Open Recommendations
OAA Open--Acceptable Response: Response by recipient indicates a planned action that would comply with the safety recommendation when completed.
OAAR Open--Acceptable Alternate Response: Response by recipient indicates an alternate plan or implementation program that would satisfy the objective of the safety recommendation when implemented.
OUA Open--Unacceptable Response: Response by recipient expresses disagreement with the need outlined in the recommendation or attempts to convince the Board (unsuccessfully) that an alternative course of action is acceptable. The Board believes, however, that there is enough supporting evidence to ask the recipient to reconsider its position. This status can also be used when the Board believes that action is not being taken in a timely manner.
ORR Open--Response Received: Response has been received from recipient, but staff evaluation of the response has not been approved by the Board Members.
OAR Open--Await Response: When a safety recommendation is issued, the status "Open-Await Response" is automatically assigned.
Currently Open Recommendations
 
P-01-02 South Riding - Pipeline Technology (Excess Flow Valves); OAA Jun 22, 2001
 
P-09-02 ERW Study Implementation; OAA Oct 27, 2009
 
P-11-08 PG&E Rupture - Providing System-Specific Information; OAA Sep 26, 2011
 
P-11-09 PG&E Rupture - Immediate 911 Notifications; OAA Sep 26, 2011
 
P-11-10 PG&E Rupture - Equipping SCADA Systems; OAA Sep 26, 2011
 
P-11-11 PG&E Rupture - Installing ACVs or RCVs; OAA Sep 26, 2011
 
P-11-12 PG&E Rupture - Eliminating Operator Discretion; OAA Sep 26, 2011
 
P-11-14 PG&E Rupture - Eliminating Grandfather Clause; OAA Sep 26, 2011
 
P-11-15 PG&E Rupture - Post-Construction Hydrostatic Pressure Test; OAA Sep 26, 2011
 
P-11-18 PG&E Rupture - Revision of Integrity Management Protocol; OAA Sep 26, 2011
 
P-11-20 PG&E Rupture - Meaningful Metrics; OAA Sep 26, 2011
 
P-12-3 Enbridge - Engineering Assessment of Cracks; OAA Jul 25, 2012
 
P-12-4 Revising the "discovery of condition"; OAA Jul 25, 2012
 
P-12-7 Enbridge - Team Training; OAA Jul 25, 2012
 
P-12-8 Enbridge - Extend OQ Requirements to Control Center Staff; OAA Jul 25, 2012
 
P-12-9 Enbridge - Harmonize OSR Planning Requirements; OAA Jul 25, 2012
 
P-14-01 Sissonville – Add Principal Roadways to HCA Requirements; OAA Mar 5, 2014