Peer Review Plans

Project Review Plans

 

   Barren Lake, KY WCM Review Plan
     -WCM Review Plan, Rev. 2 June 2014

   Nolin Lake, KY WCM Review Plan
     -WCM Review Plan (June 2014) Approval 6 May 2015

   Louisville District's Spring Flooding, IN-KY 2013
     -Project Information Report Review Plan Final 20 Feb 2014

   Louisville Levee System Evaluation
     -Review Plan - LRD Approval Memo 2014

  Louisville Metro LSE
    -Review Plan (Approved) (2014) 

  Monroe Lake, IN CAP 1135
     -Decision/Feasibility (2015)

  Ohio Riverfront - Cincinnati, Ohio
   
 -Design and Implementation (2014)
     -Approval Memo (2014)
    
  Patoka Lake, IN
       
- Issue Evaluation Study (2014)
        - Approval Memo (2014)

  Mill Creek, OH - Flood Damage Reduction Project
        
Approval memo
        - Review plan

   Aquatic Nuisance Controls Report – Maumee Basin Connection, Fort Wayne, IN 
        -  Interim Controls Report (2012)

    Feather Creek, Clinton, IN CAP 205 
        - Design and Implementation (2012)     

    Green and Barren Disposition Study, KY
       
- Decision/Feasibility (2013)

    Indianapolis, White River North, IN Phase 3B FRM 
        - Construction (2010)     

    Emergency Levee Reconstruction
        - 2012 Project Information Reports (2013)

    Metro Louisville Mill Creek, KY FRM
        - Decision/Feasibility (2009)

    Olmsted Lock and Dam
        - Implementation (2013)
        - In the Dry (2012)
        - Post Authorization Change Report

    Ohio River Shoreline, Paducah, KY LFPP
        - Design and Construction (2013)
        - Decision/Feasibility (2009)

    Metro Louisville, Southwest, KY
        - Decision/Feasibility (2008)

    Holes Creek, West Carrollton, OH FRM
        - Construction (2013)

    JE Roush Lake, IN
        -Issue Evaluation Study (2013)

    Rough River Lake, KY
        - Dam Safety Modification Report (2010)
        - Dam Safety Modification Report (2013)
        - Implementation Phase (2014)
        - Approval Memo (2014)

    CM Hardin Lake, IN
        - Issue Evaluation Study (2013)

    Green River Watershed 729 Study, IN
        - Watershed Analysis (2013)

    White River Anderson, IN FRM
        -Design/Implementation (2013)

     Northern Kentucky Riverfront Commons, KY ENR
        -Decision/Feasibility (2013)

     Young's Creek, IN FRM
         -Decision/Feasibility (2015)

 

LRD Regional Review Plans

    - CAP Sections 14, 107, 111, 204, 206, 208, and 1135 Model (2014 Update)
    - 2014 MSC Update Approval -   Commanding General Approval Memorandum (2012) 
    - Environmental Infrastructure Model (2012)
    - Great Lakes Fisheries and Ecosystem restoration Model (2012)
    - Operations and Maintenance (2012)
    - LRD_Sect408_Regional_Procedural_ReviewPlan.pdf

USACE National Review Plans

    - Operations and Maintenance (2013)

USACE Review Plan Policy and Guidance

    - EC 1165-2-214 – Civil Works Review (2012)

IEPR

Independent External Peer Review (IEPR) is required under EC 1165-2-214 for decision documents.  IEPR documents for projects within the Louisville District boundaries can be viewed using the link below.

 

LRL Reports and Comment Responses

Project Partnership Agreements

A Project Partnership Agreement (PPA) is a legally-binding agreement between the Government and a non-federal sponsor (state, municipal government, flood control district, port authority, etc.) for construction of a water resources project. It describes the project and the responsibilities of the Government and the non-federal sponsor in the cost-sharing and execution of work.

 

Project Partnership Agreements (1997-Present)