Jacksonville District Header Image

JACKSONVILLE DISTRICT

Home
Home > Missions > Civil Works > Review Plans

Review Plans

Collapse All Expand All

FY-2016 Review Plans

St. Johns County, Florida Hurricane and Storm Damage Reduction (HSDR) Feasibility Study and Environmental Assessment, Jan 25, 2016

San Juan Harbor Improvement Study, April 1, 2016

C-111 Contract 8A EDR, Review Plan and Approval Memo, March 2, 2016

C-43 Design Package S-476, Feb 10, 2016

Cano Martin Pena Review Plan, April 25, 2016

Duval SPP Review Plan and Approval Memo, April 7, 2016

HHD Gap Reach 1 Gap Closure Review Plan and Approval memo, Jan 15, 2016

HHD Reach 1 Cutoff Wall Extension Review Plan and Approval memo, May 2, 2016

Lake Hicpochee 408 Package Review Plan and Approval memo, May 3, 2016

Miami Dade Hot Spots Review Plan and Approval memo, May 2, 2016

Okeechobee Waterway DMMA O-7 Review Plan and Approval memo, May 3, 2016

S-169 and C-20 Package Review Plan and Approval Memo, Feb 19, 2016


FY-2015 Review Plans

8.5 Square Mile, S-357N, 8 December 2014

Brevard County Mid-Reach Mitigation RP and Approval Memo 03-Apr-2015

Broward County Segment II RP and Approval Memo 3-Apr-2015

C-111 Project Modifications to the C&SF Project Contract 8 Miami-Dade 11-May-2015

C-43 SFWMD Design Package 1 Preloading Demolition 6-Jul-2015_Redacted

C&SF Project, Changes to Structure 190 Operational Criteria, Master Water Control Manual

(Water Conservation Areas, Everglades National Park, and ENP-South Dade Conveyance System)

-Review Plan, 14 Jan 2015

-Approval, 04 Feb 2015

Continuing Authorities Program, South Atlantic Division Programmatic Review Plan, 9 Apr 2015

-Enclosure A, Review Plan Template (MS_Word)

-Enclosure B, IEPR Decision Analysis/Regional CAP Review Plan Applicability Determination (MS_Word)

G-3273 Contraint Relaxation/S-356 and S357N Field Test, October 2014

G-3273 Contraint Relaxation Approval Memo, 24 November 2014

Herbert Hoover Dike 2015 Major Rehabilitation Report Supplement and Environmental Assessment

Herbert Hoover Dike Dam Safety Modification Report and Environmental Assessment, 17 September 2015

Jacksonville Harbor Deepening, PED Documents, 15 December 2014

KRR CNT 12A S-69 Weir RP and Approval Memo, 24-August-2015

Picayune Strand, Approval of RP for Manatee Mitigation Feature, 11 February 2015

Rio Culebrinas, Flood Risk Management, Sec 205, plan and approval 18 Mar 2015

Rio de la Plata, Flood Risk Management, 9 Apr 2015

San Juan Harbor Mitigation, Approval of RP, 02 May 2015

Seminole Big Cypress Basin 3 EDR RP and Approval Memo 3-Apr-2015

St. Johns County, Florida, Coastal Storm Risk Management Project Validation Study, 10 Aug 2015

St. Lucie River Oyster Reef Estuary Habitat Restoration, Phase II, 12 Jan 2015

Upper St. Johns, S252, Deficiencies Report, 24 November 2014

FY-2014 Review Plans

Aquifer Storage and Recovery Regional Study Technical Data Report, 3 Jun 2014

Canaveral Harbor Widening and Deepening, 13 November 2013

Grassy Flats Estuarine Habitat Restoration Project, 17 Jun 2014

Kissimmee River Restoration, LRR, Revised Review Plan, July 2014

Portugues Dam, Approval of Revised RP, 19 May 2014

Sarasota County, Lido Key, 28 Oct 2013

Sarasota County, Venice Beach, 24 June 2014

Seminole Big Cypress Reservation, Water Control Manual, Basins 1, 2, and 4

Seminole Big Cypress Reservation, WCM, Basins 1, 2, and 4 approval, 25 Nov 2013

STA-1E Gates Deficiencies Modification Report, Review Plan, 18 July 2014

FY-2013 Review Plans

Banana River Estuary Restoration Project

Banana River Estuary Restoration Project, Approval Memo, 29 April 2013

Brevard County, North and South Reach, FCCE, 23 August 2013

Broward County, Segment 2, LRR

Broward County, Segment 2, Approval Memo

Broward County (Segment II), Florida FCCE Review Plan

Cano Martin Pena

Cano Martin Pena Approval Memo

Dade County Beach Erosion Control and Hurricane Protection, LRR

Dade County Beach Erosion Control and Hurricane Protection, LRR Approval Memo

Dade County Beach Erosion Control LRR, Revised Review Plan

Dade County Beach Erosion Control, Approval of RP for Periodic Renourishment, 26 November 2012

FCCE Approval of RP, Manatee SP, Gasparilla Island, Lee County, 12 August 2013

FCCE Approval of RP, Jupiter/Carlin, Ocean Ridge, Delray Beach and North Boca of Palm Beach County, 12 August 2013

Fort Pierce Beach Shore Protection Project Review Plan

Indian River Lagoon South (IRLS) C-44 Review Plan 17-DEC-2012

Jacksonville Harbor General Reevaluation Report (GRR2)

Jacksonville Harbor O&M, Dredged Material Management Plan

Kissimmee River Restoration Project, Contract 15A, River Acres Supplemental Work, 25 March 2013

Lake Worth Inlet, Palm Beach Harbor, Feasibility Study

Lake Worth Inlet, Palm Beach Harbor, Approval Memo

Lower Hillsborough and Tampa Bypass Canal Master Water Control Manual

Lower Hillsborough and Tampa Bypass Canal MWCP Approval Memo

Manatee County LRR

Manatee County LRR Approval Memo

Modified Water Deliveries, Letter Report to Assess Competion Satus

Modified Water Deliveries, Letter Report Approval Memo, 12 April 2013

Palm Beach County, Jupiter Carlin, Section 934 Study

Palm Beach County, Jupiter Carlin Approval Memo

Palm Beach County, Ocean Ridge LRR

Palm Beach County, Ocean Ridge Approval Memo

Picayune Strand PAC LRR

Picayune Strand Approval Memo

Pinellas and Lee County Hurricane and Storm Damage Reduction Review Plans, 13 June 2013

Port Everglades Feasibility Study Review Plan Second Update, 23 Jan 2012

Programmatic Review Plan for Routine O&M Products

Rio Puerto Nuevo, PR, Review Plan, 14 December 2012

Rio Grande de Arecibo, Post Authorization Change Report

Rio Grande de Arecibo, PACR, Approval Memo, 2 May 2013

Rio Puerto Nuevo, Post Authorization Change Report

Rio Puerto Nuevo, PAC, Approval Memo, 17 May 2013

San Juan Harbor LRR, Mitigation

San Juan Harbor LRR, Review Plan Approval, 30 May 2013

Seminole Big Cypress Reservation, Water Control Plan and EA, 1 Oct 12

Seminole Big Cypress Reservation, Water Control Plan, Approval Memo

Stormwater Treatment Area STA 1E (C&SF: West Palm Beach Canal C-51) Letter Report

Stormwater Treatment Area STA 1E Approval Memo, 8 Apr 2013

Stormwater Treatment Area STA 1E, RP for Everglades Restoration Strategies, L-8 Flow and S-375 Expansion, 8 May 2013

FY-2012 Review Plans

Broward County Water Preserve Area

Broward County Water Preserve Area Approval Memo

C-111 South Dade, Contract 8, 9 Jan 2012

Canaveral Harbor Sec 203

Canaveral Harbor Sec 203 Approval Memo

Cedar Hammock (Wares Creek), 30 April 2012

Central Everglades Planning Project

Central Everglades Planning Project Approval Memo

Dade County SMART Structures

Everglades Restoration Transition Plan, Revisions to Water Control Plan (ENP) and EIS

Herbert Hoover Dike, Design and Construction, 2nd Revision, 10 May 2012

Herbert Hoover Dike, Pilot Test Letter Report, Plans and Specs, 23 April 2012

Jacksonville Harbor, Mile Point, PED Phase, 27 July 2012

Kissimmee River Restoration, Contract 10, PED Phase

Lake Okeechobee Aquifer Storage and Recovery (ASR) Pilot Project Review Plan, 19 March 2012

Martin County Shore Protection, Periodic Renourishment Implementation Docs, 19 March 2012

Sarasota County, Venice Beach, LRR

Southwest Florida Feasibility Study, 16 Nov 2011

STA-1E, PSTA Decommissioning Project and EA, Dec 2011

Tarpon Springs, Whitcomb and Kreamer Bayous, CAP 103, 9 January 2012

Upper St. Johns River Three Forks Marsh Conservation Review Plan, 21 May 2012

Water Control Area 3 Decompartmentalization Physical Model Approval

FY-2011 Review Plans

8.5 Square Mile Area Project, Interim Operating Criteria and EA, 24 June 2011

Big Fishweir Creek, CAP Section 206

Duval County Beach Erosion Control, Periodic Renourishment Implementation Docs, 9 November 2010

Everglades Restoration Plan

Ft. Pierce Beach Shore Protection, Implementation Documents, 1 June 2011

Kissimmee River Restoration Project, Contract 12, S-65EX1 Structure, Intermediate Phase, P&S and DDR, 30 August 2011

Kissimmee River Restoration, C-38 Reach 3 Backfill and Bass Levee Degrade, PED

Kissimmee River Restoration, Limited Reevaluation Report (LRR)

Martin County Shore Protection Review Plan

Martin County Shore Protection Review Plan Approval

Martin County Shore Protection Type 1 IEPR Exclusion

Miami Harbor Deepening & Widening (PhaseIII), 15 August 2011

Picayune Strand Restoration, Design and Construction Phases, 8 August 2011

Pinellas County, Beach Erosion Control, 17 May 2011

Regional O&M Review Plan

Seminole Big Cypress Reservation, Interim Water Control Plan and EA

St. Johns County Shore Protection, Periodic Renourishment Implementation Documents

STA-1E Modifications, Culverts and Trash Rake Systems, Decision Doument

STA-1E Modifications, Culverts and Trash Rake Systems, 18 August 2011

STA-1E Modifications, Culverts and Trash Rake Systems, Review Plan Approval

STA-1E Modifications, Culverts and Trash Rake Systems, IEPR Exclusion

Tampa Harbor GRR

Tampa Harbor Dredged Material Management Plan, 2010-2030 Update



FY-2010 Review Plans

Broward County, Segment 1, Shore Protection

Flagler County Shore Protection Feasibility Study

Kissimmee River Restoration Post-Authorization Change, LRR

Port Everglades Feasibility Study, May 2010 Update

Rio de la Plata, Flood Control

St. Johns County Feasibility Study, May 2010 Update

WCA 3A Decompartmentalization

Site 1 Impoundment - Fran Reich Preserve Review Plan, 4 Feb 2010

FY-2009 Review Plans

Biscayne Bay Coastal Wetlands

C-111 Spreader Canal

Ft. Pierce, St. Lucie County, Shore Protection, GRR

St. Lucie Hurricane and Storm Damage Reduction Feasibility Study and EIS

FY-2008 Review Plans

Brevard County Shore Protection Mid Reach GRR

Flagler County Hurricane and Storm Damage Reduction, Feasibility 17 Mar 2008

Indian River Lagoon North (IRL-N) Feasibility Study

Jacksonville Harbor GRR, Phase 2

Jacksonville Harbor, Mile Point Feasibility Study

Port Everglades Feasibility Study

St. Johns County Feasibility Study