Naval Sea Systems Command

 

 

DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE, DISTRIBUTION IS UNLIMITED.

The FY-17 Standard Items and Standard Phraseology shall be invoked for all CNO availabilities with an availability start date in FY-17 and in all other (CMAV and emergent) new procurements issued after 01 March 2016.

Download FY17 (CH-1) NSI Package

Download FY17 NSI Package

FY 17  (CH-1) Release Letter

 

FY 17 Release Letter

NAVSEA STANDARD ITEMS

Item No.

Title

Utilization Category

Date

INDEX

FY17 (CH-1) Standard Item Index

 

009-01

General Criteria; accomplish

I

30 JUL 2015

 

009-02

Environmental Compliance Reports for Material Usage at Naval Facilities; provide

I

18 JUL 2014

 

009-03

Toxic and Hazardous Substances; control

I

18 JUL 2014

 

009-04

Quality Management System; provide

I

30 JUL 2015

 

 009-04
CH-1

 Quality Management System; provide

 I

 12 MAY 2016

 

009-05

Temporary Accesses; provide

I

30 JUL 2015

 

009-06

Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

I

30 JUL 2015

 

009-07

Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish

I

30 JUL 2015

 

009-08

Fire Protection at Contractor's Facility; accomplish

I

30 JUL 2015

 

009-09

Process Control Procedure (PCP); provide and accomplish

II

18 JUL 2014

 

009-10

Shipboard Asbestos-Containing Material (ACM); control

I

18 JUL 2014

 

009-11

Insulation and Lagging Requirements; accomplish

II

30 JUL 2015

 

009-12

Welding, Fabrication, and Inspection Requirements; accomplish

II

30 JUL 2015

 

009-13

Meters; repair and certify calibration

II

30 JUL 2015

 

009-14

Gages, Switches, and Thermometers; repair and certify calibration

II

30 JUL 2015

 

009-15

Rotating Machinery; balance

II

17 JAN 2013

 

009-16

Electronic Equipment; repair

II

29 JUL 2011

 

009-17

Rotating Electrical Equipment; repair

II

30 JUL 2015

 

009-18

Magnetic Material; control

I

18 JUL 2014

 

009-19

Provisioning Technical Documentation (PTD); provide

I

30 JUL 2015

 

009-20

Government Property; control

I

18 JUL 2014

 

009-21

Logistics and Technical Data; provide

I

18 JUL 2014

 

009-22

Shipboard Electric Cable; test

II

30 JUL 2015

 

009-23

Interferences; remove and install

I

30 JUL 2015

 

009-24

Shipboard Authorization, Control, Isolation, Blanking, Tagging and Cleanliness Requirements; accomplish

I

30 JUL 2015

 

009-25

Structural Boundary Test; accomplish

II

30 JUL 2015

 

009-26

Deck Covering Requirements; accomplish

II

18 JUL 2014

 

 009-26
CH-1

 Deck Covering Requirements; accomplish

 II

 12 MAY 2016

 

009-27

Material Identification and Control (MIC) for Level I Systems; accomplish

II

30 JUL 2015

 

009-28

Fire Prevention Requirements; accomplish

I

30 JUL 2015

 

009-29

Asbestos‑Free Pipe Hanger Liner Material; install

I

29 JUL 2004

 

009-30

Boiler Sample Tubes; inspect

II

29 JUL 2011

 

009-31

Boiler Waterjet Cleaning; accomplish

II

18 JUL 2014

 

009-32

Cleaning and Painting Requirements; accomplish

II

10 JUL 2015

 

 009-32
CH-1

 Cleaning and Painting Requirements; accomplish

 II

 12 MAY 2016

 

009-33

Rotating Electrical Equipment; rewind

II

30 JUL 2015

 

009-34

Fire Protection of Unmanned Vessels at Contractor's Facility; provide

I

17 JAN 2013

 

009-35

Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish

I

30 JUL 2015

 

009-36

Controller; repair

II

30 JUL 2015

 

009-37

General Procedures for Woodwork; accomplish

II

30 JUL 2015

 

009-38

Boiler, Catapult Accumulator, and Reboiler Dry Lay-up; accomplish

II

30 JUL 2015

 

009-39

Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/Component; provide

I

30 JUL 2015

 

009-40

Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish

I

18 JUL 2014

 

009-41

Technical Manual Contract Requirement (TMCR) for a Topically Structured Technical Manual; provide

II

30 JUL 2015

 

009-42

Technical Manual Contract Requirement (TMCR) for Updating Technical Manuals; provide

II

30 JUL 2015

 

009-43

Engineering Plant Production Completion Date (PCD), Light-Off Assessment (LOA) Support; provide

II

30 JUL 2015

 

009-44

Cancelled 18 JUL 2014

 

009-45

Tapered Plug Valve; repair

II

29 JUL 2011

 

009-46

Butterfly Valve, Synthetic and Metal Seated; repair

II

18 JUL 2014

 

009-47

Gate Valve; repair

II

18 JUL 2014

 

009-48

Pressure Seal Bonnet Valve; repair (shop)

II

29 JUL 2011

 

009-49

Pressure Seal Bonnet Valve; repair (in-line)

II

29 JUL 2011

 

009-50

Horizontal Swing Check Valve; repair

II

29 JUL 2011

 

009-51

Globe, Globe Angle, and Globe Stop Check Valve; repair

II

17 JAN 2013

 

009-52

Relief Valve; repair

II

30 JUL 2015

 

009-53

Bolted Bonnet Steam Valve; repair (shop)

II

29 JUL 2011

 

009-54

Bolted Bonnet Steam Valve; repair (in-line)

II

30 JUL 2010

 

009-55

Regulating/Reducing Valve; repair

II

30 JUL 2010

 

009-56

Main Propulsion Boiler Wet Lay-up; accomplish

II

18 JUL 2014

 

009-57

Reduction Gear Security Requirements; accomplish

II

30 JUL 2015

 

009-58

Pump and Driver Shaft Alignment; accomplish

II

01 SEP 2015

 

009-59

Organotin Antifouling Materials; control

I

29 JUL 2011

 

009-60

Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage

I

01 SEP 2015

 

009-61

Shipboard Use of Fluorocarbons; control

I

18 JUL 2014

 

009-62

Boiler Handhole and Manhole Seats and Plates; inspect

II

29 JUL 2011

 

009-63

Lubricating Oils and Hydraulic Fluids; analyze

II

18 JUL 2014

 

009-64

Synthetic Fire Resistant Hydraulic Fluid; control

I

18 JUL 2014

 

009-65

Polychlorinated Biphenyls (PCBs); control

I

29 JUL 2011

 

009-66

Cancelled 18 JUL 2014

 

009-67

Integrated Total Ship Testing; manage

I

18 JUL 2014

 

009-68

Bolted Bonnet Valve; repair

II

29 JUL 2011

 

009-69

Heavy Weather/Mooring Plan; provide

I

30 JUL 2015

 

009-70

Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

I

30 JUL 2015

 

009-71

Testing Requirements for Piping Systems; accomplish

II

10 JUL 2015

 

009-72

Physical Security at Private Contractor's Facility; accomplish

I

18 JUL 2014

 

009-73

Shipboard Electrical/Electronic Cable; remove, relocate, repair, and install                                       

I

30 JUL 2015

 

009-74

Occupational, Safety and Health Requirements; accomplish

I

30 JUL 2015

 

009-75

Circuit Breaker; repair

II

30 JUL 2015

 

009-76

Waveguide and Transmission Line Temporary Lay-Up, Pressurization,

and Purging; accomplish

II

30 JUL 2015

 

009-77

Cofferdam Requirements; accomplish

I

18 JUL 2014

 

009-78

Passive Countermeasures System (PCMS) Material Repair/ Installation Requirements; accomplish

II

30 JUL 2015

 

009-79

Government Owned Material (GOM); status reporting

I

18 JUL 2014

 

009-80

Ship's Facilities; provide

I

18 JUL 2014

 

009-81

Compartment Closeout; accomplish

I

30 JUL 2015

 

009-82

Data Requirements When Installing an Equal Component Vice Specified Component; provide

I

29 JUL 2011

 

009-83

Wire Rope Fitting Verification; provide

I

17 JAN 2013

 

009-84

Accountability of Temporary Fasteners; provide

I

18 JUL 2014

 

009-85

Government Sponsored Planning Yard/Configuration Data Manager (CDM) On-Site Representative Facility; provide

II

19 JUL 2007

 

009-86

Recovery of Chlorofluorocarbon (CFC's) and Fire Suppressant Halon (H) Materials; accomplish

I

01 AUG 2008

 

009-87

Chemical Disinfection Procedures; accomplish

I

18 JUL 2014

 

009-88

Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify

I

18 JUL 2014

 

009-89

Purchase and Inspection Requirements for Contractor Furnished Anodes; accomplish

I

29 JUL 2011

 

009-90

Technical Representative; provide

II

18 JUL 2014

 

009-91

Propeller In-Place Inspection; accomplish

II

07 NOV 2013

 

009-92

Resilient Mount; remove and install

II

30 JUL 2015

 

009-93

Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

I

18 JUL 2014

 

009-94

General Environmental Requirements for Work at Contractor's Facility; accomplish

I

17 JAN 2013

 

009-95

Mechanically Attached Fittings (MAFs) for Piping Systems; install

I

18 JUL 2014

 

009-96

Ball Valve; repair

II

29 JUL 2011

 

009-97

Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide

I

17 JAN 2013

 

009-98

Monel Fasteners; inspect

II

18 JUL 2014

 

009-99

Ship Departure Report; provide

I

18 JUL 2014

 

009-100

Ship's Stability Process Control Procedure (PCP); maintain

I

18 JUL 2014

 

009-101

Requirements for Entry to, and Departure from Contractor's Facility; accomplish

I

18 JUL 2014

 

009-102

Alteration Verification; provide

I

29 JUL 2011

 

009-103

Weight and Moment Change Data; provide

I

18 JUL 2014

 

009-104

Vibration Testing and Analysis; accomplish

II

18 JUL 2014

 

009-105

Thermal Sprayed Coatings for Machinery Component Repair; accomplish

II

30 JUL 2015

 

009-106

Work Authorization Form Coordinator (WAFCOR); provide

I

06 JAN 2014

 

009-107

Piping System Cleanliness Restoration (Non-Nuclear); accomplish

II

30 JUL 2015

 

009-108

Aircraft Carrier Requirements for Entry to, Movement within, and Departure from Contractor's Facility; accomplish

I

18 JUL 2014

 

009-109

Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels; accomplish

I

18 JUL 2014

 

009-110

Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish

I

18 JUL 2014

 

009-111

Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

I

30 JUL 2015

 

009-112

Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish

I

18 JUL 2014

 

009-113

Rotating Electrical Equipment with Sealed Insulation Systems (SIS); rewind

II

30 JUL 2015

 

009-114

Mold Remediation; accomplish

II

07 NOV 2013

 

009-115

Bearing Rebabbitting; accomplish

II

30 JUL 2015

 

009-116

Auxiliary and Waste Heat Boiler Sodium Nitrite Wet Lay-up; accomplish

II

30 JUL 2015

 

009-117

Support for Combat Systems Light-Off; provide

II

18 JUL 2014

 

009-118

CG Deck Loading; accomplish

I

18 JUL 2014

 

009-119

Cancelled 18 JUL 2014

 

009-120

Fact Finding and Critique of Unplanned Events; manage

I

30 JUL 2015

 

009-121

Ship Assessment/Inspection Requirements; provide

I

18 JUL 2014

 

009-122 

Temporary Padeye; install and remove

I

30 JUL 2015

 

009-123

Fiber Optic System; remove, relocate, repair, and install

II

30 JUL 2015

 

SSRAC STANDARD WORK TEMPLATES

 

077-01

Hazardous Waste Produced On Naval Vessels; control

17 JAN 2013

 

992-31

Cleaning and Pumping; accomplish

 30 JUL 2015


Staying Connected