Review: System Verification Review (SVR)
Purpose:
An audit trail from the current functional baseline that assesses system functionality and determines if it meets functional requirements.
Timing: Often conducted concurrently with PRR and/or FCA, prior to any production decision.
Entry Criteria:
Evidence indicates the EMD product can satisfy the CDD/draft CPD.
Review: Functional Configuration Audit (FCA)
Purpose:
Review of test/analysis data of each CI (hardware and software) to validate intended function or specification performance.
Timing: Often conducted concurrently with SVR and/or PRR, prior to any production decision.
Entry Criteria:
After EMD test/analysis data available, and evidence EMD product is sufficiently mature for entrance into LRIP.
Review: Production Readiness Review (PRR)
Purpose:
Assesses system's design readiness to begin production, at an acceptable level of risk.
Timing: At completion of Developmental Testing (DT) and following demonstrated acceptable performance in Operational Assessment (supporting AOTR), and prior to MS C Decision.
Entry Criteria:
Manufacturing processes, quality management system, production plans and transition to production risk assessment complete.