Home > Missions > Civil Works > Shore Bank Protection > Connecticut > Middle Beach

Civil Works Menu

Middle Beach Shore and Bank Protection Project

Middle Beach is a narrow beach situated midway along the Madison shorefront, opposite Tuxis Island and immediately southward of the town center.

The project consists of a 20-foot-wide, 700-foot-long revetment. It was completed in May 1957 and cost $26,400.