17.1 Objective
17.2 Background
17.3 Introduction
17.4 Assessment of Manufacturing Readiness
17.5 Policy and Guidance 17.5.1 Law 17.5.2 Policy 17.5.3 Guidance
17.6 Manufacturing Readiness Definitions 17.6.1 MRL Definitions 17.6.2 MRL Considerations 17.6.3 MRL Threads
17.7 The MRL Matrix
17.8 The MRL Assessment 17.8.1 Determining Initial Scope 17.8.2 Determine the Taxonomy and Schedule 17.8.3 Forming the Team 17.8.4 Orient the Contractors 17.8.5 Request Contractor Self-Assessment 17.8.6 Set Visit Agenda 17.8.7 Conduct the Assessment 17.8.8 Write the Report
17.9 The Manufacturing Maturation Plan
17.10 Contract Language
17.11 Summary
17.12 Related Links and Resources
Top of page