Subscribe
Like us on Facebook
-
Recent Posts
Social Media
Categories
- CSS Georgia
- Declaration/Projection
- Dissolved oxygen
- Drought in the News
- Drought Response
- Fish and Wildlife
- Flood Risk Management
- From the Commander
- Guest Author
- Hydropower
- Navigation
- Rainfall Update
- Recreation
- Savannah Harbor
- SHEP
- Studies
- Uncategorized
- Videos
- Water Management
- Water Quality/Water Supply
- Water Safety
Archives
- October 2016
- September 2016
- August 2016
- July 2016
- June 2016
- May 2016
- April 2016
- March 2016
- February 2016
- January 2016
- December 2015
- November 2015
- October 2015
- September 2015
- August 2015
- July 2015
- June 2015
- May 2015
- April 2015
- March 2015
- February 2015
- January 2015
- December 2014
- November 2014
- October 2014
- September 2014
- August 2014
- July 2014
- June 2014
- May 2014
- April 2014
- March 2014
- February 2014
- January 2014
- December 2013
- November 2013
- October 2013
- September 2013
- August 2013
- July 2013
- June 2013
- May 2013
- April 2013
- March 2013
- February 2013
- January 2013
- December 2012
- November 2012
- August 2012
- July 2012
- May 2012
- February 2012
- October 2011
- September 2011
- August 2011
- May 2011
- January 2011
meta
Tag Archives: Lake Hartwell
Upper Savannah River reservoirs enter Drought Level 2
SAVANNAH, Ga. – The three reservoirs operated by the U.S. Army Corps of Engineers on the upper Savannah River entered Drought Level 2 as of 6 a.m. Sept. 19, when the level of the J. Strom Thurmond Lake dipped to … Continue reading
Posted in Drought in the News, Flood Risk Management, Water Safety
Tagged Army Corps of Engineers, Hartwell Lake, J. Strom Thurmond Lake, Lake Hartwell, Richard B. Russell Lake, Russell Lake, Savannah River, Savannah River Basin, Thurmond Dam, Thurmond Lake, US Army Corps of Engineers, USACE, water safety
Above average August rainfall keeps reservoirs steady
Rainfall in all three reservoir sub-basins exceeded normal in August. While no single event provided the basin with massive runoff, the steady and consistent small rain events kept the reservoirs at a relatively flat level. Leading the charge: Hartwell with … Continue reading
Dams demand best of operator trainees
(Above: Les Rice guides visitors through a quick tour of the J. Strom Thurmond Dam.) AUGUSTA, Ga. – J. Strom Thurmond Dam currently operates at 98 percent proficiency but its operators are expected to perform above this percentage. Operator Trainee … Continue reading
Posted in Hydropower, Videos, Water Management
Tagged Army Corps of Engineers, Hartwell Dam, Hartwell Lake, J. Strom Thurmond Lake, Lake Hartwell, Lake Thurmond, Richard B. Russell Lake, Savannah District, Savannah River Basin, Thurmond Dam, Thurmond Lake, US Army Corps of Engineers, US Army Corps of Engineers Savannah District, USACE
Upper Savannah reservoirs enter Drought Level 1
SAVANNAH, Ga. – The three reservoirs on the Savannah River operated by the U.S. Army Corps of Engineers entered the first drought level today when pool elevation at Thurmond Lake dipped below 326 feet above mean sea level (ft-msl). Entering … Continue reading
Posted in Declaration/Projection, Drought in the News, Drought Response, Studies, Water Quality/Water Supply
Tagged Army Corps of Engineers, comprehensive study, declaration, Environmental Assessment, Hartwell Dam, Hartwell Lake, J. Strom Thurmond Lake, Lake Hartwell, lake levels, Lake Thurmond, outflows, projection, Richard B. Russell Lake, Russell Dam, Russell Lake, Savannah District, Savannah River, studies, Thurmond Lake, US Army Corps of Engineers, USACE, water management, water quality
Commander: Persistent, below normal rainfall expected to impact lake levels
Since I took command of the Savannah District in June 2015 we’ve been fortunate to have adequate, and sometimes abundant, rainfall and inflows to maintain full reservoir levels. Beginning in January we observed below-average rainfall throughout the basin, yet were … Continue reading
Posted in Declaration/Projection, Drought in the News, Drought Response, From the Commander, Studies, Water Management, Water Quality/Water Supply
Tagged Army Corps of Engineers, comprehensive study, drought, Environmental Assessment, Hartwell Dam, Hartwell Lake, hydropower, J. Strom Thurmond Lake, Lake Hartwell, lake levels, Lake Thurmond, projection, Richard B. Russell Lake, Russell Dam, Russell Lake, Savannah District, South Carolina, study, US Army Corps of Engineers, USACE, water quality
A tale of the toothless El Niño?
I’m not one to taunt El Niño, especially in a season where forecasters have consistently predicted a strong showing, but two months of below-average rainfall have brought to mind the old lady from the 1980s Wendy’s commercial who asks, “Where’s the … Continue reading
When it comes to rainfall, 5 feet is no small feat
The Savannah River Basin rang in the new year with a bang, but instead of watching the ball (or peach) drop, it basked in the El Niño-inspired, recording-breaking precipitation. Thurmond led all revelers with its 11.1 inches in December, which … Continue reading
Lakes prepare for busy summer
As the temperatures rise and summer shifts into full gear, the recreation areas along the Savannah River Basin are, too.