[ USACE Home ] > [ Library Program ] > [Publications] > [Engineer Manuals] | Search |
PUB.NUMBER | PAGES | PROPONENT | TITLE | PUB.DATE |
EM 200-1-1 | 504 | CEMP | Validation of Analytical Chemistry Laboratories | 01 Jul 94 |
EM 200-1-2 | 132 | CEMP-RT | Technical Project Planning (TPP) Process | 31 Aug 98 |
EM 200-1-4 (Volume I) | 187 | CEMP-RT | Risk Assessment Handbook: Volume I - Human Health Evaluation | 31 Jan 99 |
EM 200-1-4 (Volume II) | 193 | CEMP-RT | Risk Assessment Handbook: Volume II - Environmental Evaluation | 31 Dec 2010 |
EM 200-1-6 | 126 | CEMP-RT | Chemical Quality Assurance for HTRW Projects | 10 Oct 97 |
EM 200-1-7 | 114 | CEMP-RT/ CECW-E |
Performance Evaluation (PE) Program | 01 Feb 01 |
EM 200-1-10 Errata Sheet 1 |
129 | CEMP-RT/ CECW-E |
Environmental Quality - Guidance for Evaluating Performance-Based Chemical Data | 30 Jun 05 01 Jun 09 |
EM 385-1-1 *_2003_*, Arabic | 977 | CESO-ZA | Safety - Safety and Health Requirements | 03 Nov 03 |
EM 385-1-1 *_2008_* Dari |
1045 | CESO-ZA | Safety - Safety and Health Requirements | 15 Sep 08 |
EM 385-1-1 *_2003_*, English | 977 | CESO-ZA | Safety - Safety and Health Requirements NOTE: This 2003 version will remain posted due to on-going contracts that were bid according to requirements of this manual. |
03 Nov 03 |
EM 385-1-1 *_2008_*, English, Changes, Errata |
1045 | CESO-ZA | Safety - Safety and Health Requirements | 15 Sep 08 |
EM 385-1-1 *_2003_*, Japanese | 977 | CESO-ZA | Safety - Safety and Health Requirements | 03 Nov 03 |
EM 385-1-80 | 186 | CESO-I | Radiation Protection Manual | 30 May 97 |
EM 385-1-97 Errata/Changes | 358 | CESO-ZA | Explosives - Safety and Health Requirements Manual | 15 Sep 08 |
EM 500-1-24 | 136 | CECW-OE-E | Corps of Engineers Exercise Manual (COREM) - ANNEX L Classified CONFIDENTIAL -(Stocked and Issued by Proponent) | 01 Sep 87 |
EM 1110-1-400 | 203 | CECW-CO | Recreation Facility and Customer Services Standards | 01 Nov 04 |
EM 1110-1-501 | 200+ | CEMP-ET | Process Design Manual for Land Treatment of Municipal Wastewater | 20 May 82 |
EM 1110-1-502 | 382 | CEMP-R/ CECW-E |
Technical Guidelines for Hazardous & Toxic Waste Treatment and Cleanup Activities | 30 Apr 94 |
EM 1110-1-1000 | 371 | CECW-EE | Photogrammetric Mapping | 01 Jul 02 |
EM 1110-1-1002 | 072 | CECW-EE | Survey Markers and Monumentations | 01 Mar 12 |
EM 1110-1-1003 | 469 | CECW-EE | NAVSTAR Global Positioning System Surveying | 28 Feb 11 |
EM 1110-1-1005 | 498 | CECW-CE | Engineering and Design: Control and Topographic Surveying | 01 Jan 07 |
EM 1110-1-1200 | 051 | CECW-ET | Conceptual Site Models for Ordnance and Explosives (OE) and Hazardous, Toxic, and Radioactive Waste (HTRW) Projects | 03 Feb 03 |
EM 1110-1-1802 | 317 | CECW-EG | Geophysical Exploration for Engineering and Environmental Investigations | 31Aug 95 |
EM 1110-1-1804 | 148 | CECW-ET | Geotechnical Investigations, ENG 1836, ENG 1836A | 1 Jan 01 |
EM 1110-1-1904 | 204 | CECW-EP | Settlement Analysis | 30 Sep 90 |
EM 1110-1-1905 | 201 | CECW-EG | Bearing Capacity of Soils | 30 Oct 92 |
EM 1110-1-2009 | 052 | CECW-EG | Architectural Concrete | 31 Oct 97 |
EM 1110-1-2907 | 205 | CECW-EG | Rock Reinforcement | 15 Feb 80 |
EM 1110-1-2908 | 065 | CECW-EG | Rock Foundations | 30 Nov 94 |
EM 1110-1-2909 | 149 | CECW-EE | Geospatial Data and Systems | 30 Sep 05 |
EM 1110-1-3500 | 032 | CECW-EG | Chemical Grouting | 31 Jan 95 |
EM 1110-1-4000 | 068 | CEMP-RT/ CECW-EG |
Monitoring Well Design, Installation, and Documentation at Hazardous Toxic , and Radioactive Waste Sites | 1 Nov 98 |
EM 1110-1-4001 | 424 | CEMP-ET | Soil Vapor Extraction and Bioventing | 03 Jun 02 |
EM 1110-1-4005 | 192 | CEMP-CE | In-Situ Air Sparging | 31 Jan 08 |
EM 1110-1-4006 | 260 | CEMP-RT | Removal of Underground Storage Tanks (USTs) | 30 Sep 98 |
EM 1110-1-4007 | 286 | CEMP-RA | Safety and Health Aspects of Hazardous, Toxic, and Radioactive Waste Remediation Technologies | 15 Aug 03 |
EM 1110-1-4008 | 245 | CEMP-RA | Liquid Process Piping | 16 Sep 02 |
EM 1110-1-4009 | 346 | CEMP-CE | Engineering and Design: Military Munitions Response Actions |
15 Jun 07 |
EM 1110-1-4010 | 285 | CEMP-R | Multi-Phase Extraction | 01 Jun 99 |
EM 1110-1-4011 | 70 | CEMP-RA | Construction Quality Assurance (CQA) Plan - Requirements for Hazardous Waste Landfills | 01 Oct 99 |
EM 1110-1-4012 | 101 | CECW-ET | Engineering and Design: Precipitation/Coagulation/Flocculation | 15 Nov 01 |
EM 1110-1-4014 | 544 | CEMP-CE | Environmental Quality - Environmental Statistics | 31 Jan 08 |
EM 1110-1-4015 | 225 | CEMP-CE | Design: In Situ Thermal Remediation | 28 August 2009 |
EM 1110-1-4016 | 110 | CEMP-CE | Engineering and Design - Landfill Off-Gas Collection and Treatment Systems | 30 May 08 |
EM 1110-2-38 | 008 | CECW-ED | Environmental Quality in Design of Civil Works Projects | 03 May 71 |
EM 1110-2-301 | 013 | CECW-EG/ CEMP-ET |
Guidelines for Landscape Planting at Floodwalls, Levees & Embankment Dams | 01 Jan 00 |
EM 1110-2-410 | 107 | CECW-ED | Design of Recreation Areas and Facilities - Access and Circulation | 31 Dec 82 |
EM 1110-2-501 | 221 | CECW-ET | Small Wastewater Systems | 01 Feb 99 |
EM 1110-2-503 | 83 | CECW-ET | Design of Small Water Systems | 27 Feb 99 |
EM 1110-2-504 | 057 | CECW-ED | Land Treatment Systems Operation and Maintenance | 30 Nov 83 |
EM 1110-2-1003 Change 1 (01 Apr 04) |
580 | CECW-EE CECW-OD |
Hydrographic Surveying | 01 Jan 02 |
EM 1110-2-1009 | 292 | CECW-EE | Engineering and Design - Structural Deformation Surveying | 01 Jun 02 |
EM 1110-2-1100 |
78 | CECW-EW | Coastal Engineering Manual - Part I | 30 Apr 02 |
EM 1110-2-1100 |
608 | CECW-EW | Coastal Engineering Manual - Part II | 30 Apr 02 |
EM 1110-2-1100 |
472 | CECW-EW | Coastal Engineering Manual - Part III | 30 Apr 02 |
EM 1110-2-1100 |
230 | CECW-EW | Coastal Engineering Manual - Part IV | 30 Apr 02 |
EM 1110-2-1100 |
667 | CECW-EW | Coastal Engineering Manual - Part V | 30 Apr 02 |
EM 1110-2-1100 |
667 | CECW-EW | Coastal Engineering Manual - Part VI | 30 Apr 02 |
EM 1110-2-1100 Appendix A, Glossary |
095 | CECW-EW | Coastal Engineering Manual - Appendix A - Glossary of Coastal Terminology | 30 Apr 02 |
EM 1110-2-1201 | 191 | CECW-EH-W | Reservoir Water Quality Analyses | 30 Jun 87 |
EM 1110-2-1202 | 123 | CECW-EH-W | Environmental Engineering for Deep-Draft Navigation Projects | 29 May 87 |
EM 1110-2-1204 | 191 | CECW-EH-W | Environmental Engineering for Coastal Shore Protection | 10 Jul 89 |
EM 1110-2-1205 | 096 | CECW-EH-W | Environmental Engineering and Local Flood Control Channels | 15 Nov 89 |
EM 1110-2-1206 | 039 | CECW-EH-W | Environmental Engineering for Small Boat Basins | 31 Oct 93 |
EM 1110-2-1304, Errata |
049 | CECW-EC | Civil Works Construction Cost Index System (CWCCIS) |
31 Mar 12 Tables updated per schedule |
EM 1110-2-1406 | 142 | CECW-EH | Runoff from Snowmelt | 31 Mar 98 |
EM 1110-2-1411 | 036 | CECW-EH-Y | Standard Project Flood Determinations (ENG BUL 52-8) | 01 Mar 65 |
EM 1110-2-1413 | 089 | CECW-EH-Y | Hydrologic Analysis of Interior Areas | 15 Jan 87 |
EM 1110-2-1415 | 149 | CECW-EH-Y | Hydrologic Frequency Analysis | 05 Mar 93 |
EM 1110-2-1416 | 168 | CECW-EH-Y | River Hydraulics | 15 Oct 93 |
EM 1110-2-1417 | 213 | CECW-EH-Y | Flood Run-off Analysis | 31 Aug 94 |
EM 1110-2-1418 | 114 | CECW-EH-D | Channel Stability Assessment for Flood Control Projects | 31 Oct 94 |
EM 1110-2-1419 | 050 | CECW-EH-Y | Hydrologic Engineering Requirements for Flood Damage Reduction Studies | 31 Jan 95 |
EM 1110-2-1420 | 148 | CECW-EH-Y | Hydrologic Engineering Requirements for Reservoirs | 31 Oct 97 |
EM 1110-2-1421 | 121 | CECW-EH | Groundwater Hydrology | 28 Feb 99 |
EM 1110-2-1424 Change 1 Change 2 |
197 | CECW-ET | Lubricants and Hydraulic Fluids | 28 Feb 99 31 Jul 06 26 Oct 07 |
EM 1110-2-1601 | 080 | CECW-EH-D | Hydraulic Design of Flood Control Channels | 30 Jun 94 |
EM 1110-2-1602 | 199 | CECW-EH-D | Hydraulic Design of Reservoir Outlet Works | 15 Oct 80 |
EM 1110-2-1603 | 169 | CECW-EH-D | Hydraulic Design of Spillways | 16 Jan 90 |
EM 1110-2-1604 | 196 | CECW-CE | Hydraulic Design of Navigation Locks | 01 May 06 |
EM 1110-2-1605 | 192 | CECW-EH-D | Hydraulic Design of Navigation Dams | 12 May 87 |
EM 1110-2-1606 | 014 | CECW-EH-D | Hydraulic Design - Surges in Canals Change 1 | 01 Mar 49 |
EM 1110-2-1607 | 154 | CECW-EH-D | Tidal Hydraulics | 15 Mar 91 |
EM 1110-2-1610 | 058 | CECW-EH-D | Hydraulic Design of Lock Culvert Valves | 10 Jul 89 |
EM 1110-2-1611 | 138 | CECW-EH-D | Layout and Design of Shallow-Draft Waterways with Change 3 (31 Jul 97) and Errata Sheet (27 August 97) | 31 Dec 80 |
EM 1110-2-1612, changes | 197 | CECW-CW | Ice Engineering | 30 Oct 02 |
EM 1110-2-1613 | 212 | CECW-CE | Hydraulic Design of Deep-Draft Navigation Projects | 31 May 06 |
EM 1110-2-1614 | 110 | CECW-EH-D | Design of Coastal Revetments, Seawalls and Bulkheads | 30 Jun 95 |
EM 1110-2-1615 | 131 | CECW-EH-D | Hydraulic Design of Small Boat Harbors | 25 Sep 84 |
EM 1110-2-1619 | 61 | CECW-EH | Risk-Based Analysis for Flood Damage Reduction Studies | 1 Aug 96 |
EM 1110-2-1701 | 825 | CECW-EH | Hydropower Change 1 | 31 Dec 85 |
EM 1110-2-1810 | 291 | CECW-EG | Coastal Geology | 31 Jan 95 |
EM 1110-2-1901 | 389 | CECW-EG | Seepage Analysis and Control for Dams CH 1 | 30 Sep 86 (original) 30 Apr 93 (change 1) |
EM 1110-2-1902 | 205 | CECW-EW | Slope Stability | 31 Oct 03 |
EM 1110-2-1906 | 407 | CECW-EG | Laboratory Soils Testing CH 1-2 | 30 Nov 70 |
EM 1110-2-1908 | 083 | CECW-EG | Instrumentation of Embankment Dams and Levees | 30 Jun 95 |
EM 1110-2-1909 | 044 | CECW-EG | Calibration of Laboratory Soils Testing Equipment | 01 Dec 70 (original) 10 Mar 86 (change 1) |
EM 1110-2-1911 | 100 | CECW-EG | Construction Control for Earth & Rock-Fill Dams | 30 Sep 95 |
EM 1110-2-1913 | 164 | CECW-EG | Design & Construction of Levees | 30 Apr 00 |
EM 1110-2-1914 | 091 | CECW-EG | Design, Construction and Maintenance of Relief Wells | 29 May 92 |
EM 1110-2-2000 | 124 | CECW-EG | Standard Practice for Concrete for Civil Works Structures Change 2 | 01 Feb 94(original) 31 Mar 01 (change 2) |
EM 1110-2-2002 | 184 | CECW-ED | Evaluation and Repair of Concrete Structures | 30 Jun 95 |
EM 1110-2-2005 | 063 | CECW-EG | Standard Practice for Shotcrete | 31 Jan 93 |
EM 1110-2-2006 | 077 | CECW-EG | Roller-Compacted Concrete | 15 Jan 00 |
EM 1110-2-2007 | 053 | CECW-ED | Structural Design of Concrete Lined Flood Control Channels | 30 Apr 95 |
EM 1110-2-2100 | 161 | CECW-CE | Stability Analysis of Concrete Structures | 01 Dec 05 |
EM 1110-2-2102 | 002 | CECW-EG | Waterstops and Other Preformed Joint Materials for Civil Works Structures | 30 Sep 95 |
EM 1110-2-2104 Change 1 |
075 | CECW-ED | Strength Design for Reinforced - Concrete Hydraulic Structures | 30 Jun 92 20 Aug 03 |
EM 1110-2-2105 | 006 | CECW-ED | Design of Hydraulic Steel Structures Change 1 | 31 Mar 93 |
EM 1110-2-2200 | 088 | CECW-ED | Gravity Dam Design | 30 Jun 95 |
EM 1110-2-2201 | 238 | CECW-ED | Arch Dam Design | 31 May 94 |
EM 1110-2-2300 | 130 | CECW-EG | Engineering and Design - General Design and Construction Considerations for Earth and Rock-Fill Dams | 30 Jul 04 |
EM 1110-2-2301 | 094 | CECW-EG | Test Quarries and Test Fills | 30 Sep 94 |
EM 1110-2-2302 | 060 | CECW-EG | Construction With Large Stone | 24 Oct 90 |
EM 1110-2-2400 | 143 | CECW | Structural Design and Evaluation of Outlet Works | 02 Jun 03 |
EM 1110-2-2502 | 447 | CECW-ED | Retaining and Flood Walls | 29 Sep 89 |
EM 1110-2-2503 | 184 | CECW-EP | Design of Sheet Pile Cellular Structures Cofferdams & Retaining Structures | 29 Sep 89 |
EM 1110-2-2504 | 074 | CECW-ED | Design of Sheet Pile Walls | 31 Mar 94 |
EM 1110-2-2602 | 185 | CECW-ED | Planning and Design of Navigation Locks | 30 Sep 95 |
EM 1110-2-2607 | 117 | CECW-ED | Planning and Design of Navigation Dams | 31 July 95 |
EM 1110-2-2608 | 011 | CECW-EE | Navigation Locks - Fire Protection Provisions | 28 Feb 94 |
EM 1110-2-2610 Change 1 Change 2 |
322 | CECW-ET | Lock and Dam Gate Operating and Control Systems | 12 Dec 03 02 Apr 04 18 Nov 08 |
EM 1110-2-2611 | 061 | CECW-EW | Engineering for Prefabricated Construction of Navigation Projects | 01 Feb 04 |
EM 1110-2-2701 | 056 | CECW-ED | Vertical Lift Gates | 30 Nov 97 |
EM 1110-2-2702 | 112 | CECW-ET | Design of Spillway Tainter Gates | 01 Jan 00 |
EM 1110-2-2703 | 272 | CECW-ED | Lock Gates and Operating Equipment | 30 Jun 94 |
EM 1110-2-2704 | 106 | CECW-CE | Cathodic Protection Systems for Civil Works Structures | 12 July 04 |
EM 1110-2-2705 | 109 | CECW-ED | Structural Design of Closure Structures for Local Flood Protection Projects | 31 Mar 94 |
EM 1110-2-2901 | 236 | CECW-ED | Tunnels and Shafts in Rock | 30 May 97 |
EM 1110-2-2902 | 085 | CECW-ED | Conduits, Culverts and Pipes | 31 Oct 97 (original) 31 Mar 98 (change 1) |
EM 1110-2-2906 | 189 | CECW-ED | Design of Pile Foundations | 15 Jan 91 |
EM 1110-2-2907 | 217 | CECW-EE | Engineering and Design - Remote Sensing | 01 Oct 03 |
EM 1110-2-3001 Change 1 |
041 | CECW-ED | Planning and Design of Hydroelectric Power Plant Structures | 30 Apr 95 10 Oct 08 |
EM 1110-2-3006 | 114 | CECW-EE | Hydroelectric Power Plants Electrical Design | 30 Jun 94 |
EM 1110-2-3102 | 033 | CECW-EE | General Principles of Pumping Station Design and Layout | 28 Feb 95 |
EM 1110-2-3104 | 071 | CECW-ED | Structural and Architectural Design of Pumping Stations | 30 Jun 89 |
EM 1110-2-3105 | 169 | CECW-ET | Mechanical and Electrical Design of Pumping Stations | 30 Mar 94 (original) 31 Aug 94 (change 1) 30 Nov 99 (change 2) |
EM 1110-2-3200 Change 1 - 02 Apr 04 |
078 | CECW-EE | Wire Rope Selection Criteria for Gate-Operating Devices | 30 Sep 98 02 Apr 04 |
EM 1110-2-3400 | 158 | CECW-EE | Painting: New Construction and Maintenance | 30 Apr 95 |
EM 1110-2-3401 | 85 | CECW-ET | Thermal Spraying: New Construction and Maintenance | 29 Jan 99 |
EM 1110-2-3506 | 159 | CECW-EG | Grouting Technology | 20 Jan 84 |
EM 1110-2-3600 | 226 | CECW-EH-W | Management of Water Control Systems, S2, S3, S3W, S10,S11, S12, S5001B, S5001D | 30 Nov 87 |
EM 1110-2-3800 | 146 | CECW-EG | Systematic Drilling and Blasting for Surface Excavations | 01 Mar 72 |
EM 1110-2-4000 | 268 | CECW-EH-Y | Sedimentation Investigations of Rivers and Reservoirs, ENG 1787 | 31 Oct 95 |
EM 1110-2-4205 | 111 | CECW-EE | Hydroelectric Power Plants Mechanical Design CH 1 (31 Jul 96) | 30 Jun 95 |
EM 1110-2-4300 | 305 | CECW-ED | Instrumentation for Concrete Structures | 15 Sep 80 (original) 30 Nov 87 (change 1) |
EM 1110-2-5025 | 093 | CECW-EH-D | Dredging & Dredged Material Disposal | 25 Mar 83 |
EM 1110-2-5026 | 284 | CECW-EH-D | Beneficial Uses of Dredged Material | 30 Jun 87 |
EM 1110-2-5027 | 243 | CECW-EH-D | Confined Disposal of Dredged Material | 30 Sep 87 |
EM 1110-2-6050 | 247 | CECW-ET | Response Spectra and Seismic Analysis for Concrete Hydraulic Structures | 30 Jun 99 |
EM 1110-2-6051 | 401 | CECW-EW | Engineering and Design - Time-History Dynamic Analysis of Concrete Hydraulic Structures | 22 Dec 03 |
EM 1110-2-6053 | 247 | CECW-CE | Engineering and Design - Earthquake Design and Evaluation of Concrete Hydraulic Structures | 01 May 07 |
EM 1110-2-6054 | 133 | CECW-ED | Inspection, Evaluation and Repair of Hydraulic Steel Structures | 01 Dec 01 |
EM 1110-2-6056 | 422 | CECE-CE | Standards and Procedures for Referencing Project Elevation Grades to Nationwide Vertical Datums | 31 Dec 10 |
EM 1110-3-130 | 043 | CEMP-ET | Geometrics for Roads, Streets, Walks and Open Storage Areas - Mobilization Construction | 09 Apr 84 |
EM 1110-3-131 | 045 | CEMP-ET | Flexible Pavements for Roads, Streets, Walks and Open Storage Areas - Mobilization for Construction | 09 Apr 84 |
EM 1110-3-132 | 040 | CEMP-ET | Rigid Pavements for Roads, Streets, Walks and Open Storage Areas - Mobilization Construction | 09 Apr 84 |
EM 1110-3-135 | 036 | CEMP-ET | Standard Practice for Concrete Pavements - Mobilization Construction | 09 Apr 84 |
EM 1110-3-136 | 203 | CEMP-ET | Drainage and Erosion Control - Mobilization Construction | 09 Apr 84 |
EM 1110-3-137 | 032 | CEMP-ET | Soil Stabilization for Pavements - Mobilization Construction | 09 Apr 84 |
EM 1110-3-138 | 98 | CEMP-ET | Pavement Criteria for Seasonal Frost Conditions -Mobilization Construction | 09 Apr 84 |
EM 1110-3-141 | 102 | CEMP-ET | Airfield Flexible Pavement - Mobilization Construction | 09 Apr 84 |
EM 1110-3-142 | 083 | CEMP-ET | Airfield Rigid Pavement - Mobilization Construction | 09 Apr 84 |
EM 1110-3-150 | 054 | CEMP-ET | Storage Depots - Mobilization Construction | 09 Apr 84 |
EM 1110-3-152 | 035 | CEMP-ET | Railroads - Mobilization Construction | 09 Apr 84 |
EM 1110-3-160 | 015 | CEMP-ET | Water Supply, General Considerations - Mobilization Construction | 09 Apr 84 |
EM 1110-3-161 | 035 | CEMP-ET | Water Supply, Water Sources - Mobilization Construction | 09 Apr 84 |
EM 1110-3-162 | 059 | CEMP-ET | Water Supply, Water Treatment - Mobilization Construction | 09 Apr 84 |
EM 1110-3-163 | 020 | CEMP-ET | Water Supply, Water Storage - Mobilization Construction | 09 Apr 84 |
EM 1110-3-164 | 056 | CEMP-ET | Water Supply, Water Distribution - Mobilization Construction | 09 Apr 84 |
EM 1110-3-166 | 038 | CEMP-ET | Water Supply, Fire Protection - Mobilization Construction | 09 Apr 84 |
EM 1110-3-172 | 117 | CEMP-ET | Domestic Wastewater Treatment - Mobilization Construction | 11 May 84 |
EM 1110-3-173 | 038 | CEMP-ET | Sanitary and Industrial Wastewater Pumping - Mobilization Construction | 09 Apr 84 |
EM 1110-3-174 | 031 | CEMP-ET | Sanitary and Industrial Wastewater Collection -Mobilization Construction | 09 Apr 84 |
EM 1110-3-176 | 019 | CEMP-ET | Incinerators - Mobilization Construction | 09 Apr 84 |
EM 1110-3-177 | 033 | CEMP-ET | Sanitary Landfill - Mobilization Construction | 09 Apr 84 |
EM 1110-8-1(FR) | 139 | CECW-EH-D | Winter Navigation on Inland Waterways | 31 Dec 90 |
EM 1110-35-1 | 124 | CEMP-DE | Engineering and Design: Management Guidelines for Working with Radioactive and Mixed Waste | 01 Jul 05 |
EM 1125-2-312 | 094 | CECW-D | Manual for Instructions - Hopper Dredge Operations and Standard Reporting Procedures, ENG 2590 | 01 Dec 53 |