Naval Sea Systems Command

 

DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE, DISTRIBUTION IS UNLIMITED.

The FY-14 Standard Items and Standard Phraseology shall be invoked for all CNO availabilities with an availability start date in FY-14 and in all other (CMAV and emergent) new procurements issued after 01 June 2013.

Download FY 14 Package

FY 14 Release Letter

FY 14 (CH-1) Release Message

NAVSEA STANDARD ITEMS

Item No.

Title

Utilization Category

Date

009-01

General Criteria; accomplish

I

17 JAN 2013

009-01

(CH-1)

General Criteria; accomplish

I

07 NOV 2013

009-02

Environmental Compliance Reports for Material Usage at Naval Facilities; provide

I

29 JUL 2011

009-03

Toxic and Hazardous Substances; control

I

17 JAN 2013

009-04

Quality Management System; provide

I

17 JAN 2013

009-04

(CH-1)

Quality Management System; provide

I

07 NOV 2013

009-05

Temporary Accesses; provide

I

17 JAN 2013

009-06

Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

I

17 JAN 2013

009-07

Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish

I

17 JAN 2013

009-08

Fire Protection at Contractor's Facility; accomplish

I

17 JAN 2013

009-08

(CH-1)

Fire Protection at Contractor's Facility; accomplish

I

07 NOV 2013

009-09

Process Control Procedure (PCP); provide and accomplish

II

17 JAN 2013

009-09

(CH-1)

Process Control Procedure (PCP); provide and accomplish

II

07 NOV 2013

009-10

Shipboard Asbestos-Containing Material (ACM); control

I

29 JUL 2011

009-11

Insulation and Lagging Requirements; accomplish

II

17 JAN 2013

009-12

Welding, Fabrication, and Inspection Requirements; accomplish

II

17 JAN 2013

009-12

(CH-1)

Welding, Fabrication, and Inspection Requirements; accomplish

II

07 NOV 2013

009-13

Meters; repair and certify calibration

II

17 JAN 2013

009-14

Gages and Thermometers; repair and certify calibration

II

17 JAN 2013

009-15

Rotating Machinery; balance

II

17 JAN 2013

009-16

Electronic Equipment; repair

II

29 JUL 2011

009-17

Rotating Electrical Equipment; repair

II

17 JAN 2013

009-17

(CH-1)

Rotating Electrical Equipment; repair

II

07 NOV 2013

009-18

Magnetic Material; control

I

17 JAN 2013

009-19

Provisioning Technical Documentation (PTD); provide

I

29 JUL 2011

009-20

Government Property; control

I

17 JAN 2013

009-21

Logistics and Technical Data; provide

I

29 JUL 2011

009-22

Shipboard Electric Cable; test

II

17 JAN 2013

009-23

Interferences; remove and install

I

17 JAN 2013

009-24

Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish

I

17 JAN 2013

009-25

Structural Boundary Test; accomplish

II

17 JAN 2013

009-26

Deck Covering Requirements; accomplish

II

17 JAN 2013

009-27

Material Identification and Control (MIC) for Level I Systems; accomplish

II

29 JUL 2011

009-27

(CH-1)

Material Identification and Control (MIC) for Level I Systems; accomplish

II

07 NOV 2013

009-28

Cancelled 30 JUL 2010

009-29

Asbestos-Free Pipe Hanger Liner Material; install

I

29 JUL 2004

009-30

Boiler Sample Tubes; inspect

II

29 JUL 2011

009-31

Boiler Waterjet Cleaning; accomplish

II

29 JUL 2011

009-32

Cleaning and Painting Requirements; accomplish

II

31 JAN 2011

009-32

(CH-1)

Cleaning and Painting Requirements; accomplish

II

07 NOV 2013

009-33

Rotating Electrical Equipment; rewind

II

17 JAN 2013

009-33

(CH-1)

Rotating Electrical Equipment; rewind

II

07 NOV 2013

009-34

Fire Protection of Unmanned Vessels at Contractor's Facility; provide

I

17 JAN 2013

009-35

Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish

I

17 JAN 2013

009-35

(CH-1)

Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish

I

07 NOV 2013

009-36

Controller; repair

II

29 JUL 2011

009-37

General Procedures for Woodwork; accomplish

II

30 JUL 2010

009-38

Boiler, Catapult Accumulator and Reboiler Dry Lay up; accomplish

II

17 JAN 2013

009-39

Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/Component; provide

I

19 JUL 2007

009-40

Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish

I

29 JUL 2011

009-41

Technical Manual Contract Requirement (TMCR) for a Topically Structured Technical Manual; provide

II

19 JUL 2007

009-42

Technical Manual Contract Requirement (TMCR) for Updating Technical Manuals; provide

II

19 JUL 2007

009-43

Light-Off Assessment (LOA) Support for Steam Propulsion System; provide

II

17 JAN 2013

009-44

Light-Off Assessment (LOA) Support for Gas Turbine Propulsion System; provide

II

17 JAN 2013

009-44

(CH-1)

Light-Off Assessment (LOA) Support for Gas Turbine Propulsion System; provide

II

07 NOV 2013

009-45

Tapered Plug Valve; repair

II

29 JUL 2011

009-46

Butterfly Valve, Synthetic and Metal Seated; repair

II

17 JAN 2013

009-47

Gate Valve; repair

II

29 JUL 2011

009-48

Pressure Seal Bonnet Valve; repair (shop)

II

29 JUL 2011

009-49

Pressure Seal Bonnet Valve; repair (in-line)

II

29 JUL 2011

009-50

Horizontal Swing Check Valve; repair

II

29 JUL 2011

009-51

Globe, Globe Angle, and Globe Stop Check Valve; repair

II

17 JAN 2013

009-52

Relief Valve; repair

II

29 JUL 2011

009-53

Bolted Bonnet Steam Valve; repair (shop)

II

29 JUL 2011

009-54

Bolted Bonnet Steam Valve; repair (in-line)

II

30 JUL 2010

009-55

Regulating/Reducing Valve; repair

II

30 JUL 2010

009-56

Main Propulsion Boiler Wet Lay-up; accomplish

II

29 JUL 2011

009-57

Reduction Gear Security Requirements; accomplish

II

17 JAN 2013

009-58

Pump and Driver Shaft Alignment; accomplish

II

17 JAN 2013

009-59

Organotin Antifouling Materials; control

I

29 JUL 2011

009-60

Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage

I

17 JAN 2013

009-60

(CH-1)

Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage

I

07 NOV 2013

009-61

Shipboard Use of Fluorocarbons; control

I

17 JAN 2013

009-62

Boiler Handhole and Manhole Seats and Plates; inspect

II

29 JUL 2011

009-63

Lubricating Oils and Hydraulic Fluids; analyze

II

29 JUL 2011

009-64

Synthetic Fire Resistant Hydraulic Fluid; control

I

29 JUL 2011

009-65

Polychlorinated Biphenyls (PCBs); control

I

29 JUL 2011

009-66

Light-Off Assessment (LOA) Support for Diesel Propulsion System; provide

II

17 JAN 2013

009-67

Integrated Total Ship Testing; manage

I

17 JAN 2013

009-68

Bolted Bonnet Valve; repair

II

29 JUL 2011

009-69

Heavy Weather Plan; provide

I

17 JAN 2013

009-69

(CH-1)

Heavy Weather Plan; provide

I

07 NOV 2013

009-70

Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

I

17 JAN 2013

009-71

Testing Requirements for Piping Systems; accomplish

II

17 JAN 2013

009-72

Physical Security at Private Contractor's Facility; accomplish

I

17 JAN 2013

009-73

Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install

I

17 JAN 2013

009-73

(CH-1)

Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install

I

07 NOV 2013

009-74

Occupational, Safety and Health Requirements; accomplish

I

17 JAN 2013

009-75

Circuit Breaker; repair

II

29 JUL 2011

009-76

Waveguide and Transmission Line Temporary Lay-Up, Pressurization, and Purging; accomplish

II

29 JUL 2011

009-77

Cofferdam Requirements; accomplish

I

17 JAN 2013

009-78

Passive Countermeasures System (PCMS) Material Repair/Installation Requirements; accomplish

II

30 JUL 2010

009-78

(CH-1)

Passive Countermeasures System (PCMS) Material Repair/Installation Requirements; accomplish

II

07 NOV 2013

009-79

Government Owned Material (GOM); status reporting

I

29 JUL 2011

009-80

Ship's Facilities; provide

I

29 JUL 2011

009-81

Compartment Closeout; accomplish

I

17 JAN 2013

009-82

Data Requirements When Installing an Equal Component Vice Specified Component; provide

I

29 JUL 2011

009-83

Wire Rope Fitting Verification; provide

I

17 JAN 2013

009-84

Accountability of Temporary Fasteners; provide

I

17 JAN 2013

009-85

Government Sponsored Planning Yard/Configuration Data Manager (CDM) On-Site Representative Facility; provide

II

19 JUL 2007

009-86

Recovery of Chlorofluorocarbon (CFC's) and Fire Suppressant Halon(H) Materials; accomplish

I

01 AUG 2008

009-87

Chemical Disinfection Procedures; accomplish

I

17 JAN 2013

009-88

Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify

I

29 JUL 2011

009-89

Purchase and Inspection Requirements for Contractor Furnished Anodes; accomplish

I

29 JUL 2011

009-90

Technical Representative; provide

II

17 JAN 2013

009-90

(CH-1)

Technical Representative; provide

II

07 NOV 2013

009-91

Propeller In-Place Inspection; accomplish

II

29 JUL 2011

009-91

(CH-1)

Propeller In-Place Inspection; accomplish

II

07 NOV 213

009-92

Resilient Mount; remove and install

II

29 JUL 2011

009-93

Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

I

17 JAN 2013

009-94

General Environmental Requirements for Work at Contractor's Facility; accomplish

I

17 JAN 2013

009-95

Mechanically Attached Fittings (MAFs) for Piping Systems; install

I

17 JAN 2013

009-96

Ball Valve; repair

II

29 JUL 2011

009-97

Ship Building and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coatings Information; provide

I

17 JAN 2013

009-98

Monel Fasteners; inspect

II

30 JUL 2010

009-99

Ship Departure Report; provide

I

17 JAN 2013

009-100

Ship's Stability Process Control Procedure (PCP); maintain

I

30 JUL 2010

009-101

Requirements for Mooring, Entry to, and Departure from Contractor's Facility; accomplish

I

17 JAN 2013

009-102

Alteration Verification; provide

I

29 JUL 2011

009-103

Weight and Moment Change Data; provide

I

29 JUL 2011

009-104

Vibration Testing and Analysis; accomplish

II

29 JUL 2011

009-105

Thermal Sprayed Coatings for Machinery Component Repair; accomplish

II

17 JAN 2013

009-106

Work Authorization Form Coordinator (WAFCOR); provide

I

17 JAN 2013

009-107

Piping System Cleanliness (Non-Nuclear); accomplish

II

17 JAN 2013

009-108

Aircraft Carrier Requirements for Mooring, Entry to, Movement within, and Departure from Contractor's Facility; accomplish

I

29 JUL 2011

009-109

Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels; accomplish

I

29 JUL 2011

009-110

Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish

I

29 JUL 2011

009-111

Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

I

17 JAN 2013

009-111

(CH-1)

Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

I

07 NOV 2013

009-112

Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish

I

29 JUL 2011

009-113

Rotating Electrical equipment with Sealed Insulation Systems (SIS); rewind

II

17 JAN 2013

009-113

(CH-1)

Rotating Electrical equipment with Sealed Insulation Systems (SIS); rewind

II

07 NOV 2013

009-114

Mold Remediation; accomplish

II

30 JUL 2010

009-114

(CH-1)

Mold Remediation; accomplish

II

07 NOV 2013

009-115

Bearing Rebabbitting; accomplish

II

17 JAN 2013

009-115

(CH-1)

Bearing Rebabbitting; accomplish

II

07 NOV 2013

009-116

Auxiliary and Waste Heat Boiler Sodium Nitrite Wet Lay-up; accomplish

II

29 JUL 2011

009-117

AEGIS Light-Off (ALO) Support for AEGIS Weapons Systems; provide

I

17 JAN 2013

009-118

CG Deck Loading; accomplish

I

17 JAN 2013

SSRAC STANDARD WORK TEMPLATES

077-01

Hazardous Waste Produced On Naval Vessels; control

  17 JAN 2013

992-31

Cleaning and Pumping; accomplish

  19 SEP 2013


Staying Connected