |
ADB-93-01 |
Pipeline Safety Advisory Bulletin; Snow Accumulation on Gas Pipeline Facilities |
Feb 3, 1993 |
ADB-92-01 |
Potential damage to Pipelines by Hurricane Andrew |
Aug 23, 1992 |
ALN-92-02 |
Addresses concerns arising from Allentown, P A, explosion |
Jan 26, 1992 |
ALN-92-01 |
Lightning-induced electrical discharge from tracer wire to plastic pipe. |
Jan 8, 1992 |
ALN-91-04 |
NTSB recommendations S P-91-3/P-91-4, 03/15/90 NY leak/explosion: Requiring operators to extend their public education/emergency preparedness programs |
Nov 20, 1991 |
ALN-91-03 |
NTSB SR P-91-2 Texas Eastern Product Pipeline Company Explosion 2/20/90: Actions to be taken before moving a pipeline |
Oct 22, 1991 |
ALN-91-02 |
NTSB recently issued recommendation P-91-12 related to the August 1990 explosion and fire in Allentown, PA, caused by a crack in a 4-inch cast iron gas main. |
Oct 11, 1991 |
ALN-91-01 |
Reemphasize each pipeline operator's responsibility to report promptly; ciriteria specified in 49 CFR 191.5/195.52 |
Apr 15, 1991 |
ALN-90-01 |
Advise offshore water operators of recurring safety problems involving marine vessel operations and crew safety |
Apr 9, 1990 |
ALN-89-02 |
Results of OPS-conducted investigation of the San Bernardino, CA, 05/12/89 train derailment; each gas/liquid operator should test check valves. |
Apr 13, 1989 |
ALN-89-01 |
Update: Additional findings relative to factors contributing to operational failures of pipelines constructed by ERW prior to 1970 |
Mar 8, 1989 |
ALN-88-01 |
Recent findings relative to factors constributing to operational failures of pipelines constructed with ERW prior to 1970 |
Jan 28, 1988 |
ALN-87-01 |
Incident involving the fillet welding of a full encirclement repair sleve on a 14" API 5LX-52 pipeline; King of Prussia, PA 10/07/86 pipeline failure |
Mar 13, 1987 |
ADB-86-02 |
Plastic Piping, Mechanical Coupling |
Feb 26, 1986 |
ALN-80-04 |
Use of stainless steel band clamps for permanent repair of damaged plastic pipe. |
Oct 1, 1980 |