|
|
NAVSEA Standard Items
|
Item No.
|
Title
|
Utilization Category
|
Date
|
INDEX
|
FY 16 (CH-2) Standard Item Index
|
|
|
009-01
|
General Criteria; accomplish
|
I
|
18 JUL 2014
|
009-02
|
Environmental Compliance Reports for Material Usage at Naval Facilities; provide
|
I
|
18 JUL 2014
|
009-03
|
Toxic and Hazardous Substances; control
|
I
|
18 JUL 2014
|
009-04
|
Quality Management System; provide
|
I
|
18 JUL 2014
|
009-05
|
Temporary Accesses; provide
|
I
|
18 JUL 2014
|
009-06
|
Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish
|
I
|
18 JUL 2014
|
009-07
|
Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish
|
I
|
18 JUL 2014
|
009-08
|
Fire Protection at Contractor's Facility; accomplish
|
I
|
18 JUL 2014
|
009-09
|
Process Control Procedure (PCP); provide and accomplish
|
II
|
18 JUL 2014
|
009-10
|
Shipboard Asbestos-Containing Material (ACM); control
|
I
|
18 JUL 2014
|
009-11
|
Insulation and Lagging Requirements; accomplish
|
II
|
18 JUL 2014
|
009-12
|
Welding, Fabrication, and Inspection Requirements; accomplish
|
II
|
18 JUL 2014
|
009-12
CH-2 |
Welding, Fabrication, and Inspection Requirements; accomplish
|
II |
01 SEP 2015 |
009-13
|
Meters; repair and certify calibration
|
II
|
18 JUL 2014
|
009-14
|
Gages and Thermometers; repair and certify calibration
|
II
|
18 JUL 2014
|
009-15
|
Rotating Machinery; balance
|
II
|
17 JAN 2013
|
009-16
|
Electronic Equipment; repair
|
II
|
29 JUL 2011
|
009-17
|
Rotating Electrical Equipment; repair
|
II
|
18 JUL 2014
|
009-18
|
Magnetic Material; control
|
I
|
18 JUL 2014
|
009-19
|
Provisioning Technical Documentation (PTD); provide
|
I
|
18 JUL 2014
|
009-20
|
Government Property; control
|
I
|
18 JUL 2014
|
009-21
|
Logistics and Technical Data; provide
|
I
|
18 JUL 2014
|
009-22
|
Shipboard Electric Cable; test
|
II
|
18 JUL 2014
|
009-23
|
Interferences; remove and install
|
I
|
18 JUL 2014
|
009-24
|
Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish
|
I
|
18 JUL 2014
|
009-24
CH-1
|
Shipboard Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish
|
I
|
10 JUL 2015
|
009-25
|
Structural Boundary Test; accomplish
|
II
|
18 JUL 2014
|
009-26
|
Deck Covering Requirements; accomplish
|
II
|
18 JUL 2014
|
009-27
|
Material Identification and Control (MIC) for Level I Systems; accomplish
|
II
|
18 JUL 2014
|
009-28
|
Fire Prevention Requirements; accomplish
|
I
|
10 JUN 2014
|
009-29
|
Asbestos-Free Pipe Hanger Liner Material; install
|
I
|
29 JUL 2004
|
009-30
|
Boiler Sample Tubes; inspect
|
II
|
29 JUL 2011
|
009-31
|
Boiler Waterjet Cleaning; accomplish
|
II
|
18 JUL 2014
|
009-32
|
Cleaning and Painting Requirements; accomplish
|
II
|
07 NOV 2013
|
009-32
CH-1
|
Cleaning and Painting Requirements; accomplish
|
II
|
10 JUL 2015
|
009-33
|
Rotating Electrical Equipment; rewind
|
II
|
18 JUL 2014
|
009-34
|
Fire Protection of Unmanned Vessels at Contractor's Facility; provide
|
I
|
17 JAN 2013
|
009-35
|
Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish
|
I
|
18 JUL 2014
|
009-36
|
Controller; repair
|
II
|
18 JUL 2014
|
009-37
|
General Procedures for Woodwork; accomplish
|
II
|
18 JUL 2014
|
009-38
|
Boiler, Catapult Accumulator and Reboiler Dry Lay up; accomplish
|
II
|
17 JAN 2013
|
009-39
|
Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/Component; provide
|
I
|
19 JUL 2007
|
009-40
|
Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish
|
I
|
18 JUL 2014
|
009-41
|
Technical Manual Contract Requirement (TMCR) for a Topically Structured Technical Manual; provide
|
II
|
19 JUL 2007
|
009-42
|
Technical Manual Contract Requirement (TMCR) for Updating Technical Manuals; provide
|
II
|
19 JUL 2007
|
009-43
|
Engineering Plant Production Completion Date (PCD), Light-Off Assessment (LOA) Support; provide
|
II
|
18 JUL 2014
|
009-44
|
Cancelled 18 JUL 2014
|
|
|
009-45
|
Tapered Plug Valve; repair
|
II
|
29 JUL 2011
|
009-46
|
Butterfly Valve, Synthetic and Metal Seated; repair
|
II
|
18 JUL 2014
|
009-47
|
Gate Valve; repair
|
II
|
18 JUL 2014
|
009-48
|
Pressure Seal Bonnet Valve; repair (shop)
|
II
|
29 JUL 2011
|
009-49
|
Pressure Seal Bonnet Valve; repair (in-line)
|
II
|
29 JUL 2011
|
009-50
|
Horizontal Swing Check Valve; repair
|
II
|
29 JUL 2011
|
009-51
|
Globe, Globe Angle, and Globe Stop Check Valve; repair
|
II
|
17 JAN 2013
|
009-52
|
Relief Valve; repair
|
II
|
29 JUL 2011
|
009-53
|
Bolted Bonnet Steam Valve; repair (shop)
|
II
|
29 JUL 2011
|
009-54
|
Bolted Bonnet Steam Valve; repair (in-line)
|
II
|
30 JUL 2010
|
009-55
|
Regulating/Reducing Valve; repair
|
II
|
30 JUL 2010
|
009-56
|
Main Propulsion Boiler Wet Lay-up; accomplish
|
II
|
18 JUL 2014
|
009-57
|
Reduction Gear Security Requirements; accomplish
|
II
|
18 JUL 2014
|
009-58
|
Pump and Driver Shaft Alignment; accomplish
|
II
|
18 JUL 2014
|
009-58
CH-2 |
Pump and Driver Shaft Alignment; accomplish
|
II |
01 SEP 2015 |
009-59
|
Organotin Antifouling Materials; control
|
I
|
29 JUL 2011
|
009-60
|
Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage
|
I
|
18 JUL 2014
|
009-60
CH-2 |
Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage
|
I |
01 SEP 2015
|
009-61
|
Shipboard Use of Fluorocarbons; control
|
I
|
18 JUL 2014
|
009-62
|
Boiler Handhole and Manhole Seats and Plates; inspect
|
II
|
29 JUL 2011
|
009-63
|
Lubricating Oils and Hydraulic Fluids; analyze
|
II
|
18 JUL 2014
|
009-64
|
Synthetic Fire Resistant Hydraulic Fluid; control
|
I
|
18 JUL 2014
|
009-65
|
Polychlorinated Biphenyls (PCBs); control
|
I
|
29 JUL 2011
|
009-66
|
Cancelled 18 JUL 2014
|
|
|
009-67
|
Integrated Total Ship Testing; manage
|
I
|
18 JUL 2014
|
009-68
|
Bolted Bonnet Valve; repair
|
II
|
29 JUL 2011
|
009-69
|
Heavy Weather/Mooring Plan; provide
|
I
|
18 JUL 2014
|
009-70
|
Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish
|
I
|
18 JUL 2014
|
009-71
|
Testing Requirements for Piping Systems; accomplish
|
II
|
18 JUL 2014
|
009-71
CH-1
|
Testing Requirements for Piping Systems; accomplish
|
II
|
10 JUL 2015
|
009-72
|
Physical Security at Private Contractor's Facility; accomplish
|
I
|
18 JUL 2014
|
009-73
|
Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install
|
I
|
18 JUL 2014
|
009-74
|
Occupational, Safety and Health Requirements; accomplish
|
I
|
18 JUL 2014
|
009-74
CH-1
|
Occupational, Safety and Health Requirements; accomplish
|
I
|
10 JUL 2015
|
009-75
|
Circuit Breaker; repair
|
II
|
29 JUL 2011
|
009-76
|
Waveguide and Transmission Line Temporary Lay-Up, Pressurization, and Purging; accomplish
|
II
|
29 JUL 2011
|
009-77
|
Cofferdam Requirements; accomplish
|
I
|
18 JUL 2014
|
009-78
|
Passive Countermeasures System (PCMS) Material Repair/Installation Requirements; accomplish
|
II
|
07 NOV 2013
|
009-79
|
Government Owned Material (GOM); status reporting
|
I
|
18 JUL 2014
|
009-80
|
Ship's Facilities; provide
|
I
|
18 JUL 2014
|
009-81
|
Compartment Closeout; accomplish
|
I
|
18 JUL 2014
|
009-82
|
Data Requirements When Installing an Equal Component Vice Specified Component; provide
|
I
|
29 JUL 2011
|
009-83
|
Wire Rope Fitting Verification; provide
|
I
|
17 JAN 2013
|
009-84
|
Accountability of Temporary Fasteners; provide
|
I
|
18 JUL 2014
|
009-85
|
Government Sponsored Planning Yard/Configuration Data Manager (CDM) On-Site Representative Facility; provide
|
II
|
19 JUL 2007
|
009-86
|
Recovery of Chlorofluorocarbon (CFC's) and Fire Suppressant Halon (H) Materials; accomplish
|
I
|
01 AUG 2008
|
009-87
|
Chemical Disinfection Procedures; accomplish
|
I
|
18 JUL 2014
|
009-88
|
Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify
|
I
|
18 JUL 2014
|
009-89
|
Purchase and Inspection Requirements for Contractor Furnished Anodes; accomplish
|
I
|
29 JUL 2011
|
009-90
|
Technical Representative; provide
|
II
|
18 JUL 2014
|
009-91
|
Propeller In-Place Inspection; accomplish
|
II
|
07 NOV 2013
|
009-92
|
Resilient Mount; remove and install
|
II
|
18 JUL 2014
|
009-93
|
Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide
|
I
|
18 JUL 2014
|
009-94
|
General Environmental Requirements for Work at Contractor's Facility; accomplish
|
I
|
17 JAN 2013
|
009-95
|
Mechanically Attached Fittings (MAFs) for Piping Systems; install
|
I
|
18 JUL 2014
|
009-96
|
Ball Valve; repair
|
II
|
29 JUL 2011
|
009-97
|
Ship Building and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coatings Information; provide
|
I
|
17 JAN 2013
|
009-98
|
Monel Fasteners; inspect
|
II
|
18 JUL 2014
|
009-99
|
Ship Departure Report; provide
|
I
|
18 JUL 2014
|
009-100
|
Ship's Stability Process Control Procedure (PCP); maintain
|
I
|
18 JUL 2014
|
009-101
|
Requirements for Entry to and Departure from Contractor's Facility; accomplish
|
I
|
18 JUL 2014
|
009-102
|
Alteration Verification; provide
|
I
|
29 JUL 2011
|
009-103
|
Weight and Moment Change Data; provide
|
I
|
18 JUL 2014
|
009-104
|
Vibration Testing and Analysis; accomplish
|
II
|
18 JUL 2014
|
009-105
|
Thermal Sprayed Coatings for Machinery Component Repair; accomplish
|
II
|
18 JUL 2014
|
009-106
|
Work Authorization Form Coordinator (WAFCOR); provide
|
I
|
06 JAN 2014
|
009-107
|
Piping System Cleanliness (Non-Nuclear); accomplish
|
II
|
18 JUL 2014
|
009-108
|
Aircraft Carrier Requirements for Entry to, Movement within, and Departure from Contractor's Facility; accomplish
|
I
|
18 JUL 2014
|
009-109
|
Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels; accomplish
|
I
|
18 JUL 2014
|
009-110
|
Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish
|
I
|
18 JUL 2014
|
009-111
|
Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage
|
I
|
18 JUL 2014
|
009-112
|
Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish
|
I
|
18 JUL 2014
|
009-113
|
Rotating Electrical equipment with Sealed Insulation Systems (SIS); rewind
|
II
|
18 JUL 2014
|
009-114
|
Mold Remediation; accomplish
|
II
|
07 NOV 2013
|
009-115
|
Bearing Rebabbitting; accomplish
|
II
|
18 JUL 2014
|
009-116
|
Auxiliary and Waste Heat Boiler Sodium Nitrite Wet Lay-up; accomplish
|
II
|
18 JUL 2014
|
009-117
|
Support for Combat Systems Light-Off; provide
|
II
|
18 JUL 2014
|
009-118
|
CG Deck Loading; accomplish
|
I
|
18 JUL 2014
|
009-119
|
Cancelled 18 JUL 2014
|
II
|
18 JUL 2014
|
009-120
|
Fact Finding and Critique of Unplanned Events; manage
|
I
|
18 JUL 2014
|
009-121
|
Ship Assessment/Inspection Requirements; provide
|
I
|
18 JUL 2014
|
SSRAC STANDARD WORK TEMPLATES
|
077-01
|
Hazardous Waste Produced On Naval Vessels; control
|
17 JAN 2013
|
992-31
|
Cleaning and Pumping; accomplish
|
19 SEP 2013
|