HEADQUARTERS

Home
Home > Media > Images

Image Gallery

Work on the Algiers Lock continued in June, as workers descended on the dewatered structure to complete repairs.
Algiers Lock Repair
7/9/2013 8:51:00 AM
The removal of 890 cubic yards of limestone from the navigation channel on the Mississippi River near Thebes, Ill., began Dec. 17, 2012. This is just one phase of the action the Corps is taking to improve the navigation channel for the river industry.
Powerful equipment
1/4/2013 12:23:00 PM
A barge makes its way through the McKlellan-Kerr Arkansas River Navigation System lock and dam. Reducing the MKARNS hours of operations is just one of the ways the U.S. Army Corps of Engineers Southwestern Division is looking to reduce costs as part of the civil works transformation. Currently, the MKARNS runs 24 hours a day, seven days a week.
Barge Heading Down Arkansas River
10/18/2012 10:45:00 AM