- TSRA Phase One
consists of a pre-availability /pre-deployment assessments of structural
and other slow-to-degrade systems including most “life-cycle” material assessments
- TSRA Phase Two
consists of post-deployment/pre-availability assessments of propulsion,
auxiliary and Command, Control, Communications, Computers,
Collaboration, and Intelligence (C5I) systems in order to identify
growth and new work candidates prior to Chief of Naval Operations (CNO)
availabilities
|
- TSRA Phase
Three runs concurrently with a CNO availability and consists of
tank/void assessments, and other selected systems which are best
conducted in an availability and supports sea trial readiness
- TSRA Phase
Four is a post-availability/pre basic phase assessment, which ensures
ship material readiness to support basic phase training and operations
- TSRA Phase
Five is a pre-deployment assessment, preparing a ship for
advanced/integrated training and deployment operations
|
|