LITTLE ROCK, AR - The demolition of the concrete arch spans of the Broadway Bridge in Little Rock has been rescheduled to 8:00 a.m. on October 15. The main navigation channel is scheduled to be closed from 7:30 a.m. – 9:30 a.m.
Published: 10/14/2016
LITTLE ROCK, Ark. - The concrete arch spans of the Broadway Bridge in Little Rock are scheduled to be demolished at 1:00 p.m. on October 14.
Published: 10/13/2016
LITTLE ROCK, Ark. - The U.S. Coast Guard has lifted the closure of the navigation channel.
Published: 10/13/2016