Windows that have been removed from a building are stacked and saved for sale or reuse.
Window storage
10/19/2015 5:05:00 PM
Deconstruction techniques do not always look significantly different from traditional demolition techniques to the untrained eye.
Demolition
10/19/2015 5:05:00 PM
FORT HUNTER LIGGIT, Calif. - USACE, Fort Hunter Liggitt installation representatives, and architectural engineering (AE) contractors performing an energy and sustainabilty charrette for a new Organizational Readiness and Training Complex (ORTC).
Energy & Sustainability Charrette
9/23/2015 4:03:00 PM
FORT SHERIDAN, Ill. - Site and building layout diagrams developed during brainstorming as part of the preparation for an energy charrette for U.S. Army Reserve Command (USARC), Fort Sheridan, IL.
Brainstorming site and building layout
9/23/2015 4:03:00 PM
FORT SHERIDAN, Ill. - List of features and systems to evaluate resulting from brainstorming as part of the preparation for an energy charrette for U.S. Army Reserve Command (USARC), Fort Sheridan, IL.
Brainstorming Design Features
9/23/2015 4:03:00 PM
Spray foam has been installed on the interior wall and cut out for installation of a heating, ventilating and air conditioning (HVAC) grille.
Spray foam wall cut
9/21/2015 5:44:00 PM
A geothermal wellfield was sized for 100% of the building load for the Sustainment Brigade Administrative Facility, Fort Campbell, KY. The wellfield consists of 69 boreholes, each with a depth of 415 feet. The facility is 30,900 square feet with air handlers and variable air volume (VAV) boxes with hot water reheat served by water-to-water heat pumps. The project is designed for 36.97% energy cost savings from ASHRAE 90.1-2007 baseline and 49.68% energy consumption savings from ASHRAE 90.1-2007 baseline without process loads. The facility is designed to achieve LEED Gold Certification.
Sustainment Brigade Administrative Facility, Fort Campbell, Ky.
9/4/2015 4:48:00 PM
Testing and balancing technician set-up to measure flow rate and temperature of the fluid. This typically occurs during the construction phase of the commissioning process.
Water-side test and balance set-up
8/31/2015 5:56:00 PM