009-01
|
General Criteria; accomplish
|
I
|
|
xx NOV 2016
|
009-02
|
Environmental Compliance Reports for Material Usage at Naval Facility; accomplish
|
I
|
|
xx NOV 2016
|
009-03
|
Toxic and Hazardous Substances; control
|
I
|
|
xx NOV 2016
|
009-04
|
Quality Management System; provide
|
I
|
|
xx NOV 2016
|
009-05
|
Temporary Accesses; accomplish
|
II
|
|
xx NOV 2016
|
009-06
|
Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish
|
I
|
|
xx NOV 2016
|
009-07
|
Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish
|
I
|
|
xx NOV 2016
|
009-08
|
Fire Protection at Contractor's Facility; accomplish
|
I
|
|
xx NOV 2016
|
009-09
|
Process Control Procedure (PCP); provide and accomplish
|
II
|
|
xx NOV 2016
|
009-10
|
Asbestos-Containing Material (ACM); control |
|
I
|
|
xx NOV 2016
|
009-11
|
Insulation and Lagging; accomplish |
|
II
|
|
xx NOV 2016
|
009-12
|
Weld, Fabricate, and Inspect; accomplish |
|
II
|
|
xx NOV 2016
|
009-13
|
Meter; repair |
|
II
|
|
xx NOV 2016
|
009-14
|
Gage, Switch, and Thermometer; repair|
|
II
|
|
xx NOV 2016
|
009-15
|
Rotating Machinery; balance
|
II
|
|
xx NOV 2016
|
009-16
|
Electronic Equipment; repair
|
II
|
|
xx NOV 2016
|
009-17
|
Rotating Electrical Equipment; repair
|
II
|
|
xx NOV 2016
|
009-18
|
Magnetic Material; control
|
II
|
|
xx NOV 2016
|
009-19
|
Provisioning Technical Documentation (PTD); provide
|
I
|
|
30 JUL 2015
|
009-20
|
Government Property; control
|
I
|
|
18 JUL 2014
|
009-21
|
Logistics and Technical Data; provide
|
I
|
|
18 JUL 2014
|
009-22
|
Canceled xx NOV 2016
|
|
|
|
009-23
|
Interference; remove and install|
|
I
|
|
xx NOV 2016
|
009-24
|
Shipboard Authorization, Control, Isolation, Blanking, Tagging and Cleanliness Requirements; accomplish
|
I
|
|
xx NOV 2016
|
009-25
|
Structural Boundary Test; accomplish
|
II
|
|
xx NOV 2016
|
009-26
|
Deck Covering; accomplish
|
II
|
|
xx NOV 2016
|
009-27
|
Material Identification and Control (MIC) for Level I System; accomplish |
|
II
|
|
xx NOV 2016
|
009-28
|
Fire Prevention; accomplish |
|
I
|
|
xx NOV 2016
|
009-29
|
Asbestos‑Free Pipe Hanger Liner Material; install
|
I
|
|
29 JUL 2004
|
009-30
|
Boiler Sample Tube; inspect |
|
II
|
|
xx NOV 2016
|
009-31
|
Boiler Waterjet Cleaning; accomplish
|
II
|
|
18 JUL 2014
|
009-32
|
Cleaning and Painting Requirements; accomplish
|
II
|
|
xx NOV 2016
|
009-33
|
Rotating Electrical Equipment; rewind
|
II
|
|
xx NOV 2016
|
009-34
|
Fire Protection of Unmanned Vessels at Contractor's Facility; accomplish
|
I
|
|
xx NOV 2016
|
009-35
|
Canceled xx NOV 2016
|
|
|
|
009-36
|
Controller; repair
|
II
|
|
xx NOV 2016
|
009-37
|
General Procedures for Woodwork; accomplish
|
II
|
|
xx NOV 2016
|
009-38
|
Boiler, Catapult Accumulator, and Reboiler Dry Lay-up; accomplish
|
II
|
|
xx NOV 2016
|
009-39
|
Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish
|
I
|
|
xx NOV 2016
|
009-40
|
Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide |
|
I
|
|
xx NOV 2016
|
009-41
|
Technical Manual Contract Requirement (TMCR) for a Topically Structured Technical Manual; accomplish
|
II
|
|
xx NOV 2016
|
009-42
|
Technical Manual Contract Requirement (TMCR) for Updating Technical Manual; accomplish
|
II
|
|
xx NOV 2016
|
009-43
|
Engineering Plant Production Completion Date (PCD), Light-Off Assessment (LOA) Support; provide
|
II
|
|
30 JUL 2015
|
009-44
|
Cancelled 18 JUL 2014
|
|
|
|
009-45
|
Tapered Plug Valve; repair
|
II
|
|
xx NOV 2016
|
009-46
|
Butterfly Valve, Synthetic and Metal Seated; repair
|
II
|
|
18 JUL 2014
|
009-47
|
Gate Valve; repair
|
II
|
|
xx NOV 2016
|
009-48
|
Pressure Seal Bonnet Valve Shop | Repair; accomplish
|
II
|
|
xx NOV 2016
|
009-49
|
Pressure Seal Bonnet Valve In-line Repair; accomplish
|
II
|
|
xx NOV 2016
|
009-50
|
Horizontal Swing Check Valve; repair
|
II
|
|
xx NOV 2016
|
009-51
|
Globe, Globe Angle, and Globe Stop Check Valve; repair
|
II
|
|
xx NOV 2016
|
009-52
|
Relief Valve; repair
|
II
|
|
xx NOV 2016
|
009-53
|
Bolted Bonnet Steam Valve Shop Repair; accomplish
|
II
|
|
xx NOV 2016
|
009-54
|
Bolted Bonnet Steam Valve In-line Repair; accomplish
|
II
|
|
xx NOV 2016
|
009-55
|
Regulating/Reducing Valve; repair
|
II
|
|
xx NOV 2016
|
009-56
|
Main Propulsion Boiler Wet Lay-up; accomplish
|
II
|
|
xx NOV 2016
|
009-57
|
Reduction Gear Security; | accomplish
|
II
|
|
xx NOV 2016
|
009-58
|
Pump and Driver Shaft Alignment; accomplish
|
II
|
|
01 SEP 2015
|
009-59
|
Organotin Antifouling Material; control
|
II
|
|
xx NOV 2016
|
009-60
|
Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage
|
I
|
|
01 SEP 2015
|
009-61
|
Shipboard Use of Fluorocarbons; control
|
I
|
|
18 JUL 2014
|
009-62
|
Boiler Handhole, Manhole Seat and Plate; inspect |
|
II
|
|
xx NOV 2016
|
009-63
|
Lubricating Oil and Hydraulic Fluid; analyze |
|
II
|
|
xx NOV 2016
|
009-64
|
Synthetic Fire Resistant Hydraulic Fluid; control
|
II
|
|
xx NOV 2016
|
009-65
|
Polychlorinated Biphenyls (PCBs); control
|
I
|
|
29 JUL 2011
|
009-66
|
Cancelled 18 JUL 2014
|
|
|
|
009-67
|
Integrated Total Ship Testing; manage
|
I
|
|
xx NOV 2016
|
009-68
|
Bolted Bonnet Valve; repair
|
II
|
|
29 JUL 2011
|
009-69
|
Heavy Weather/Mooring Plan; provide
|
I
|
|
30 JUL 2015
|
009-70
|
Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish
|
I
|
|
xx NOV 2016
|
009-71
|
Piping Systems; test |
|
II
|
|
xx NOV 2016
|
009-72
|
Physical Security at a Private Contractor Facility; accomplish |
|
I
|
|
xx NOV 2016
|
009-73
|
Shipboard Electrical/Electronic
Cable Procedure; accomplish
|
I
|
|
xx NOV 2016
|
009-74
|
Occupational, Safety and Health Plan; accomplish
|
I
|
|
xx NOV 2016
|
009-75
|
Circuit Breaker; repair
|
II
|
|
xx NOV 2016
|
009-76
|
Waveguide and Rigid Coaxial Lay-Up; accomplish
|
II
|
|
xx NOV 2016
|
009-77
|
Cofferdam Installation; accomplish
|
II
|
|
xx NOV 2016
|
009-78
|
Passive Countermeasures System (PCMS) Material; repair |
|
II
|
|
xx NOV 2016
|
009-79
|
Government Owned Material (GOM) Status; report
|
I
|
|
xx NOV 2016
|
009-80
|
Ship Facilities; maintain
|
I
|
|
xx NOV 2016
|
009-81
|
Compartment Closeout; accomplish
|
I
|
|
xx NOV 2016
|
009-82
|
Installation of Equal Component | Vice Specified Component; report
|
I
|
|
xx NOV 2016
|
009-83
|
Wire Rope Assembly; fabricate |
|
II
|
|
xx NOV 2016
|
009-84
|
Threaded Fastener Requirements; accomplish
|
II
|
|
xx NOV 2016
|
009-85
|
Government Sponsored Planning Yard/Configuration Data Manager (CDM) On-Site Representative Facility; provide
|
II
|
|
19 JUL 2007
|
009-86
|
Recovery and Turn-In of Ozone Depleting substance (ODS); accomplish
|
II
|
|
xx NOV 2016
|
009-87
|
Chemical Disinfection Procedures; accomplish
|
II
|
|
xx NOV 2016
|
009-88
|
Collection, Holding and Transfer (CHT) and Motor Gasoline(MOGAS) Tanks, Spaces, and Piping, including Sewage or MOGAS-Contaminated Tanks, Spaces, and Piping; certify
|
II
|
|
xx NOV 2016
|
009-89
|
Contractor Furnished Anodes(Purchase and Inspect); accomplish
|
I
|
|
xx NOV 2016
|
009-90
|
Technical Representative; provide
|
II
|
|
18 JUL 2014
|
009-91
|
Propeller In-Place Inspection; accomplish
|
II
|
|
xx NOV 2016
|
009-92
|
Resilient Mount; install |
|
II
|
|
xx NOV 2016
|
009-93
|
Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide
|
I
|
|
xx NOV 2016
|
009-94
|
General Environmental Work at Contractor Facility; accomplish |
|
I
|
|
xx NOV 2016
|
009-95
|
Mechanically Attached Fittings (MAFs) for Piping Systems; install
|
II
|
|
xx NOV 2016
|
009-96
|
Ball Valve; repair
|
II
|
|
xx NOV 2016
|
009-97
|
Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide
|
I
|
|
17 JAN 2013
|
009-98
|
Canceled xx NOV 2016
|
|
|
|
009-99
|
Ship Departure Report; provide
|
I
|
|
18 JUL 2014
|
009-100
|
Ship's Stability; maintain |
|
I
|
|
xx NOV 2016
|
009-101
|
Ships Transit and Berthing; accomplish
|
I
|
|
xx NOV 2016
|
009-102
|
Alteration Verification; provide
|
I
|
|
29 JUL 2011
|
009-103
|
Weight and Moment Change Data; provide
|
I
|
|
18 JUL 2014
|
009-104
|
Vibration Testing and Analysis; accomplish
|
II
|
|
18 JUL 2014
|
009-105
|
Thermal Sprayed Coatings for Machinery Component Repair; accomplish
|
II
|
|
xx NOV 2016
|
009-106
|
Work Authorization Form Coordinator (WAFCOR); provide
|
I
|
|
xx NOV 2016
|
009-107
|
Piping System Cleanliness Restoration (Non-Nuclear); accomplish
|
II
|
|
xx NOV 2016
|
009-108
|
Aircraft Carrier Transit and Berthing; accomplish
|
I
|
|
xx NOV 2016
|
009-109
|
Non-SUBSAFE Work on SUBSAFE-Certified Vessels; accomplish |
|
I
|
|
xx NOV 2016
|
009-110
|
Non-Nuclear Work on a Nuclear Vessel; accomplish |
|
I
|
|
xx NOV 2016
|
009-111
|
Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage
|
I
|
|
xx NOV 2016
|
009-112
|
Prevention of Radiographic-Inspection Ionizing-Radiation Hazard; accomplish |
|
II
|
|
xx NOV 2016
|
009-113
|
Rotating Electrical Equipment with a Sealed Insulation Systems (SIS); rewind
|
II
|
|
xx NOV 2016
|
009-114
|
Mold Remediation; accomplish
|
II
|
|
07 NOV 2013
|
009-115
|
Bearing Rebabbitting; accomplish
|
II
|
|
30 JUL 2015
|
009-116
|
Auxiliary and Waste Heat Boiler Sodium Nitrite Wet Lay-up; accomplish
|
II
|
|
30 JUL 2015
|
009-117
|
Combat Systems Light-Off; support
|
I
|
|
xx NOV 2016
|
009-118
|
CG Deck Loading; accomplish
|
I
|
|
18 JUL 2014
|
009-119
|
Cancelled 18 JUL 2014
|
|
|
|
009-120
|
Fact Finding and Critique of Unplanned Event; manage |
|
I
|
|
xx NOV 2016
|
009-121
|
Ship Assessment/Inspection; | accomplish
|
II
|
|
xx NOV 2016
|
009-122
|
Temporary Padeye; install and removal
|
I
|
|
xx NOV 2016
|
009-123
|
Fiber Optic System; remove, relocate, repair, and install
|
I
|
|
xx NOV 2016
|