Title |
Date |
UMR Mile |
Subject |
PN 16-19 |
10/14/16 |
194 |
Chain of Rocks Upper Canal Entrance Closure
|
PN 17-1 |
10/06/16 |
185.5 |
Lock 27 Main Lock Closure
|
PN 15-14H |
10/06/16 |
46 - 38 |
Rock Removal Dredging
|
PN 16-18A |
09/20/16 |
0.8 |
Kaskaskia River Lock
|
PN 16-14G |
09/29/16 |
46 - 38 |
Rock Removal Dredging Upper Mississippi River
|
PN 16-14F |
09/22/16 |
46 - 38 |
Rock Removal Dredging Upper Mississippi River
|
PN 16-14E |
09/14/16 |
46 - 38 |
Rock Removal Dredging Upper Mississippi River
|
PN 16-18 |
09/14/16 |
0.8 |
Lock Closure Kaskaskia River RM 0.8
|
PN 16-17 |
08/26/16 |
0.8 |
Lock Closure Kaskaskia River RM 0.8
|
PN 16-14D |
08/26/16 |
46-38 |
Rock Removal Dredging |
PN 16-14C |
08/18/16 |
46-38 |
Rock Removal Dredging |
PN 16-14B |
08/09/16 |
46-38 |
Rock Removal Dredging |
PN 16-15 |
07/14/16 |
200 - 201 |
BANKLINE REVETMENT Upper Mississippi River mile 200-201
|
PN 16-14 |
07/11/16 |
0.8 |
SCHEDULED PARTIAL LOCK CLOSURE Jerry F. Costello Lock
|
PN 16-13 |
06/16/16 |
200.5 |
SCHEDULED CLOSURE - Melvin Price Locks & Dam
Upper Mississippi River mile 200.5
|
PN 16-12 |
06/03/16 |
0-300
|
CHANNEL MAINTENANCE DREDGING - USACE Dredge Potter Upper Mississippi River mile 0 - 300
|
PN 16-11 |
05/24/16 |
185.5 |
SCHEDULED LOCK CLOSURE Locks 27, Main Chamber
|
PN 16-10A |
05/24/16 |
273.4 |
EMERGENCY CLOSURE CANCELED Culvert Valve Repairs Lock & Dam 24
|
PN 16-10 |
05/19/16 |
273.4 |
EMERGENCY CLOSURE Culvert Valve Repairs Lock & Dam 24
|
PN 16-9 |
05/02/16 |
273.4 |
SCHEDULED LOCK CLOSURE Lock & Dam 24
|
PN 16-7B |
04/18/16 |
44-40 |
River Closure - Canceled
|
PN 16-8 |
04/12/16 |
287.5 |
Bankline construction activity - Red shanks conservation area
|
PN 16-7A |
04/08/16 |
44-40 |
Scheduled Lock Closure, Lock 27 Main Chamber
|
PN 16-07 |
04/07/16 |
42-20 |
Scheduled Lock Closure, Lock 27 Main Chamber
|
PN 16-06 |
04/06/16 |
185.5 |
Scheduled Lock Closure, Lock 27 Main Chamber
|
PN 16-05 |
03/09/16 |
185.5 |
Scheduled Lock Closure, Lock 27 Main Chamber
|
PN 16-04 |
03/03/16 |
185.5 |
Lock Closure, Lock 27 Main Chamber
|
PN 16-03A |
2/25/16 |
185.5 |
Lock 27, Main and Auxiliary Locks Closure Canceled
|
PN 16-03 |
2/23/16 |
185.5 |
Lock 27, Main and Auxiliary Locks Closure
|
PN 16-02B |
2/29/16 |
273.4 |
ICE RESTRICTIONS Lock and Dam 24 Canceled
|
PN 16-02A |
1/25/16 |
273.4 |
ICE RESTRICTIONS Lock and Dam 24
|
PN 16-02 |
1/19/16 |
273.4 |
ICE RESTRICTIONS Lock and Dam 24
|
PN 16-01 |
1/07/16 |
201.5 |
SCHEDULED LOCK CLOSURE Mel Price Auxiliary Lock Chamber
|
PN 15-22A |
1/04/16 |
185.5 |
Lock 27 Main Chamber Re-Opened
|
PN 15-19A |
1/04/16 |
185.5 |
Lock 27 Aux Re-Opened
|
PN 15-20A |
1/04/16 |
201.5 |
Mel Price Aux Re-Opened
|
PN 15-24A |
12/31/15 |
273.2 |
HIHIGH WATER LOCK CLOSURE - CANCELLED Lock and Dam 24
|
PN 15-23A |
12/31/15 |
241.2 |
HIGH WATER LOCK CLOSURE - CANCELLED Lock and Dam 25
|
PN 15-24 |
12/29/15 |
273.2 |
HIGH WATER LOCK CLOSURE Lock and Dam 24
|
PN 15-23 |
12/29/15 |
241.2 |
HIGH WATER LOCK CLOSURE Lock and Dam 25
|
PN 15-22 |
12/29/15 |
185.5 |
HIGH WATER LOCK CLOSURE LOCKS 27 MAIN CHAMBER
|
PN 15-21 |
12/28/15 |
0.8 |
HIGH WATER LOCK CLOSURE Jerry Costello Lock and Dam
|
PN 15-20 |
12/27/15 |
201.5 |
HIGH WATER LOCK CLOSURE Mel Price Auxiliary Lock Chamber
|
PN 15-19 |
12/27/15 |
185.5 |
HIGH WATER LOCK CLOSURE Locks 27 Auxiliary Lock
|
PN 15-18 |
12/10/15 |
185.5 |
SCHEDULED LOCK CLOSURE Locks 27, Main Chamber Upper Mississippi River, Mile 185.5
|
PN 15-17 |
12/08/15 |
185.5
|
Scheduled lock closure locks 27 auxiliary chamber upper mississippi river, mile 185.5
|
PN 15-16 |
11/24/15 |
30-26 |
Inland Electronic Navigation Chart Update Sailing Line Adjustment (See Link)
|
PN 15-15 |
11/19/15 |
185.5 |
SCHEDULED LOCK CLOSURE MAIN CHAMBER, LOCKS 27
|
PN 15-14A |
11/17/15 |
46-38 |
Rock Removal dredging - Postponed
|
PN 15-14 |
11/06/15 |
46-38 |
Rock Removal dredging
|
PN 15-13 |
10/28/15 |
185.5 |
SCHEDULED LOCK CLOSURE AUXILIARY LOCK, LOCKS 27
|
PN 15-12 |
10/26/15 |
185.5 |
SCHEDULED LOCK CLOSURE AUXILIARY LOCK, LOCKS 27
|
PN 15-11a |
9/29/15 |
185.5 |
SCHEDULED LOCK CLOSURE AUXILIARY LOCK, LOCKS 27
|
PN 15-11 |
9/24/15 |
185.5 |
SCHEDULED LOCK CLOSURE AUXILIARY LOCK, LOCKS 27
|
PN 15-10 |
8/21/15 |
241.2 |
Rip Rap Installment Lock & Dam 25 Spillway
|
PN 15-3B |
8/3/15 |
200.8 |
Schedule Closure Mel Price wire rope inspection
|
PN 15-2A |
7/29/15 |
Lock 27 - RM194.2 |
Revetment Maintenance
|
PN 15-5A |
7/29/15 |
Lock 27 |
High Water Lock Closure-Aux Lock 27 Cancelled
|
PN 15-9 |
7/14/15 |
Lock 27 |
SCHEDULED LOCK CLOSURE
|
PN 15-8A |
7/14/15 |
Kaskia |
HIGH WATER LOCK CLOSURE - CANCELLED
|
PN 15-8 |
7/13/15 |
Kaskia |
High water lock closure |
PN 15-4A |
7/9/15 |
Kaskia |
High water lock closure - cancelled |
PN 15-7A |
6/30/15 |
241.2 |
High water lock closure - LD 25 - Cancelled |
PN 15-7 |
6/29/15 |
241.2 |
High water lock closure - LD 25 |
PN 15-6A |
6/30/15 |
273.2 |
High water lock closure - Lock 24 - Cancelled |
PN 15-6 |
6/29/15 |
273.2 |
High water lock closure - Lock 24 |
PN 15-5 |
6/18/15 |
185.1 |
High water lock closure - Lock 27, Auxiliary Lock, mile 185.1 UMR |
PN 15-4 |
6/17/15 |
Kaskia |
High water lock closure - Jerry Costello Lock and Dam |
PN 15-3 A |
6/8/15 |
200.8 |
POSTPONED SCHEDULED LOCK CLOSURE Mel Price Locks and Dam |
PN 15-3 |
5/26/15 |
200.8 |
SCHEDULED LOCK CLOSURE Mel Price Locks and Dam |
PN 15-2 |
4/7/15 |
185.5 |
SCHEDULED CLOSURES LOCK 27 - MAIN LOCK
|
PN 15-1 |
3/30/15 |
51.9 |
GEOTECHNICAL BORINGS at Cape Girardeau, MO Click Here for Photo of Work Area
|
PN 14-12 rev A |
3/24/15 |
Mel Price |
Locks 27 Closures |
PN 14-14 rev F |
2/18/15 |
Mel Price |
SCHEDULE CLOSURES to MAIN LOCK Locks 27 (UMR 185.5) |
PN 14-14 rev E |
2/17/15 |
Mel Price |
SCHEDULE CLOSURES to MAIN LOCK Locks 27 (UMR 185.5) |
PN 14-14 rev D |
2/4/15 |
Mel Price |
SCHEDULE CLOSURES to MAIN LOCK Locks 27 (UMR 185.5) |
PN 14-14 rev C |
2/2/15 |
Mel Price |
SCHEDULE CLOSURES to MAIN LOCK Locks 27 (UMR 185.5) |
PN 14-14 rev B |
1/29/15 |
Mel Price |
SCHEDULE CLOSURES to MAIN LOCK Locks 27 (UMR 185.5) |
PN 14-14 rev A |
1/5/15 |
Mel Price |
Locks 27 (UMR 185.5) - Scheduled Closures to the Main Lock
|
PN 14-14 |
12/30/14 |
Mel Price |
Locks 27 (UMR 185.5) - Scheduled Closures to the Main Lock |
PN 14-13 |
12/04/14 |
Mel Price |
Auxiliary Lock Closure |
PN 14-121a |
11/16/14 |
Mel Price |
Mel Price Main Lock Closure Delayed |
PN 14-12 |
11/6/14 |
Lock 27 |
Lock 27 Scheduled Closures |
PN 14-11 |
11/6/14 |
Mel Price |
Mel Price Main Lock Clousure |
PN 14-10 |
10/15/14 |
Mel Price |
Mel Price Aux Lock Dredging Closure |
PN 14-09 |
10/2/14 |
Lock 27 |
Lock 27 Aux Chamber High Water Closure |
PN 14-08a |
9/25/14 |
Lock 27 |
Lock 27 Aux Chamber Reopen |
PN 14-08 |
9/12/14 |
Lock 27 |
Lock 27 Aux Chamber High Water Closure |
PN 14-07 |
9/3/14 |
Lock 27 |
Lock 27 Aux Chamber High Water Closure |
PN 14-06 |
8/8/14 |
Lock 27 |
Lock 27 Aux Chamber Width Restriction |
PN 14-05 |
4/29/14 |
Lock 27 |
Lock 27 Aux Chamber High Water Closure |
PN 14-04 |
4/4/14 |
Lock 27 |
Lock 27 Closure |
PN 14-03 |
2/5/14 |
Lock 27 |
Width Restriction |
PN 14-02 A |
1/13/14 |
Lock 27 |
Width Restriction |
PN 14-02 |
1/8/14 |
Lock 27 |
Width Restriction |
PN 14-01 |
12/17/13 |
Lock 27 |
Walkway Bridge |
PN 13-11 |
9/26/13 |
Mel Price |
Weir Degradation |
PN 13-10 A |
9/25/13 |
Mel Price |
Auxiliary Lock Dredging |
PN 13-10 |
9/20/13 |
Mel Price |
Mel Price Lock and Dam Auxiliary Lock Dredging |
PN 13-09 |
9/20/13 |
184 |
Upper Mississippi River Mile 184 |
PN 13-05 A |
8/5/13 |
Lock 27 |
Lock 27 Auxiliary Closure |
PN 13-08 |
8/5/13 |
Mel Price |
Mel Price Lock and Dam |
PN 13-07 |
8/1/13 |
222.4 |
Dike 222.4 (R) |
PN 13-06 A (Revised) |
6/24/13 |
Lock 27 |
LOCKS 27 Assist Vessel Requirement Suspended |
PN 13-04 |
6/14/13 |
Kaskaskia |
Kaskaskia River Lock and Dam, IL- Now Re-opened after flooding |
PN 13-06 |
6/14/13 |
185.5 |
Lock 27 Assist Vessel |
PN 13-05 |
4/11/13 |
185.5 |
Lock 27 |
PN 13-04 |
4/4/13 |
185.5 |
Lock 25 Approach (PDF Document) (March 2013 Survey) |
PN 13-03 |
3/6/13 |
185.5 |
Lock 27 Drilling |
PN 13-02 |
3/1/13 |
185.5 |
Lock 27 MainOpen |
PN 13-01 Revised |
01/04/13 |
185.0 |
Lock 27 Dredging |
PN 13-01 |
01/04/13 |
185.0 |
Lock 27 Dredging |
PN 12-19 |
12/18/12 |
241.4 |
Locks 25 |
PN 12-18 |
12/18/12 |
179.6 - 2.0 |
Stream Gaging Stations |
PN 12-17 |
11/26/12 |
164.0 |
REMNANT DIKE AND WEIR MAINTENANCE |
PN 12-16 |
10/23/12 |
185.5 |
Locks 27 |
PN 12-15 |
10/03/12 |
185.5 |
Locks 27 |
IW 12-50 |
12/05/12 |
IL |
TJ O’Brien Lock & Dam, RM 326.5 |
PN 12-17 |
11/27/12 |
164.0 - 5.7 |
Remant Dike and Weir Maintenance |
PN 12-10 REVISED |
10/02/12 |
241.4 |
Lock 25 |
PN 12-10 REVISED |
9/28/12 |
241.4 |
Lock 25 |
PN 12-10 Rev |
9/21/12 |
241.4 |
Lock 25 |
PN 12-14 |
9/15/12 |
185.5 |
Lock 27 |
PN 12-13 |
9/14/12 |
241.4 |
Locks 25 |
PN 12-12 |
9/4/12 |
184 |
Dredging, Upper Mississippi River |
PN 12-11A |
9/4/12 |
46-38 |
Rock Pinnacles |
PN 12-1 |
8/28/2012 |
Kaskaskia |
Kaskaskia Lock and Dam |
PN 12-11 |
8/11/2012 |
43 |
Rock Pinnacles at UMR Miles 43 – 42 (5 Thebes Gage) |
PN 12-10 |
8/9/2012 |
241.4 |
Locks 25, Upper Mississippi River Mile 241.4 |
PN 12-9 |
8/8/2012 |
200.5 |
Mel Price Locks and Dam |
PN 12-8 |
6/14/2012 |
241 |
UMR MILES 241 Lock and Dam 25 |
PN 12-7 Rev A |
8/3/2012 |
185.5 |
Locks 27 |
PN-12-7 |
6/13/2012 |
185.5 |
Locks 27, Upper Mississippi River Mile 185.5 |
PN 12-7 |
6/5/2012 |
241.0 |
UMR MILES 241 Lock and Dam 25 |
PN 12-6 |
6/5/2012 |
200.8 |
Safety Notice to Mariners |
PN 12-5 |
5/1/2012 |
300 to 98.6 |
Construction or Maintenance of River Structures and Revetments |
PN 12-04 |
5/1/2012 |
98.6 TO 0 |
Construction or Maintenance of River Structures and Revetments |
Closure |
2/8/12 |
Mel Price |
Emergency closure at Mel Price L&D due to maintenance.
Barring any further problems, they should be operational by 1500 tomorrow 2/9/12S.
Presently vessels are using self help procedures for locking through the auxiliary chamber.
More Information
|
PN 12-03 |
01/12/12 |
241.4 |
Locks 25 |
PN 12-02 |
01/12/12 |
45 and 97 |
Rock Removal & Weir Construction |
PN 12-1 |
10/26/11 |
185.5 |
Locks 27 |
PN 11-08 |
8/22/11 |
241.4 |
Lock No.25 |
PN 11-07 |
8/22/2011 |
185.5 |
Lock 27, Main Chamber |
PN 11-03 |
5/09/2011 |
Kaskaskia |
Kaskaskia Lock and Dam, IL- Temporary Closure due to Flooding |
PN 11-02 |
4/25/2011 |
Kaskaskia |
Kaskaskia Lock and Dam, IL- Temporary Closure due to Flooding |
PN 11-1 RevC |
3/24/2011 |
Kaskaskia |
Main Lock |
PN 11-5 |
07/03/2011 |
241.4 |
Lock No. 25 |
PN 11-4 |
02/24/2011 |
300.0 - 195.0 |
Construction of River Training Structures |
PN 11-3 Rev A |
02/23/2011 |
241.4 |
Lock 25 |
PN 11-3 |
02/09/2001 |
241.4 |
Lock 25 |
PN 11-1 REV B |
02/10/2011 |
Kaskaskia |
Kaskaskia Main Lock |
PN 11-1 |
02/09/2011 |
241.4 |
Lock 25 |
PN11-1REV A |
02/03/2011 |
Kaskaskia |
Kaskaskia Lock and Dam |
PN 11-1 |
01/12/2011 |
Kaskaskia |
Kaskaskia Lock and Dam |
PN11-1_Rev B |
12/22/2010 |
185.5 |
Locks 27, Main Chamber |
PN11-2 |
12/15/2010 |
195 - 154 |
Construction of river training structures |
PN11-1 Rev A |
12/08/2010 |
185.5 |
Lock 27 Main Chamber Closures |
PN11-1 |
12/08/2010 |
185.5 |
Lock 27 Main Chamber Closures |
PN 10-10 Rev A |
12/08/2010 |
185.5 |
Lock 27 Auxiliary Chamber Closure Extension |
PN 10-12 |
09/07/2010 |
23.0 - 20.0 |
Construction of River Training Structures |
PN 10-11 |
09/01/2010 |
185.5 |
Lock 27 Auxiliary Chamber Closure
|
PN 10-10 |
08/20/2010 |
185.5 |
Lock 27 Main Chamber Closure |
PN 10-09 |
07/12/2010 |
185.5 |
Installation of new Traffic Signals at Lock 27 |
PN 10-05 |
07/04/2010 |
|
Kaskaskia Lock and Dam Re-opening
|
PN10-04 |
06/23/2010 |
|
Temporary Closure of Kaskaskia Lock and Dam |
PN10-09 |
06/18/2010 |
241.4 |
Use Extreme Caution at LD 25 |
PN 10-05 RevC |
06/16/2010 |
185.5 |
Lock 27 main chamber closure delay |
PN10-03 |
05/26/2010 |
|
Kaskaskia Lock and Dam Re-Opening |
PN 10-02 |
05/18/2010 |
|
Temporary Closure of Kaskaskia Lock and Dam |
PN 10-04 RevB |
05/12/2010 |
185.5 |
Lock 27 auxiliary chamber closure |
PN 10-05 RevB |
05/22/2010 |
185.5 |
Lock 2 main chamber closure |
PN 10-08 |
05/12/2010 |
200.8 |
Melprice main chamber closure |
PN 10-07 |
05/03/2010 |
185.5 |
Lock 27, Auxiliary Lock |
PN 10-06 |
04/14/2010 |
200.8 |
Mel Price auxiliary chamber closure |
PN 10-05 RevA |
03/31/2010 |
185.5 |
Lock 27 closure cancelled |
PN 10-05 |
03/17/2010 |
185.5 |
Lock 27 main chamber closure |
PN 10- 04 RevA |
03/31/2010 |
185.5 |
Lock 27 closure cancelled |
PN 10-04 |
03/17/2010 |
185.5 |
Lock 27 auxiliary chamber closure |
PN 10-03 |
03/11/2010 |
105.0 - 90.0 |
Construction of river training structures |
PN 10-02 |
03/11/2010 |
41.0 - 20.0 |
Construction of river training structures |
PN 10-01 |
03/11/2010 |
75.0 - 40.0 |
Construction of river training structures |