Collapse All Expand All
FY-2016 Review Plans
St. Johns County, Florida Hurricane and Storm Damage Reduction (HSDR) Feasibility Study and Environmental Assessment, Jan 25, 2016
San Juan Harbor Improvement Study, April 1, 2016
C-111 Contract 8A EDR, Review Plan and Approval Memo, March 2, 2016
C-43 Design Package S-476, Feb 10, 2016
Cano Martin Pena Review Plan, April 25, 2016
Duval SPP Review Plan and Approval Memo, April 7, 2016
HHD Gap Reach 1 Gap Closure Review Plan and Approval memo, Jan 15, 2016
HHD Reach 1 Cutoff Wall Extension Review Plan and Approval memo, May 2, 2016
Lake Hicpochee 408 Package Review Plan and Approval memo, May 3, 2016
Miami Dade Hot Spots Review Plan and Approval memo, May 2, 2016
Okeechobee Waterway DMMA O-7 Review Plan and Approval memo, May 3, 2016
S-169 and C-20 Package Review Plan and Approval Memo, Feb 19, 2016
FY-2015 Review Plans
8.5 Square Mile, S-357N, 8 December 2014
Brevard County Mid-Reach Mitigation RP and Approval Memo 03-Apr-2015
Broward County Segment II RP and Approval Memo 3-Apr-2015
C-111 Project Modifications to the C&SF Project Contract 8 Miami-Dade 11-May-2015
C-43 SFWMD Design Package 1 Preloading Demolition 6-Jul-2015_Redacted
C&SF Project, Changes to Structure 190 Operational Criteria, Master Water Control Manual
(Water Conservation Areas, Everglades National Park, and ENP-South Dade Conveyance System)
-Review Plan, 14 Jan 2015
-Approval, 04 Feb 2015
Continuing Authorities Program, South Atlantic Division Programmatic Review Plan, 9 Apr 2015
-Enclosure A, Review Plan Template (MS_Word)
-Enclosure B, IEPR Decision Analysis/Regional CAP Review Plan Applicability Determination (MS_Word)
G-3273 Contraint Relaxation/S-356 and S357N Field Test, October 2014
G-3273 Contraint Relaxation Approval Memo, 24 November 2014
Herbert Hoover Dike 2015 Major Rehabilitation Report Supplement and Environmental Assessment
Herbert Hoover Dike Dam Safety Modification Report and Environmental Assessment, 17 September 2015
Jacksonville Harbor Deepening, PED Documents, 15 December 2014
KRR CNT 12A S-69 Weir RP and Approval Memo, 24-August-2015
Picayune Strand, Approval of RP for Manatee Mitigation Feature, 11 February 2015
Rio Culebrinas, Flood Risk Management, Sec 205, plan and approval 18 Mar 2015
Rio de la Plata, Flood Risk Management, 9 Apr 2015
San Juan Harbor Mitigation, Approval of RP, 02 May 2015
Seminole Big Cypress Basin 3 EDR RP and Approval Memo 3-Apr-2015
St. Johns County, Florida, Coastal Storm Risk Management Project Validation Study, 10 Aug 2015
St. Lucie River Oyster Reef Estuary Habitat Restoration, Phase II, 12 Jan 2015
Upper St. Johns, S252, Deficiencies Report, 24 November 2014
FY-2014 Review Plans
Aquifer Storage and Recovery Regional Study Technical Data Report, 3 Jun 2014
Canaveral Harbor Widening and Deepening, 13 November 2013
Grassy Flats Estuarine Habitat Restoration Project, 17 Jun 2014
Kissimmee River Restoration, LRR, Revised Review Plan, July 2014
Portugues Dam, Approval of Revised RP, 19 May 2014
Sarasota County, Lido Key, 28 Oct 2013
Sarasota County, Venice Beach, 24 June 2014
Seminole Big Cypress Reservation, Water Control Manual, Basins 1, 2, and 4
Seminole Big Cypress Reservation, WCM, Basins 1, 2, and 4 approval, 25 Nov 2013
STA-1E Gates Deficiencies Modification Report, Review Plan, 18 July 2014
FY-2013 Review Plans
Banana River Estuary Restoration Project
Banana River Estuary Restoration Project, Approval Memo, 29 April 2013
Brevard County, North and South Reach, FCCE, 23 August 2013
Broward County, Segment 2, LRR
Broward County, Segment 2, Approval Memo
Broward County (Segment II), Florida FCCE Review Plan
Cano Martin Pena
Cano Martin Pena Approval Memo
Dade County Beach Erosion Control and Hurricane Protection, LRR
Dade County Beach Erosion Control and Hurricane Protection, LRR Approval Memo
Dade County Beach Erosion Control LRR, Revised Review Plan
Dade County Beach Erosion Control, Approval of RP for Periodic Renourishment, 26 November 2012
FCCE Approval of RP, Manatee SP, Gasparilla Island, Lee County, 12 August 2013
FCCE Approval of RP, Jupiter/Carlin, Ocean Ridge, Delray Beach and North Boca of Palm Beach County, 12 August 2013
Fort Pierce Beach Shore Protection Project Review Plan
Indian River Lagoon South (IRLS) C-44 Review Plan 17-DEC-2012
Jacksonville Harbor General Reevaluation Report (GRR2)
Jacksonville Harbor O&M, Dredged Material Management Plan
Kissimmee River Restoration Project, Contract 15A, River Acres Supplemental Work, 25 March 2013
Lake Worth Inlet, Palm Beach Harbor, Feasibility Study
Lake Worth Inlet, Palm Beach Harbor, Approval Memo
Lower Hillsborough and Tampa Bypass Canal Master Water Control Manual
Lower Hillsborough and Tampa Bypass Canal MWCP Approval Memo
Manatee County LRR
Manatee County LRR Approval Memo
Modified Water Deliveries, Letter Report to Assess Competion Satus
Modified Water Deliveries, Letter Report Approval Memo, 12 April 2013
Palm Beach County, Jupiter Carlin, Section 934 Study
Palm Beach County, Jupiter Carlin Approval Memo
Palm Beach County, Ocean Ridge LRR
Palm Beach County, Ocean Ridge Approval Memo
Picayune Strand PAC LRR
Picayune Strand Approval Memo
Pinellas and Lee County Hurricane and Storm Damage Reduction Review Plans, 13 June 2013
Port Everglades Feasibility Study Review Plan Second Update, 23 Jan 2012
Programmatic Review Plan for Routine O&M Products
Rio Puerto Nuevo, PR, Review Plan, 14 December 2012
Rio Grande de Arecibo, Post Authorization Change Report
Rio Grande de Arecibo, PACR, Approval Memo, 2 May 2013
Rio Puerto Nuevo, Post Authorization Change Report
Rio Puerto Nuevo, PAC, Approval Memo, 17 May 2013
San Juan Harbor LRR, Mitigation
San Juan Harbor LRR, Review Plan Approval, 30 May 2013
Seminole Big Cypress Reservation, Water Control Plan and EA, 1 Oct 12
Seminole Big Cypress Reservation, Water Control Plan, Approval Memo
Stormwater Treatment Area STA 1E (C&SF: West Palm Beach Canal C-51) Letter Report
Stormwater Treatment Area STA 1E Approval Memo, 8 Apr 2013
Stormwater Treatment Area STA 1E, RP for Everglades Restoration Strategies, L-8 Flow and S-375 Expansion, 8 May 2013
FY-2012 Review Plans
Broward County Water Preserve Area
Broward County Water Preserve Area Approval Memo
C-111 South Dade, Contract 8, 9 Jan 2012
Canaveral Harbor Sec 203
Canaveral Harbor Sec 203 Approval Memo
Cedar Hammock (Wares Creek), 30 April 2012
Central Everglades Planning Project
Central Everglades Planning Project Approval Memo
Dade County SMART Structures
Everglades Restoration Transition Plan, Revisions to Water Control Plan (ENP) and EIS
Herbert Hoover Dike, Design and Construction, 2nd Revision, 10 May 2012
Herbert Hoover Dike, Pilot Test Letter Report, Plans and Specs, 23 April 2012
Jacksonville Harbor, Mile Point, PED Phase, 27 July 2012
Kissimmee River Restoration, Contract 10, PED Phase
Lake Okeechobee Aquifer Storage and Recovery (ASR) Pilot Project Review Plan, 19 March 2012
Martin County Shore Protection, Periodic Renourishment Implementation Docs, 19 March 2012
Sarasota County, Venice Beach, LRR
Southwest Florida Feasibility Study, 16 Nov 2011
STA-1E, PSTA Decommissioning Project and EA, Dec 2011
Tarpon Springs, Whitcomb and Kreamer Bayous, CAP 103, 9 January 2012
Upper St. Johns River Three Forks Marsh Conservation Review Plan, 21 May 2012
Water Control Area 3 Decompartmentalization Physical Model Approval
FY-2011 Review Plans
8.5 Square Mile Area Project, Interim Operating Criteria and EA, 24 June 2011
Big Fishweir Creek, CAP Section 206
Duval County Beach Erosion Control, Periodic Renourishment Implementation Docs, 9 November 2010
Everglades Restoration Plan
Ft. Pierce Beach Shore Protection, Implementation Documents, 1 June 2011
Kissimmee River Restoration Project, Contract 12, S-65EX1 Structure, Intermediate Phase, P&S and DDR, 30 August 2011
Kissimmee River Restoration, C-38 Reach 3 Backfill and Bass Levee Degrade, PED
Kissimmee River Restoration, Limited Reevaluation Report (LRR)
Martin County Shore Protection Review Plan
Martin County Shore Protection Review Plan Approval
Martin County Shore Protection Type 1 IEPR Exclusion
Miami Harbor Deepening & Widening (PhaseIII), 15 August 2011
Picayune Strand Restoration, Design and Construction Phases, 8 August 2011
Pinellas County, Beach Erosion Control, 17 May 2011
Regional O&M Review Plan
Seminole Big Cypress Reservation, Interim Water Control Plan and EA
St. Johns County Shore Protection, Periodic Renourishment Implementation Documents
STA-1E Modifications, Culverts and Trash Rake Systems, Decision Doument
STA-1E Modifications, Culverts and Trash Rake Systems, 18 August 2011
STA-1E Modifications, Culverts and Trash Rake Systems, Review Plan Approval
STA-1E Modifications, Culverts and Trash Rake Systems, IEPR Exclusion
Tampa Harbor GRR
Tampa Harbor Dredged Material Management Plan, 2010-2030 Update
FY-2010 Review Plans
Broward County, Segment 1, Shore Protection
Flagler County Shore Protection Feasibility Study
Kissimmee River Restoration Post-Authorization Change, LRR
Port Everglades Feasibility Study, May 2010 Update
Rio de la Plata, Flood Control
St. Johns County Feasibility Study, May 2010 Update
WCA 3A Decompartmentalization
Site 1 Impoundment - Fran Reich Preserve Review Plan, 4 Feb 2010
FY-2009 Review Plans
Biscayne Bay Coastal Wetlands
C-111 Spreader Canal
Ft. Pierce, St. Lucie County, Shore Protection, GRR
St. Lucie Hurricane and Storm Damage Reduction Feasibility Study and EIS
FY-2008 Review Plans
Brevard County Shore Protection Mid Reach GRR
Flagler County Hurricane and Storm Damage Reduction, Feasibility 17 Mar 2008
Indian River Lagoon North (IRL-N) Feasibility Study
Jacksonville Harbor GRR, Phase 2
Jacksonville Harbor, Mile Point Feasibility Study
Port Everglades Feasibility Study
St. Johns County Feasibility Study
|