Houston Ship Channel 45-Foot Expansion Channel Improvement Project (HSC ECIP), Harris and Galveston Counties, Texas
- Notice of Public Scoping Meetings (17 May 2016 and 19 May 2016)
Houston Ship Channel Project Deficency Report (Flare at the Intersection of the Houston Ship Channel and Bayport Ship Channel), Houston-Galveston Navigation Channels, Texas, Draft Report and Environmental Assessment
Sabine Pass to Galveston Bay, Texas, Coastal Storm Risk Management and Ecosystem Restoration Draft Integrated Feasibility Report and Environmental Impact Statement
- Notice of Intent to File an Environmental Impact Statement (EIS); Comments due Dec 24, 2014
- Sabine Pass to Galveston Bay Draft EIS Notice of Availability
- Sabine Pass to Galveston Bay Draft Integrated Main Report and EIS (DIFR-EIS)
- Sabine Pass to Galveston Bay DIFR-EIS, Appendix A, Part 1
- Sabine Pass to Galveston Bay DIFR-EIS,Appendix A, Part 2
- Sabine Pass to Galveston Bay DIFR-EIS,Appendix B
- Sabine Pass to Galveston Bay DIFR-EIS,Appendix C
- Sabine Pass to Galveston Bay DIFR-EIS,Appendix D, Part 1
- Sabine Pass to Galveston Bay DIFR-EIS,Appendix D, Part 2
- Sabine Pass to Galveston Bay DIFR-EIS,Appendix D, Part 3
- Sabine Pass to Galveston Bay DIFR-EIS,Appendix E through G
- Sabine Pass to Galveston Bay DIFR-EIS,Appendix H through M
- Sabine Pass to Galveston Bay DIFR-EIS,Appendix N
- Sabine Pass to Galveston Bay DIFR-EIS,Appendix O through T
- Beaumont Proposed Alignment Map
- Bridge City Proposed Alignment Map
- Freeport Proposed Alignment Map
- Jefferson Proposed Alignment Map
- Orange Proposed Alignment Map
- Port Arthur Proposed Alignment Map
- Public Meeting - Beaumont, Texas - Oct. 6, 2015 (presentation) (transcript)
- Public Meeting - Freeport, Texas - Oct. 8, 2015 (presentation) (transcript)
Cedar Bayou, Texas, Dredged Material Management Plan and Environmental Assessment (Draft CB DMMP/EA)
Hunting Bayou Draft General Reevaluation Report and Integrated Environmental Assessment (Hunting Bayou Draft GRR/EA)
Brazos Island Harbor Channel Improvement Project - Draft Integrated Feasibility Report and Environmental Assessment, Dec 2013
Gulf Intracoastal Waterway - Vicinity of Port O'Connor, Texas, Channel Evaluation
Bayport Ship Channel Improvements Section 408 Analysis and 204(f)Assumption of Maintenance
Additionally, we have made the final Environmental Impact Statement for the PHA's 2004 Bayport ship Channel Container/Cruise Terminal project available for download through the following links:
FEIS (331 MB):
http://go.shoalest.com/BPT_FEIS_Main
http://go.shoalest.com/BPT_FEIS_Backup
The Final Environmental Impact Statement (FEIS) may also be requested on disk due to large file size. Please contact the Port of Houston by e-mail at deepeningportofhouston@poha.com.
Galveston Harbor Channel Extension
Addicks and Barker Dam Safety Project
Alligator Bayou Assessment for Section 408
Corpus Christi Ship Channel Assumption of Maintenance
Clear Creek (October 2012)
Freeport Harbor Channel Improvement Project
Jacintoport Assumption of Maintenance