NEW ENGLAND DISTRICT
About
Mission
History
Leadership
Speaker's Bureau
Business With Us
Contracting
Small Business
Federal Business Opportunities
Missions
Civil Works
Navigation
Flood Risk Management
Shore Bank Protection
Connecticut
Maine
Massachusetts
New Hamsphire
Rhode Island
Vermont
Public Notices
Military Programs
Projects/Topics
Fox Point Hurricane Barrier
Cape Cod Canal-Town Neck Beach EA
Tennessee Gas Pipeline
Haverhill Local Protection Project Modification Dr
Woonsocket Flood Risk Management Program
Pawcatuck River CSRM Feasibility Study
Recreation
Connecticut
Massachusetts
New Hampshire
Vermont
Regulatory
Public Notices
Permits Issued
State General Permits
Jurisdictional Limits
Mitigation
Invasive Species
Dredged Material Program
Stream and River Continuity
Naturalized River Restoration
Vernal Pools
Useful Documents, Forms and Publications
Useful Links and Regulations
WRDA214
Navigation
Public Notices
Connecticut Projects
Maine Projects
Massachusetts Projects
New Hampshire Projects
New York Projects
Rhode Island Projects
Public Services
Continuing Authorities Program
Ecosystem Restoration Authorities
Flood Plain Management Services
Planning Assistance to States
Project Partnership Agreements
Emergency Operations
Disposal Area Monitoring System (DAMOS)
Reservoir Control Center
Careers
Employee Information
Media
News Releases
State Update Reports
Images
Yankee Engineer
2015
Yankee Engineer
Library
Contact
USACE Office Locator
Speaker's Bureau
Home
>
Missions
>
Projects/Topics
>
Tennessee Gas Pipeline
Public Notices
NAE-2013-02329
Massachusetts
Draft Environmental Impact Report
Connecticut
DEP Permit Application
Permit Application Transmittal Form
DEP-IWRD Application
DEP-IWRD Application (addendum)
DEP Section 401
Attachment A
Executive Summary
Attachment B
USGS Topo Maps
Attachment C
Permit Documentation
Attachment G
Base
Pipeyard
Access Road
Wetland Site
Erosion Control
Wetland Construction
Attachment H
Access Road Hydrology
Diversion Swales
Access Road Silt Fence
Silt Fence Design
Section 1: Engineer Report
Section 2: Hydraulic & Hydrology Worksheets
Attachment I
Flood Contingency Plan
Attachment J
Soils Scientist Report
Soils & Wetland Report
Attachment K
Environment Assessment
Wetland Report
Vernal Pool Report
Rare Species Report
Terrestrial Invertebrate Report
Freshwater Mussels Report
Rare Plant Report
Attachment L
Wetland Mitigation
Invasive Species Control
Restoration Plan
Photos
Attachment M
Resource Report 10 Alternatives
Attachment N
DEP Applicant Compliance Information
Attachment O
DEP Applicant Background
Attachment Q
Best Practices
FERC Plan
FERC Procedures
Stream Crossing
Agricultural Restrictions
FERC Environmental Assessment | October 2015 (Final)