Collapse All Expand All
- Assateague Island Restoration (December 14, 2012)
- Atlantic Coast NJ Sea Bright to Ocean Twp Elberon to Loach Arbor Reach (November 14, 2014)
- Atlantic Intercoastal Waterway (AIWW) bridge Replacement at Deep Creek, Chesapeake, Virginia (June 7, 2013)
- Ball Mountain Dam, VT Non-Federal Hydroelectic Project (Feb. 20, 2013)
- Ball Mountain Dam, VT Issue Evaluation Study Phase 2 (December 14, 2012)
- Barnegat Inlet to Little Egg Inlet, Long Beach Island, New Jersey (December 14, 2012)
- Bernville Protective Works Levee Safety Evaluation Report, Bernville, PA (Sep. 30, 2013)
- Brigantine Inlet to Great Egg Harbor Inlet, Absecon, New Jersey (July 30, 2013)
- Brigantine Inlet to Great Egg Inlet, Brigantine, NJ (July 30, 2013)
- Burlington Bollards Removal, Lake Champlain, VT (30 Jul 12)
- CAP Project, Section 209, Plumb Beach, NY (19 Oct 12)
- Cape Henlopen to Fenwick Island, Rehoboth Beach to Dewey Beach, Delaware (Aug. 5, 2013)
- Cape Henlopen to Fenwick Island, Bethany Beach to South Bethany, Delaware (Aug. 5, 2013)
- Cape May Inlet to Lower Township, Cape May, New Jersey (December 14, 2012)
- Cowanesque Lake Regulation Manual (Oct. 20, 2014)
- Delaware Bay Coastline, Roosevelt Inlet-Lewes Beach, DE (December 14, 2012)
- Delaware River Main Channel Deepening Project, Pennsylvania, New Jersey and Delaware (December 14, 2012)
- Edward MacDowell Lake Dam, New Hampshire Issue Evaluation Study Phase I (December 14, 2012)
- Elberon to Loch Arbour, Sandy Hook to Barnegat Inlet Beach Erosion Control Project (Nov. 14, 2014)
- Fire Island Inlet to Montauk Point, Contract 1 (Nov. 18, 2013)
- Fire Island Inlet to Montauk Point (Aug. 08, 2014)
- Fire Island Inlet to Montauk Point, Downtown Montauk Stabilization Project (Nov. 14, 2014)
- Foster Joseph Sayers Dam, PA, Howard Protective Works (May 31, 2013)
- Gathright Dam Reservoir Regulation Review Plan (May 26, 2016)
- Great Egg Harbor Inlet to Peck Beach, Ocean City, New Jersey (December 14, 2012)
- Green Brook Flood Risk Management Project Segments U, R2, T, and B- (Sept. 2013)
- Green Brook FRM Project, Borough of Bound Brook Levee System Evaluation Report (05 Oct 12)
- Hammond Dam Issue Evaluation Study (10 May 13)
- Hop Brook Dam, Connecticut Issue evaluation Study Phase I (December 14, 2012)
- Jadwin Dam Issue Evaluation Study (July 6, 2016)
- Long Beach Island Coastal Storm Risk Management Project (May 27, 2015)
- Lower Cape May Meadows, Cape May Point, New Jersey (December 14, 2012)
- Minish Passaic River Waterfront Park and Historic Area, Phase 1 (Nov. 14, 2014)
- Muddy River Flood Risk Management and Environmental Restoration Project, Boston and Brookline, Massachusetts (December 14, 2012)
- New England District Procedural Review Plan (June 5, 2015)
- New York and New Jersey Harbor Deepening Project (December 14, 2012)
- Poplar Island Ecosystem Restoration Project, Talbot County, Maryland (December 5, 2012)
- Poplar Island Expansion Design Documentation Report (October 20, 2014)
- Prince George's County Levee System, Prince George's County, Maryland (July 3, 2013)
- Raritan Bay and Sandy Hook Bay, NJ, Hurricane & Storm Damage Reduction, Port Monmouth, NJ (26 Apr 13)
- Raritan Bay and Sandy Hook Bay NJ Port Monmouth Phase (June 18, 2015)
- Rockaway Inlet to Norton Point, Coney Island, NY (July 30, 2012)
- The Atlantic Coast of NYC, Rockaway Inlet to Norton Point (Coney Island), NY (30 Jul 12)
- Union Village Lake Dam, VT Issue Evaluation Study Phase I (December 14, 2012)
- Washington DC Local Flood Protection Project (December 14, 2012)
- Willoughby Spit and Vicinity Coastal Storm Damage Reduction Project (March 11, 2015)
Routine O&M Review Plan-
Routine O&M Review Plan applies to the following projects:
- ALMOND LAKE, NY
- ALVIN R BUSH DAM, PA
- APPOMATTOX RIVER, VA
- ARKPORT DAM, NY
- ATLANTIC INTRACOASTAL WATERWAY - ACC, VA
- ATLANTIC INTRACOASTAL WATERWAY - DSC, VA
- ATLANTIC INTRACOASTAL WATERWAY - DSC, VA
- AYLESWORTH CREEK LAKE, PA
- BALL MOUNTAIN, VT
- BALTIMORE HARBOR, MD (DRIFT REMOVAL)
- BARNEGAT INLET, NJ
- BARRE FALLS DAM, MA
- BAY RIDGE AND RED HOOK CHANNELS, NY
- BELTZVILLE LAKE, PA
- BIRCH HILL DAM, MA
- BLACK ROCK LAKE, CT
- BLACKWATER DAM, NH
- BLUE MARSH LAKE, PA
- BUFFUMVILLE LAKE, MA
- BUTTERMILK CHANNEL, NY
- CAPE COD CANAL, MA
- CHARLES RIVER NATURAL VALLEY STORAGE AREA, MA
- CHINCOTEAGUE INLET, VA
- COLD SPRING INLET, NJ
- COLEBROOK RIVER LAKE, CT
- CONANT BROOK LAKE, MA
- COWANESQUE LAKE, PA
- CUMBERLAND, MD AND RIDGELEY, WV
- CURWENSVILLE LAKE, PA
- DELAWARE RIVER AT CAMDEN, NJ
- DELAWARE RIVER, PHILADELPHIA TO THE SEA, NJ, PA & DE
- DELAWARE RIVER, PHILADELPHIA, PA TO TRENTON, NJ
- DISPOSAL AREA MONITORING, ME
- EAST BRIMFIELD LAKE, MA
- EAST RIVER, NY
- EAST ROCKAWAY INLET, NY
- EAST SIDNEY LAKE, NY
- EDWARD MACDOWELL LAKE, NH
- FLUSHING BAY AND CREEK, NY
- FOSTER JOSEPH SAYERS DAM, PA
- FOX POINT BARRIER, NARRANGANSETT BAY, RI
- FRANCIS E WALTER DAM, PA
- FRANKLIN FALLS DAM, NH
- GATHRIGHT DAM AND LAKE MOOMAW, VA
- GENERAL EDGAR JADWIN DAM AND RESERVOIR, PA
- GREAT SALT POND, BLOCK ISLAND, RI
- HAMPTON ROADS, NORFOLK & NEWPORT NEWS HARBOR, VA (DRIFT REMOVAL)
- HAMPTON ROADS, VA (PREVENTION OF OBSTRUCTIVE DEPOSITS)
- HANCOCK BROOK LAKE, CT
- HODGES VILLAGE DAM, MA
- HOP BROOK LAKE, CT
- HOPKINTON - EVERETT LAKES, NH
- HUDSON RIVER, NY (MAINT)
- HUDSON RIVER, NY (O & C)
- INSPECTION OF COMPLETED WORKS, CT
- INSPECTION OF COMPLETED WORKS, CT
- INSPECTION OF COMPLETED WORKS, DC
- INSPECTION OF COMPLETED WORKS, DE
- INSPECTION OF COMPLETED WORKS, MA
- INSPECTION OF COMPLETED WORKS, MD
- INSPECTION OF COMPLETED WORKS, ME
- INSPECTION OF COMPLETED WORKS, NH
- INSPECTION OF COMPLETED WORKS, NJ
- INSPECTION OF COMPLETED WORKS, NJ
- INSPECTION OF COMPLETED WORKS, NY
- INSPECTION OF COMPLETED WORKS, NY
- INSPECTION OF COMPLETED WORKS, NY
- INSPECTION OF COMPLETED WORKS, PA
- INSPECTION OF COMPLETED WORKS, PA
- INSPECTION OF COMPLETED WORKS, RI
- INSPECTION OF COMPLETED WORKS, VA
- INSPECTION OF COMPLETED WORKS, VA
- INSPECTION OF COMPLETED WORKS, VT
- INSPECTION OF COMPLETED WORKS, VT
- INSPECTION OF COMPLETED WORKS, WV
- INTRACOASTAL WATERWAY, DELAWARE RIVER TO CHESAPEAKE BAY, DE & MD
- JAMAICA BAY, NY
- JAMES RIVER CHANNEL, VA
- JENNINGS RANDOLPH LAKE, MD & WV
- KNIGHTVILLE DAM, MA
- LITTLEVILLE LAKE, MA
- LYNNHAVEN INLET, VA
- MANASQUAN RIVER, NJ
- MANSFIELD HOLLOW LAKE, CT
- NARROWS OF LAKE CHAMPLAIN, VT & NY
- NEW BEDFORD FAIRHAVEN AND ACUSHNET HURRICANE BARRIER, MA
- NEW YORK AND NEW JERSEY CHANNELS, NY
- NEW YORK HARBOR, NY
- NEW YORK HARBOR, NY & NJ (DRIFT REMOVAL)
- NEW YORK HARBOR, NY (PREVENTION OF OBSTRUCTIVE DEPOSITS)
- NEWARK BAY, HACKENSACK AND PASSAIC RIVERS, NJ
- NORFOLK HARBOR, VA
- NORTH HARTLAND LAKE, VT
- NORTH SPRINGFIELD LAKE, VT
- NORTHFIELD BROOK LAKE, CT
- OTTER BROOK LAKE, NH
- PASSAIC RIVER FLOOD WARNING SYSTEMS, NJ
- PORTLAND HARBOR, ME
- POTOMAC AND ANACOSTIA RIVERS, DC (DRIFT REMOVAL)
- PROJECT CONDITION SURVEYS, CT
- PROJECT CONDITION SURVEYS, DC
- PROJECT CONDITION SURVEYS, DE
- PROJECT CONDITION SURVEYS, DE
- PROJECT CONDITION SURVEYS, MA
- PROJECT CONDITION SURVEYS, MD
- PROJECT CONDITION SURVEYS, ME
- PROJECT CONDITION SURVEYS, NH
- PROJECT CONDITION SURVEYS, NJ
- PROJECT CONDITION SURVEYS, NJ
- PROJECT CONDITION SURVEYS, NY
- PROJECT CONDITION SURVEYS, PA
- PROJECT CONDITION SURVEYS, RI
- PROJECT CONDITION SURVEYS, VA
- PROJECT CONDITION SURVEYS, VA
- PROMPTON LAKE, PA
- RARITAN RIVER TO ARTHUR KILL CUT-OFF, NJ
- RARITAN RIVER, NJ
- RAYSTOWN LAKE, PA
- RUDEE INLET, VA
- SALEM RIVER, NJ
- SCHEDULING RESERVOIR OPERATIONS, MD
- SCHEDULING RESERVOIR OPERATIONS, PA
- SCHUYLKILL RIVER, PA
- SHARK RIVER, NJ
- SOUTHERN NEW YORK FLOOD CONTROL PROJECTS, NY
- STAMFORD HURRICANE BARRIER, CT
- STILLWATER LAKE, PA
- SURRY MOUNTAIN LAKE, NH
- SURVEILLANCE OF NORTHERN BOUNDARY WATERS, ME
- THOMASTON DAM, CT
- TIOGA - HAMMOND LAKES, PA
- TOWNSHEND LAKE, VT
- TULLY LAKE, MA
- TYLERS BEACH, VA
- UNION VILLAGE DAM, VT
- WASHINGTON HARBOR, DC
- WATER/ENVIRONMENTAL CERTIFICATION, VA
- WATERWAY ON THE COAST OF VIRGINA, VA
- WEST HILL DAM, MA
- WEST THOMPSON LAKE, CT
- WESTVILLE LAKE, MA
- WHITNEY POINT LAKE, NY
- WICOMICO RIVER, MD
- WILMINGTON HARBOR, DE
- WOONSOCKET, RI
- YORK INDIAN ROCK DAM, PA
Non-Routine O&M Review Plans
Baltimore Harbor and Channels, Maryland and Virginia Dredged Material Management Plan (December 14, 2012)
Long Island Sound Dredged Material Management Plan, Connecticut and New York (February 20, 2015)
Townshend Dam, Townshend, Vermont, Non-Federal Hydroelectric Project (December 14, 2012)
- Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, New York (December 11, 2012)
- Baltimore Harbor and Channels 50 Foot Project, Maryland and Virginia General Reevaluation Report (March 13, 2015)
- Blackstone River at Cumberland, Rhode Island Flood Risk Management Feasibility Study (December 11, 2012)
- Boston Harbor, Boston, Chelsea and Revere, Massachusetts (December 14, 2012)
- Bronx River Basin Ecosystem Restoration, New York (December 14, 2012)
- Byram River Basin, Westchester County Streams, Connecticut and New York Feasibility Study (July 31, 2012)
- Chesapeake Bay Comprehensive Water Resources and Restoration Plan Watershed Assessment (September 15, 2016)
- Chesapeake Bay Native Oyster Recovery Master Plan (January 2012)
- Chesapeake Bay Shoreline Erosion (December 5, 2012)
- Chowan County, North Carolina Potential Aquatic Ecosystem Restoration Feasibility Study (December 14, 2012)
- City of Norfolk Coastal Storm Risk Management Feasibility Study - Review Plan (October 3, 2016)
- Connecticut River Ecosystem Restoration, Connecticut, Massachusetts, New Hampshire and Vermont Watershed Study (January 2012)
- Curwensville Lake, Clearfield County, Pennsylvania, Modification to Water Release Operation Plan Letter Report (September 10, 2016)
- Delaware River Basin Comprehensive- Interim Feasibility Study for New Jersey (December 14, 2012)
- Delaware Beneficial Use of Dredged Material for the Delaware River Feasibility Study (July 1, 2013)
- Delaware Bay Coastline, Delaware and NJ, Broadkill Beach, Delaware Limited Reevaluation Report (March 11, 2015)
- Fire Island Inlet to Montauk Point, Long Island, New York Reformulation Study (December 11, 2012)
- Forge River Watershed, Suffolk County, New York Feasibility Report (December 14, 2012)
- Hashamomuck Cove, New York Feasibility Report (May 23, 2014)
- Hereford Inlet to Cape May Inlet (December 14, 2012)
- Highlands, Raritan and Sandy Hook Bays, New Jersey (December 11, 2012)
- Hudson-Raritan Estuary Lower Passaic River, New Jersey (December 14, 2012)
- Hudson-Raritan Estuary Ecosystem Restoration (December 14, 2012)
- Hurricane Sandy Limited Reevaluation Reports, Regional Review Plan (September 2013)
- Jamaica Bay, Marine Park and Plumb Beach, New York (December 14, 2012)
- Lake Montauk Harbor, New York (July 2, 2014)
- Lower Saddle River and Sprout Brook, Bergen County, New Jersey (December 14, 2012)
- Lower Susquehanna River Watershed Assessment (December 5, 2012)
- Lynnhaven River Ecosystem Restoration, Virginia Beach, VA (December 11, 2012)
- Mamaroneck and Shelldrake Rivers Basin, Village of Mamaroneck, Westchester County, New York (December 14, 2012)
- Merrimack River, Massachusetts and New Hampshire Section 729 Watershed Assessment (December 5, 2012)
- Middle Potomac River Watershed Assessment, Potomac River Sustainable Flow and Water Resources Analysis Maryland, Virginia, Pennsylvania, West Virginia, and the District of Columbia (December 5, 2012)
- Millstone River Basin, New Jersey, Flood Risk Management Feasibility Study (December 14, 2012)
- Montgomery County, Anacostia Watershed Restoration, Maryland Study, Ecosystem Restoration Feasibility Study (December 14, 2012)
- NAD Regional Continuing Authorities Program Review Plan (December 14, 2012)
- New Jersey Alternative Long-Term Nourishment Feasibility Study (December 14, 2012)
- New Jersey Back Bays Coastal Storm Risk Management Feasibility Study Review Plan (September 20, 2016)
- New Jersey Beneficial Use of Dredged Material for the Delaware River Feasibility Study (July 1, 2013)
- Norfolk Harbor and Channels Deepening Project, Hampton Roads, VA General Reevaluation Report (July 8, 2015)
- North Atlantic Coast Comprehensive Study (July 30, 2013)
- North Shore of Long Island, Bayville, New York Feasibility Report (August 26, 2015)
- Passaic River Basin, New Jersey General Reevaluation Report (March 25, 2012)
- Pawcatuck River, Rhode Island Coastal Storm Damage Reduction Feasibility Study (August 14, 2014)
- Pawcatuck River, Rhode Island Flood Risk Management Feasibility Study (August 14, 2014)
- Peckman River, New Jersey Flood Risk Management Feasibility Study (December 14, 2012)
- Pennsylvania Beneficial Use of Dredged Material for the Delaware River Feasibility Study, Pennsylvania (March 24, 2015)
- Pine Knott, Pottsville, Pennsylvania (December 14, 2012)
- Poplar Brook, New Jersey Section 205 Continuing Authorities Program Flood Risk Management Feasibility Study (December 11, 2012)
- Portsmouth Harbor and Piscataqua River Navigation Improvement Project, Maine and New Hampshire (December 14, 2012)
- Prince George's County, Anacostia Watershed Restoration, MD Study, Ecosystem Rest Feasibility Study (December 14, 2012)
- Rahway River Basin, New Jersey Flood Risk Management Feasibility Report (July 2, 2012)
- Rappahannock River Basin, Virginia (December 14, 2012)
- Searsport Harbor, Maine (December 14, 2012)
- Schuylkill River, Wissahickon Creek restoration, Pennsylvania Feasibility Study (December 14, 2012)
- South Shore of Staten Island, New York Storm Damage Reduction Study (July 31, 2014)
- Southern Branch of the Elizabeth River, Hampton Roads, VA General Reevaluation Report (July 13, 2015)<
- Susquehanna River Basin Low Flow Management Study, Pennsylvania, New York and Maryland Watershed Assessment (October 5, 2012)
- Upper Delaware River Watershed, Livingston Manor, New York (December 14, 2012)
- Upper Susquehanna River_Basin Comprehensive Flood Damage Reduction Study (September 15, 2016)
- Willoughby Spit and Vicinity, Norfolk, Virginia (December 14, 2012)
- Winooski River, Montpelier, Vermont (December 14, 2012)
- Wreck Pond Watershed, Monmouth County, New Jersey (December 14, 2012)
|