The Savannah Harbor Expansion Study final report is available at our Savannah District site.
Project documents for the Charleston Harbor Post-45 feasibility study are available at our Charleston District site.
The U.S. Army Corps of Engineers has released the Apalachicola-Chattahoochee-Flint (ACF) River basin water control manual and draft Environmental Impact Statement (EIS) for public review.
Everglades Restoration is made up of a wide variety of ecosystem restoration projects which seek to recreate environmental conditions of 100 years ago. More information at our Jacksonville site.