Larkspur Ferry Channel

LARKSPUR FERRY CHANNEL



OPERATIONS AND MAINTENANCE

PROJECT LOCATION AND Description

Larkspur Landing is the main Golden Gate Ferry terminal in Larkspur, Marin County, California. This project consists of maintenance dredging of the main navigation channel into the landing to a depth of -13 feet Mean Lower Low Water (MLLW) for a length of 13,560 feet and a width of 232 feet and -15 feet MLLW in the Turning Basin at the channel terminal.

TOTAL FUNDING

 

 

 

TOTAL COST

N/A

FEDERAL COST

N/A

NON-FEDERAL COST

N/A

 

 

TOTAL FEDERAL COST THROUGH FY 2016

$ 0

ARRA FUNDS

$ 0

FY 2017 BUDGET

$ 0

COST TO COMPLETE

N/A

 

FY 16 ACCOMPLISHMENTS 

  • Prior years funds will be used to prepare a letter report (per WRDA 07) to determine whether maintenance of the project is feasible.  Guidance received on Section 3021 of the Act, however, requires that work on an unfunded project contained in the Act not be done until Implementation Guidance is issued - and Implementation Guidance will not be issued until funding is provided. 

FY 17 ACCOMPLISHMENTS (based on the availability of funds)

  • If feasibility is determined, and the letter report is acceptable, then initiate sediment testing, plans and specifications (P&S), and environmental coordination.

ISSUES AND OTHER INFORMATION

  • The Golden Gate Bridge, Highway and Transportation District, which provides ferry transit service between Marin County and San Francisco, is the Non-Federal Sponsor (NFS).
  • The Corps of Engineers assumed temporary responsibility for maintenance of this project in 2001, subject to provisions contained in both the WRDA 1986 and the WRDA 1999, which authorized the Secretary of the Army to maintain the Larkspur Ferry Channel as a small navigation project (Section 107 of the River and Harbor Act of 1960) with total federal expenditures administratively limited to $4,500,000. Dredging of the Channel and Turning Basin was completed to project depths in August 2003 and, since the total Federal expenditure limit had been reached, the Operation and Maintenance (O&M) of the Larkspur Ferry Channel reverted back to the responsibility of the NFS in 2004. .

CONGRESSIONAL INTEREST

  • 2nd District, Rep. Jared Huffman

POINT OF CONTACT

  • Deputy for Project Management, Arijs A. Rakstins, (415) 503-6720

Updated on 22 February 2016