Pittsburgh District Header Image

PITTSBURGH DISTRICT

Home
Home > Missions > Regulatory > Jurisdictional Determinations

Jurisdictional Determinations

 April 2014   October 2014      November 2014     January 2015   February 2015    March 2015    June 2015    August 2015   October 2015   
2010-1069     2013-1798      2014-674    2014-158   2014-136   2014-437   2012-1017    2014-158   2009-447   
         2009-782     2014-855               
             2014-888       2014-1182              
                                   
January 2013   February 2013   April 2013    May 2013    June 2013   July 2013    January 2016   

February

2016

   March 2016  
2012-1596    2012-1126   2012-162   2012-1174    2012-255   2012-1687    2009-1656    2013-1406    2014-1127  
        2012-163               2015-1623  

 2016-100

 

   
        2011-1753                          
                                   
        

June 2016

 

            

July 2016

            

 

August 2016   September 2016  

October 2016

                 
2015-1538  

2016-114

  2016-639    2002-42   2016-1222                  
    2016-981  

2016-776

   2016-1378   2013-130                  
        2016-920                          

Information for our Customers:

     The Department of the Army, acting through the U.S. Army Corps of Engineers (Corps), has authority to permit work and the placement of structures in navigable waters of the U.S. under Sections 9 and 10 of the Rivers and Harbors Act of 1899 (RHA), and to permit the discharge of dredged or fill material in waters of the U.S. under Section 404 of the Clean Water Act (CWA).
     The identification and location of jurisdictional Waters of the United States including wetlands regulated by the Corps under Section 404 of the CWA and Sections 9 and 10 of the RHA is determined through a process known as a Jurisdictional Determination (JD). The Corps uses a multi-parameter approach defined in Technical Report Y-87-1, Corps of Engineers Wetlands Delineation Manual, dated January 1987, and supplemental guidance when making wetland determinations. It generally requires positive evidence of hydrophytic vegetation, hydric soils, and wetlands hydrology for some portion of the growing season for a determination that an area is a federally-regulated wetland.
     The initial step in the permit application process is to identify and delineate those bodies of water and wetlands that are subject to CWA and RHA jurisdiction. The JD process provides important information to a landowner or investor for planning purposes or carrying out certain activities on a given parcel of land. Accurately identifying jurisdictional waters is essential in making an application for a permit from the Corps to determine if work would occur in regulated waters of the United States.
     An approved JD is an official Corps determination that jurisdictional waters of the United States are either present or absent on a particular site. An approved JD is valid for five years and can be appealed through the Corps' administrative appeal process set out at 33 CFR Part 331.
     In order to help further streamline the JD procedures, we encourage applicants to consider the use of consultants (LINK TO WETLAND CONSULTANT LIST) to help perform the delineation, document the basis and rationale for asserting or declining to assert jurisdiction under the CWA, and provide an electronic copy as well as a paper copy of the completed JD form (and supporting documentation) with the permit application or JD request.