Jacksonville District Header Image

JACKSONVILLE DISTRICT

Home
Home > About > Divisions & Offices > Planning > Environmental Branch > Environmental Documents

Environmental Documents

Printing Note:  Some documents contain pages of various sizes and orientation. You may need to use printer settings such as "scale to fit" or "auto landscape-portrait."

Environmental Documents (not by county)

Collapse All Expand All

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

District Wide

Gulf Regional Biological Opinion

Coastal Dredging and Construction, Gulf of Mexico (National Marine Fisheries Service)

Gulf Regional Biological Opinion 
-
2003 Original Opinion
-2005 revision
-2007 revision
-
Management Protocol, revision 1, Apr 2010

 

 

 South Atlantic Regional Biological Opinion  Coastal Dredging and Construction, South Atlantic Coast (National Marine Fisheries Service)  South Atlantic Regional Biological Opinion
-1991 (original opinion)
-1995
-April 1997
-November 1997
-South Atlantic Division Protocol
   
Updated-Statewide Programmatic Biological Opinion (2015-SPBO) Beach Placement and Shore Protection, Coast of Florida  2015-SPBO March 13 2015  
 2011-Statewide Programmatic Biological Opinion Beach Placement and Shore Protection, Coast of Florida  Statewide Programmatic Biological Opinion, Beach Placement and Shore Protection (Superceded by 2015-SPBO)

Statewide Programmatic Biological Assessment (SPBA) to the U.S. Fish and Wildlife Service

Jacksonville District Commitments in the SPBA

Amendments for 2013 emergency coastal and navigation projects (click on date→)

Aug 22 2011









Feb 17 2011

 

 

Jun 28 2013 (South FL)

Jul 2 2013 (North FL)

 Aug 22 2013

 
 Programmatic Piping Plover Biological Opinion  Beach and Near Shore Placement and Shore Protection, Peninsula of Florida  P3BO
Amendments for 2013 emergency coastal and navigation projects (click on date→)

May 22 2013



Jun 28 2013 (South FL)

Jul 2 2013 (North FL)

 
 Coastal Dredging and Beach Work in Florida  SPBO, SARBO,P3BO, GRBO, SAD Protocol, P&S  Timeline Graphic, 11" X 17" (2-sided) March 2015  
 Cooperative Agreement on Manatees, Section 112(c) Marine Mammal Protection Act  Civil Works Activities Affecting Manatees in Florida  Treatment of Manatees and Coordination with the U.S. Fish and Wildlife Service Dec 19 2012  
 Manatee Detection  Demonstration of Commercial Off-the-Shelf Acoustic Technologies  Technical Note, ERDC TN-DOER-E35  Dec 2012  
 Wetland Mitigation  Compliance with Section 2036 WRDA 2007  Template for Mitigation Plan or Mitigation Summary  Aug 2015  
Southwest Florida Comprehensive Watershed Plan Comprehensive Watershed Plan a habitat quilt tied by Threads of Water reconnecting a sustainable landscape Southwest Florida Comprehensive Watershed Plan    

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Kings Bay Navy Submarine Base

Maintenance Dredging, Camden County, Georgia

Statement of Findings, Department of the Army Permit

Jun 4 2014

 

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Puerto Rico

 Caño Martín Peña  Final Feasibility Report Delivery Package Appendices

A-C National Ecosystem Restoration Benefits Evaluation-Scenario Average Concentrations-Recreation Resources Assessment

D-F Cost Engineering-Adaptive Management Plan-Monitoring Plan

G-Engineering
        
H-Final Environmental Impact Statement

H1-Essential Fish Habitat Assessment
 February 2016  
Fort San Geronimo, CAP 103 Coastal Storm Damage Reduction Final Mitigation Plan Feb 2011  
Rio Culebrinas, Flood Control, Section 204 CAP  Detailed Project Report

Main Text

EA

Appendices

- A, Hydrology & Hydraulics

-B, Geotechnical

-C, Design & Cost

-D, Real Estate

-E, Economics

June 2004  
  Application for Coastal Zone Consistency Concurrence Oct 16 2014  
 San Juan Harbor Navigation Project Mitigation

Final FONSI

Final EA
-Through Append D

 -Append E,

Geotech


High Res drawings (11"X17")

Mar 2 2015  
  Ocean Dredged Material Disposal Site (ODMDS)  Site Management and Monitoring Plan (SMMP) Jan 6 2011  
   Feasibility Study and EIS

Notice of Intent and Public Scoping Meeting

Annouce, Public Scoping Meeting

Anuncio, Reunión de Consulta Publica

Sep 28 2015 -

Oct 1 2015 -

Oct 1  2015

 
Rio Puerto Nuevo Flood Control Project   Revised Mitigation Plan

Project Plans
Mar 2014

2003
 
Highway 187, Piñones  

New Mitigation Plan

Letter to Agencies 

Sep 2013

Oct 2 2013

 
Rio de la Plata, Flood Risk Management  Wetland Delineation and Mitigation -Wetland Delineation (170MB)
-Wetland Boundary Map (35MB)
-Mitigation Assessment and Permit Documents
-Monitoring, Initial
-Monitoring, 6-months
-Project Plan View (2015)

 2008

 2008

 
2008

 
Section 408 Alterations Low-Impact Alterations to USACE Federally Authorized Civil Works Projects Conducted by Non-Federal or Independent Requestors FONSI
Programmatic EA
   
Antilles Building Real Estate Disposal Draft EA and FONSI
NOA English
NOA Espanol
Oct 11 2016 Nov 10 2016

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

U.S. Virgin Islands

There is currently no content in this section.

 

 

 

 

Environmental Documents (by Florida county)

Collapse All Expand All

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

           

Manatee Pass Gates

Manatee Protection Plan at Selected Navigation & Water Control Structures in Central and Southern Florida

Part I, Report and Environmental Assessment

 Oct 3 1995

 

     Part II, Final Integrated Project Modification Report and Environmental Assessment April 4 1997  
 Central Everglades Planning Project  Integrated Project Implementation Report and EIS Final Report/EIS link to EvergladesRestoration.gov Aug 8 2014 Oct 3 2014
 Everglades Restoration Transition Plan (ERTP)  Supplemental Biological Assessment Main Text -E Timeline. Modified      Water Deliveries,      Everglades National      Park and Canal 111. Jul 24 2015  
Herbert Hoover Dike (HHD) Herbert Hoover Dike, Dam Safety Modification Study: Glades, Hendry, Martin, Okeechobee, and Palm Beach Counties, FL ROD
Aug 30 2016 MFR
Final Environmental Impact Statement
Appendices
A-Dam Safety Action Decision Summary
B-Authorities
C-Correspondence
    Part-1
    Part-2
    Part-3
D-Coastal Zone
E-FWCA ESA
F-404_b

June 3 2016 July 1 2016
Temporary Emergency Deviation WCA 3A  Environmental Assessment and FONSI  Environmental Assessment and Appendices Notice of Availability Feb 12 2016 Mar 18 2016
Temporary Emergency Deviation WCA 3A Supplemental Environmental Assessment and FONSI Notice of Availability
Supplemental Environmental Assessment and FONSI
Appendices
     A-Operational Strategy
     B-Coastal Zone Consist
     C-Pertinent Correspon.
     D-Additional Info.

May 10 2016
  L-29 Canal and South Dade Conveyance System Extension of 60 Day Recovery Period Memorandum for Record Jul 8 2016  
Temporary Emergency Deviation to Alleviate High Water Levels in Water Conservation Area 3A (S-344 Deviation) Environmental Assessment and Finding of No Significant Impact Notice of Availability
EA and FONSI
Appendices
     A-Operational Strategy
     B-Coastal Zone
     C-Pertinent  Correspon
S-344 Comment Response Matrix
 
Apr 18 2016 May 18 2016
Section 408 Alterations Low-Impact Alterations to USACE Federally Authorized Civil Works Projects Conducted by Non-Federal Sponsors or Independent Requestors FONSI
Programmatic EA
   
Lake Okeechobee Watershed Project Scoping Letter  Final Scoping Letter Jun 28 2016  
Western Everglades Restoration Project (WERP) Scoping Letter  Scoping Letter Jul 11 2016 Aug 9 2016

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Canaveral Harbor, Section 203 Report

Sponsor prepared study for harbor improvements

           

- Report and EA - FONSI

APPENDICES (link to GPO.gov)     

 December 2012

July 11, 2013         

 

Brevard County Hurricane and Storm Damage Reduction Project  Mid-Reach Segment, Integrated General Reevaluation Report (GRR) and EIS 

Scoping Letter, Truck Haul

Record of Decision Director's Report

Department Army Permit and Statement of Findings

Addendum to GRR/EIS

Final GRR/EIS Appendices -A, Engineering Design and Cost -B, Socio-Economics -C, Real Estate -D, Public Use Determination and Cost Allocation -E, Geotechnical -F, Section 404(B) Evaluation -G, Coastal Zone Consistency -H, Fish and Wildlife Coordination Act Report -I, Pertinent Correspondence and Mailing List -J, Cumulative Effects Assessment -K, Environmental Documentation -L, Public Workshop Correspondence -M, Value Engineering

 

Feb. 11, 2015

Sept. 8, 2014

Aug. 17, 2012

March 2014

April 2011 

March 13, 2015
Mid-Reach Segment (Hurricane and Storm Damage Reduction Project) Proposed Use of Upland Quarries as an Additional Source of Sand 

FONSI
EA w/ Appendices A and B
Appendix C-Pertinent Public Correspondence
Appendix D-Agency Documents

Aug 4 2016  

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Broward County

Port Everglades O&M

Maintenance Dredging

- EA

Nov 2003

 

Port Everglades O&M Maintenance Dredging   - EA - EA, Appendices D-E May 2005  
Port Everglades Port Everglades and Palm Beach Harbor, Ocean Dredged Material Disposal Site (ODMDS)  Final EIS  Jul 2004   
Port Everglades Ocean Dredged Material Disposal Site (ODMDS)  Draft EA  Aug 27 2013  
Port Everglades Feasibility Study  Final Feasibility Study  -Main Text  Mar 20 2015  
Port Everglades Feasibility Study   Final EIS

 Record of Decision

Main Text

Appendices

-A, Correspondence -B, 404(b) evaluation -C, CZM consistency

-D, Natural Resources Baseline Report, 2001 Benthic and Fish, 2009 Acropora Coral, 2010 Seagrass, 2009 Seagrass, 2006 Seagraqss, 2013
E-Mitigation Plan
F, ESA consultation
-G, Coordination Act
-H, NOAA Fisheries Coordination, EFH
-I, Historic Preservation
-J, HTRW
-K, mailing list
-L Comments on Draft and Final EIS          

Jan 2016  
  Feasibility Study, Appendices

A, Engineering B, Economics C, Real Estate D, Correspondence E, Dredged Material Management Plan F, Cost

             
 
Broward County Shore Protection Project  Segment II, FCCE  Final FONSI/EA  Aug 3 2013   na
   Segment II, LRR  

Signed FONSI

Final EA

Oct 27 2015  
Everglades Restoration Transition Plan (ERTP)  Supplemental Biological Assessment  Main Text Appendices -A Biological Assessment      of October 2010. -B Annual Assessments,      2010 - 2015. -C Environmental      Assessment. G-3273      Constraint Relaxation/      S-356 Field Test and      S-357N Operational      Strategy. -D Conveyance System      Operational Guidance. -E Timeline. Modified      Water Deliveries,      Everglades National      Park and Canal 111.   Jul 24 2015   
Temporary Emergency Deviation WCA 3A Environmental Assessment and FONSI 

Environmental Assessment and Appendices 
Notice of Availability

Feb 122016 Mar 18 2016 
Temporary Emergency Deviation WCA 3A
 Supplemental Environmental Assessment and  FONSI

Notice of Availability
Supplemental Environmental Assessment and FONSI
Appendices
     A-Operational Strategy
     B-Coastal Zone Consist
     C-Pertinent Correspon.
     D-Additional Info.

May 10 2016
Temporary Emergency Deviation to Alleviate High Water Levels in Water Conservation Area 3A (S-344 Deviation) Environmental Assessment and Finding of No Significant Impact

Notice of Availability
EA and FONSI
Appendices
     A-Operational Strategy
     B-Coastal Zone
     C-Pertinent  Correspon

 Apr 18 2016 May 18 2016

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Lake Okeechobee Watershed Project Scoping Letter Final Scoping Letter Jun 28 2016

 

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Naples to Gordon Pass, Florida

Maintenance Dredging

Draft EA Draft FONSI Final EA/FONSI

March 2013

March 28, 2013

July 24, 2013

 

Picayune Strand Restoration Project   Design Refinements -larger area -tieback levee for pump stations -manatee mitigation feature EA/FONSI  November 2014  
Click here to expand contentClick here to collapse content  Dade

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Miami Harbor

GRR, Phase III, Feasibility Study

Study and EIS Vol 1, Append A-H Vol 1, Append I-M Vol 2, Append A-C Vol 2, Append D-F 

Feb 2004

 

Miami Harbor Deepening    -Incidental Harassment Authorization, Marine Mammal Protection Act -Biological Opinion, NMFS 

Jul 31 2012

Sep 8 2011 

 
Miami Harbor Ocean Dredged Material Disposal Site (ODMDS)    - Final EIS - Site Monitoring and Management Plan - Site Monitoring and Management Plan, Revised

August 1995

September 2008 &2011

 
Dade County Beach, Section 227 National Shoreline Erosion Control Development and Demonstration Program, Submerged Artificial Reef Training Structure   EA/FONSI  Feb 24 2011  
Dade County Beach Erosion Control and Hurricane Protection  Final Environmental Assessment and Limited Reevaluation Report

FONSI
EA

Main Report(LRR)
Appendices
     A-Engineering
     B-Cost
     C1-Cost(Haulover)
     C2-Cost(Sunny Isles)
     D-Geotechnical
     E-RealEstate
     F-Public Access
     G-Correspondence

Southeast Florida Sediment Assessment and Needs Determination (SAND) Study (link 90MB)

 

Mar 8, 2016

 

 

 

 

 

 

 

 

Sep 2014

 
Central and Southern Florida, 2012 Water Control Plan, Water Conservation Areas, Everglades National Park, and ENP South Dade Conveyance System  Temporary Deviation from Constraint at Water Gauge G-3273  

Draft FONSI/EA

Notice of Availability

Aug 2013

Aug 22 2013

 Sep 21 2013
Central and Southern Florida  G-3273 Constraint Relaxation/S356 Field Test and S-357N Operational Strategy

Notice of Availability Final EA/FONSI Appendices -A, Operational Strategy -B, Coastal Zone Consistency -C, Monitoring Plan -D1, Correspondence -D2, Correspondence

 

Feb 2004

May 2015

2015

Apr 5 2015
Modified Water Deliveries   8.5 Square Mile Area Record of Decision  Dec 6 2000  
Interim Operation Plan Final Supplemental Environmental Impact Statement (SEIS)   -Cover EIS -Final SEIS -Figures Appendices -A Court Order -B Scoping Documents -C Engineering -D Hydrograph WCA3A -E 404(b) Evaluation -F ESA Coordination -G Gov to Gov Coord -H Duke Declaration -I CommentsResponse Record of Decision Dec 22 2006 Feb 5 2007
Canal C-111  Expansion of Detention Area and Associated Features  EA and FONSI  Jun 6 2012  
Canal C-111 South Dade Modifications to the C-111 South Dade North and South Detention Areas and Associated Features  Final EA w/ FONSI
Appendices -A Biological Assessment -B 404(b) Evaluation -C CZMA -D Pertinent Correspondence
Jun 26 2016 
  C-111 South Dade Environmental Assessment and Proposed Finding of No Significant Impact: Modifications to the C-111 South Dade Project, L-31W Environmental Assessment
Appendices
  A-Biological Assessment
  B-Sec 404(b) CWA Eval
  C-CZMA
  D-Correspondence
Jul 2 2016 Aug 31 2016
  GRR and EIS

Main Text List Annex/Append Annexes -A -B through E -F through I Appendices -A through C -D through F

 
 1994  
C&SF, CERP, WCA 3   Decompartmental-ization, Physical Model  Notice of Availability Supplemental FONSI Correspondence with Fish and Wildlife Service

May 20 2015

Jul 8 2015 

 Jun 18 2014
Everglades Restoration Transition Plan (ERTP) Supplemental Biological Assessment  Main Text Appendices -A Biological Assessment      of October 2010. -B Annual Assessments,      2010 - 2015. -C Environmental      Assessment. G-3273      Constraint Relaxation/      S-356 Field Test and      S-357N Operational      Strategy. -D Conveyance System      Operational Guidance. -E Timeline. Modified      Water Deliveries,      Everglades National      Park and Canal 111.   Jul 24 2015  
Temporary Emergency Deviation WCA 3A  Environmental Assessment and FONSI 

Environmental Assessment and Appendices Notice of Availability

 
Feb 12 2016 Mar 18 2016
Temporary Emergency Deviation WCA 3A


 Supplemental Environmental Assessment and FONSI

Notice of Availability
Supplemental Environmental Assessment and FONSI
Appendices
    A-Operational Strategy
    B-Coastal Zone Consist
    C-Pertinent Correspon.
    D-Additional Info.

May 10 2016

Temporary Emergency Deviation to Alleviate High Water Levels in Water Conservation Area 3A (S-344 Deviation) Environmental Assessment and Finding of No Significant Impact Notice of Availability
EA and FONSI
Appendices
     A-Operational Strategy
     B-Coastal Zone
     C-Pertinent  Correspon


 Apr 18 2016  May 18 2016
Mt. Sinai Medical Center, Continuing 
Authority Program (CAP), Section 14
Mt. Sinai Medical Center, CAP, Section 14, Draft Integrated Feasibility Report and Environmental Assessment Main Report
 Appendices
  A-Engineering
  B-Cost
  C-Pertinent    
      Correspondence
  D1-404b
  D2-CZM
  D3-EnvSurveys
  D4-RealEstate


  Nov 28 2016

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

 

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Jacksonville Harbor O&M

Huguenot Park Lease Renewal

           
Draft EA/FONSI

Park Management Plan

December 2012

2008

 

   Bartram Island, Cell A, Erosion Control  Public Notice EA/FONSI  Feb. 21, 2014  March 10, 2014
Jacksonville Harbor, Draft Navigation Study, GRR2 Pre-Report Presentations, 2012  Overview - Ecological and Water Quality Modeling - Circulation and Salinity Modeling - Water Quality Modeling - Ecological Modeling, Preliminary  Oct. 22, 2012  
Jacksonville Harbor, Final Navigation Study, GRR2 Final GRR2 and Supplemental EIS Final Main Text
Record of Decision
March 7, 2014 April 7, 2014
  Appendices  A, Engineering B, Economics C, Real Estate D, Ecological Models - main text - Appendices E, Affects & Mitigation F, Pertinent Correspondance (scoping) G, CZM Consistency H, 404(b) evaluation I, Air Emissions J, DMMP K, Comments (on draft) - 1 Response to Comments - 2 NGO comments - 3 Public comments A - 4 Public comments B - 5 Agency comments L, EFH Report M, Coordination Act Report (CAR) N, Cost    
   
 Chief's Report
 Report Submitted for transmission to Congress  April 16, 2014  
  Salinity Effects on Nekton, Florida Fish and Wildlife Conservation Commission  Report June 25, 2013  
  Environmental Fluid Dynamics Code (EFDC) model  Literature Review, EFDC Model Application -Question EFDC

Nov. 6, 2014

November 2014

 
Jacksonville Harbor ODMDS Public Meeting 

Posters - Overview - Sidescan - Analysis - Site Designation

Meeting Presentation

 
 June 21, 2012  
   Draft EIS Main Text Appendices  May 25, 2012  July 9, 2012
Jacksonville Harbor, Mile Point  Navigation Study, Final Report and EA

Main Report

Appendices - A - B through F - G through H

 
 March 2012  
Duval County Beach Erosion Control Project Environmental Statement    Final  August 1974  
  Environmental Assessment with MMS FONSI of 3 May 1995  Dec. 22, 1993  
  Environmental Assessment  with FONSI   Jan. 27, 2005  
  BOEM EA on use of OCS Sand with BOEM FONSI of 4 Feb 2011 (link to boem.gov)   January 2011  
  New Borrow Site, BOEM as Cooperating Agency Withdraw Notice of Draft FONSI Sept. 18, 2014   
  New Borrow Site  Final EA and Signed FONSI  Oct. 1, 2015  
U.S. Marine Corps Support Facility, Blount Island Removal of Concrete Sill and Advance Maintenance Dredging Slipway  Environmental Assessment and FONSI   April 2010  

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Flagler County Hurricane Protection and Storm Damage Reduction Project

Final Integrated Feasibility Study and Environmental Assessment

           

FONSI 22 Jan 2016 Study/EA, Main Text Appendices - A, Engineering - B, Costs - C, Economics - D, Geotechnical - E, Real Estate - F, Environmental - G, Correspondence

Draft Chief's Report

September 2014

 

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Okeechobee Waterway

Lease for RV Park, Moore Haven Lock

EA/FONSI

Feb. 12, 2014           

 March 14, 2014

Herbert Hoover Dike (HHD)  Herbert Hoover Dike, Dam Safety Modification Study: Glades, Hendry, Martin, Okeechobee, and Palm Beach Counties, FL  

Draft EIS (Main Text) Appendices

 Dec. 24, 2015  Feb. 7, 2016
Lake Hicpochee Shallow Storage and Hydrologic Enhancement Lake Hicpochee, 408 Public Notice

Public Notice Apr 29 2016  
Lake Okeechobee Watershed Project Scoping Letter Final Scoping Letter
Jun 28 2016   

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Herbert Hoover Dike (HHD)

Herbert Hoover Dike, Dam Safety Modification Study: Glades, Hendry, Martin, Okeechobee, and Palm Beach Counties, FL            

       

Draft EIS (Main Text) Appendices

Dec. 24, 2015

 Feb. 7, 2016

Modifications to Operating Criteria for S-190 Environmental Assessment Draft EA
Appendices
     A-Operating Criteria
     B-Pertinent    
        Correspondence
      C-CZMA
      D-Model
      Documentation Report
Notice of Availability


25 Aug 2016 23 Oct 2016

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

 

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Lake Okeechobee Watershed Project Scoping Letter Final Scoping Letter Jun 28 2016

 

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Tampa Harbor O&M

Maintenance Dredging

           

Final EA

Oct. 7, 2011

 

   Tampa Harbor Dredged Material Management Plan Update  DMMP Update  April 8, 2011  
Tampa Harbor, Big Bend Improvements and Maintenance Dredging  
Final EA
 May 2014  

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

IWW Jacksonville to Miami

Dredged Material Management Area IR-2

Baseline Mitigation Report for IR-2 and SL-2

April 2013

 

    1st Annual Mitigation Monitoring Report -part 1 -part 2, photo documentation   April 2014  
  Maintenance Dredging Reach 1  Final EA  May 2014  
Click here to expand contentClick here to collapse content  Lee

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Ft. Myers Beach, Matanzas Pass, Navigation Project

Maintenance Dredging

EA/FONSI

Sept. 20, 2012

 

Lee County Shore Protection Project   Captiva Island, FCCE  Final FONSI and Notice of Availability March 11, 2013  
 Lee County Shore Protection Project  Captiva Island, FCCE  
Signed FONSI
March 27, 2013  
 Lee County Shore Protection Project Captiva and Sanibel Islands  FONSI  Feb. 2, 1996  

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Manatee County Shore Protection

Anna Maria Island, FCCE

           

EA/FONSI

June 2013

 

 Manatee Harbor Feasibility Study   Meetings, Notices, and other Project Information    
     Revised Date of Public Meeting  Jan. 20, 2016  

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Herbert Hoover Dike (HHD)

Herbert Hoover Dike, Dam Safety Modification Study: Glades, Hendry, Martin, Okeechobee, and Palm Beach Counties, FL            

Draft EIS (Main Text)   
Appendices        

Dec. 24, 2015

 Feb. 7, 2016

St. Lucie Inlet Intracoastal Waterway and Okeechobee Waterway   Placement of Intracoastal Waterway and Okeechobee Waterway Dredged Material in the St. Lucie Inlet Sediment Impoundment Basin St. Lucie IWW Crossroads Final EA w/ Signed FONSI  Jan. 2016  
Dredged Material Management Area Construction O-7 Intracoastal Waterway, Martin Co. EA w/ Signed FONSI February 29, 2016  
Lake Okeechobee Watershed Project Scoping Letter Final Scoping Letter Jun 28 2016   

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

 

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Nassau County Shore Protection Project

           

Final EA

Updated FONSI

Feb. 1999

Dec. 27, 2005

 

Fernandina Harbor  Maintenance Dredging ( including use of ODMDS)  Environmental Assessment and FONSI  May 2000  
Kings Bay Navy Submarine Base Maintenance Dredging Statement of Findings, Department of the Army Permit   June 4, 2014  

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Herbert Hoover Dike (HHD)

Herbert Hoover Dike, Dam Safety Modification Study: Glades, Hendry, Martin, Okeechobee, and Palm Beach Counties, FL            

           

Draft EIS (Main Text) Appendices

Dec. 24, 2015

 Feb. 7, 2016

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Lake Tohopekaliga Extreme Drawdown and Habitat Enhancement

Final EIS

Vol 1 EIS Vol 2 Integrated Surface and Groundwater Model

June 2002

 

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Palm Beach Harbor

Port Everglades and Palm Beach Harbor, Ocean Dredged Material Disposal Site (ODMDS)

Final EIS

July 2004

 

Palm Beach Harbor, Lake Worth Inlet Operations and Maintenance (O&M)  FONSI
EA
 Oct 13, 2015  
Lake Worth Inlet, Palm Beach Harbor Final Feasibility Report and Environmental Impact Statement

Main Text Errata

Appendices A-Engineering  -A1, Plates  -A2, Hydrodynamic Modeling, Ship Simulation, Geotechnical, and Value Engineering   -A3, Boring Logs and Laboratory Results B-Cost Engineering and Risk Analysis and C, Socio-Economics D-Environmental E-Correspondence  -E1, Agency and Tribe  -E2, 9 May 2013 Public Meeting, Comment and Response Tables, Public Comments  -E3, Public Comments Continued F, Real Estate and G, Preliminary Assessment, Dredged Material Management

 
 Feb. 7, 2014 March 10, 2014
Palm Beach County Shore Protection Project Jupiter-Carlin Segment, FCCE  EA and FONSI  July 25, 2013  
Palm Beach County Shore Protection Project North Boca Raton, Delray Beach, and Ocean Ridge EA/FONSI

Signed FONSI

Aug. 16, 2013

Aug. 16, 2013

 
Herbert Hoover Dike (HHD) Supplemental Major Rehabilitation Report Final EA and FONSI   June 15, 2015  
  Herbert Hoover Dike, Dam Safety Modification Study: Glades, Hendry, Martin, Okeechobee, and Palm Beach Counties, FL Draft EIS (Main Text) Appendices  Dec. 24, 2015  Feb. 7, 2016

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Pinellas County Shore Protection Project

Sand Key

EA

May 5, 2011

 

Pinellas County Shore Protection Project Treasure Island FCCE nourishment Notice of Availability Final FONSI  April 10, 2013  
Pinellas County Shore Protection Project Treasure Island and Long Key FCCE and Supplemental Signed FONSI  June 17, 2013  

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Sarasota County Beach Erosion Control

Venice Beach

NOA draft FONSI/EA EA through Append B EA, Appendices C-E

April 15, 2014

 May 15, 2014

     Final EA and FONSI  July 2, 2014  
   Lido Key  EA and Feasibility Report - main text w/2004 addendum - Environmental Assessment - Appendices

 Oct. 2002 with April 2004 addendum

 
     

Study of Big Sarasota Pass Sediment Mining Alternatives, Draft

GENESIS Shoreline Modeling Study

           

 

June 11, 2014

May 2014

 
   Lido Key Additional Sand Sources  

EA through Appendix F

Appendix G, Mining Alternatives Study

Appendix H, Sediment Compatibility Analysis

March 30, 2015  May 14, 2015
     Notice of Availability, FONSI/EA March 30, 2015  May 14, 2015

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

St. Augustine Inlet and Intracoastal Waterway

Maintenance Dredging, Beach and Nearshore Placement North of Inlet

Final Supplem EA/FONSI                     

July 8, 2015

 

   Maintenance Dredging, Includes inlet maintenance dredging for regional sediment management and beneficial use of the dredged material           
 EA FONSI

Nov 2010

Jan 19 2011

 
St. Johns County Coastal Storm Risk Management Project  Evaluating the for providing coastal storm damage reduction to the South Ponte Vedra Beach, Vilano Beach, and Summer Haven reaches of the St. Johns County Coastal Storm Risk Management project.  Main Text
 Appendices
 A-Engineering
 B-Cost Engineering and Risk Analysis
C-Economics
D-Geotechnical
E-Real Estate Plan
F-Public Access and Cost Sharing
G1-404(B) Evaluation       G2-Coastal Zone Management
G3-Pertinent Correspondence
G4-Mailing List                
 Feb 17 2016  Apr 4 2016

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

IWW, Jacksonville to Miami

Dredged Material Management Area SL-2

Baseline Mitigation Report for IR-2 and SL-2

April 2013

 

 
 Maintenance Dredging, St. Lucie County Reach I and part of Reach II  Final EA and Signed FONSI  May 2014  
 Ft. Pierce Harbor

 Maintenance Dredging  Final EA and Signed FONSI  July 24,1996  
Ten Mile Creek Water Preserve Area Critical Project Environmental Assessment and Finding of No Significant Impact Final EA and Signed FONSI  April 15 2016  
St. Lucie County Coastal Storm Risk Management Project (CSRM)  Draft Integrated Feasibility Study and Environmental Assessment

Draft Integrated Feasibility Study and Environmental Assessment
     Appendices
         A-Engineering
         B-Cost Engineering
         C-Economics
         D-Geo-technical
         E-Real Estate Plan
         F-PublicAcc_CostSh
         G-Environmental
         H-Pert_Correspond
         I-ValueEngineering
Reference_Maps


Apr 2016  
Lake Okeechobee Watershed Project  Scoping Letter  Final Scoping Letter Jun 28 2016  

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Ponce de Leon Inlet, Operations and Maintenance

Maintenance Dredging

EA

Final EA/FONSI

Feb 2013

Jun 26, 2013

 

Key

NOI = Notice of Intent
NOA = Notice of Availability
PN = Public Notice
EIS =Environmental Impact Statement
EA = Environmental Assessment
FONSI = Finding of No Significant Impact
GRR = General Reevaluation Report
LRR = Limited Reevaluation Report
PAC = Post Authorization Change
DDR = Detailed Design Report
EDR = Engineering Design Report

Date Issued = Date of Notice
TBP = To Be Posted
Date Due = Date of Public Meeting, Hearing, or Workshop where applicable. Otherwise, date comments due.

Contact

904-232-2168