11.1 Objective
11.2 Background
11.3 Introduction 11.3.1 Model T's Transition 11.3.2 V-22 Osprey's Transition
11.4 Transition Process Overview 11.4.1 Acquisition Process and Framework For Transition 11.4.2 Material Solution Analysis (MSA) Phase 11.4.3 Technology Development (TD) Phase 11.4.4 Engineering and Manufacturing Development (EMD) Phase 11.4.5 Production and Deployment (PD) Phase
11.5 DOD 4245.7-M: Transition From Development to Production 11.5.1 Funding and Money Phasing 11.5.2 Design 11.5.3 Test 11.5.4 Production 11.5.5 Facilities 11.5.6 Logistics 11.5.7 Management
11.6 Transition Plan 11.6.1 Technology Development Strategy/Acquisition Strategy 11.6.2 Systems Engineering Plan 11.6.3 Production/Manufacturing Plan
11.7 Transition Challenges 11.7.1 Producibility 11.7.2 Design Maturity 11.7.3 Quality Assurance and Quality Control Planning 11.7.4 Variability Reduction/Continuous Process Improvement 11.7.5 Production Cost Analysis 11.7.6 Production Planning 11.7.7 Production Design Change Introduction
11.8 Transition to Production Tools 11.8.1 Technology Maturity Levels (TRLs) 11.8.2 Manufacturing Readiness Levels (MRLs) 11.8.3 Sustainment (Logistics) Maturity Levels (SMLs) 11.8.4 Producibility Engineering Planning (PEP)
11.9 Prodcution Risk Reduction Strategies 11.9.1 Competitive Prototyping 11.9.2 Pilot Line Production 11.9.3 Initial Low Rate Production (LRIP) 11.9.4 Full Rate Production (FRP)
11.10 Summary
11.11 Related Links and Resources
Top of page