Naval Sea Systems Command

 

DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE, DISTRIBUTION IS UNLIMITED.

The FY15 Standard Items and Standard Phraseology shall be invoked for all CNO availabilities with an availability start date in FY15 and in all other (Continuous Maintenance Availability (CMAV) and emergent) new procurements issued after 1 May 2014.

Download FY 15 Package

Download FY 15 (CH-1) Package

Download FY 15 (CH-2) Package

FY 15 Release Letter

FY 15 (CH-1) Release Message

FY 15 (CH-2) Release Message

NAVSEA STANDARD ITEMS  

Item No.

Title

Utilization Category

Date

INDEX

FY-15 (CH-1) Standard Item Index

009-01

General Criteria; accomplish

I

07 NOV 2013

009-02

Environmental Compliance Reports for Material Usage at Naval Facilities; provide

I

29 JUL 2011

009-03

Toxic and Hazardous Substances; control

I

17 JAN 2013

009-04

Quality Management System; provide

I

07 NOV 2013

009-05

Temporary Accesses; provide

I

17 JAN 2013

009-06

Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

I

17 JAN 2013

009-06

(CH-1)

Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

I

10 JUN 2014

009-07

Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish

I

17 JAN 2013

009-07

(CH-1)

Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish

I

10 JUN 2014

009-08

Fire Protection at Contractor's Facility; accomplish

I

07 NOV 2013

009-08

(CH-1)

Fire Protection at Contractor's Facility; accomplish

I

10 JUN 2014

009-09

Process Control Procedure (PCP); provide and accomplish

II

06 JAN 2014

009-10

Shipboard Asbestos-Containing Material (ACM); control

I

29 JUL 2011

009-11

Insulation and Lagging Requirements; accomplish

II

17 JAN 2013

009-12

Welding, Fabrication, and Inspection Requirements; accomplish

II

07 NOV 2013

009-13

Meters; repair and certify calibration

II

17 JAN 2013

009-14

Gages and Thermometers; repair and certify calibration

II

17 JAN 2013

009-15

Rotating Machinery; balance

II

17 JAN 2013

009-16

Electronic Equipment; repair

II

29 JUL 2011

009-17

Rotating Electrical Equipment; repair

II

07 NOV 2013

009-18

Magnetic Material; control

I

17 JAN 2013

009-19

Provisioning Technical Documentation (PTD); provide

I

29 JUL 2011

009-20

Government Property; control

I

17 JAN 2013

009-21

Logistics and Technical Data; provide

I

29 JUL 2011

009-22

Shipboard Electric Cable; test

II

17 JAN 2013

009-23

Interferences; remove and install

I

17 JAN 2013

009-24

Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish

I

17 JAN 2013

009-24

(CH-2)

Shipboard Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish

I

10 JUL 2015

009-25

Structural Boundary Test; accomplish

II

17 JAN 2013

009-26

Deck Covering Requirements; accomplish

II

17 JAN 2013

009-27

Material Identification and Control (MIC) for Level I Systems; accomplish

II

07 NOV 2013

009-28

(CH-1)

Fire Prevention Requirements; accomplish

I

10 JUN 2014

009-29

Asbestos-Free Pipe Hanger Liner Material; install

I

29 JUL 2004

009-30

Boiler Sample Tubes; inspect

II

29 JUL 2011

009-31

Boiler Waterjet Cleaning; accomplish

II

29 JUL 2011

009-32

Cleaning and Painting Requirements; accomplish

II

07 NOV 2013

009-32

(CH-2)

Cleaning and Painting Requirements; accomplish

II

10 JUL 2015

009-33

Rotating Electrical Equipment; rewind

II

07 NOV 2013

009-34

Fire Protection of Unmanned Vessels at Contractor's Facility; provide

I

17 JAN 2013

009-35

Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish

I

07 NOV 2013

009-35

(CH-1)

Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish

I

10 JUN 2014

009-36

Controller; repair

II

29 JUL 2011

009-37

General Procedures for Woodwork; accomplish

II

30 JUL 2010

009-38

Boiler, Catapult Accumulator and Reboiler Dry Lay up; accomplish

II

17 JAN 2013

009-39

Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/Component; provide

I

19 JUL 2007

009-40

Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish

I

29 JUL 2011

009-41

Technical Manual Contract Requirement (TMCR) for a Topically Structured Technical Manual; provide

II

19 JUL 2007

009-42

Technical Manual Contract Requirement (TMCR) for Updating Technical Manuals; provide

II

19 JUL 2007

009-43

Light-Off Assessment (LOA) Support for Steam Propulsion System; provide

II

17 JAN 2013

009-44

Light-Off Assessment (LOA) Support for Gas Turbine Propulsion System; provide

II

07 NOV 2013

009-45

Tapered Plug Valve; repair

II

29 JUL 2011

009-46

Butterfly Valve, Synthetic and Metal Seated; repair

II

17 JAN 2013

009-47

Gate Valve; repair

II

29 JUL 2011

009-48

Pressure Seal Bonnet Valve; repair (shop)

II

29 JUL 2011

009-49

Pressure Seal Bonnet Valve; repair (in-line)

II

29 JUL 2011

009-50

Horizontal Swing Check Valve; repair

II

29 JUL 2011

009-51

Globe, Globe Angle, and Globe Stop Check Valve; repair

II

17 JAN 2013

009-52

Relief Valve; repair

II

29 JUL 2011

009-53

Bolted Bonnet Steam Valve; repair (shop)

II

29 JUL 2011

009-54

Bolted Bonnet Steam Valve; repair (in-line)

II

30 JUL 2010

009-55

Regulating/Reducing Valve; repair

II

30 JUL 2010

009-56

Main Propulsion Boiler Wet Lay-up; accomplish

II

29 JUL 2011

009-57

Reduction Gear Security Requirements; accomplish

II

17 JAN 2013

009-58

Pump and Driver Shaft Alignment; accomplish

II

17 JAN 2013

009-59

Organotin Antifouling Materials; control

I

29 JUL 2011

009-60

Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage

I

07 NOV 2013

009-61

Shipboard Use of Fluorocarbons; control

I

17 JAN 2013

009-62

Boiler Handhole and Manhole Seats and Plates; inspect

II

29 JUL 2011

009-63

Lubricating Oils and Hydraulic Fluids; analyze

II

29 JUL 2011

009-64

Synthetic Fire Resistant Hydraulic Fluid; control

I

29 JUL 2011

009-65

Polychlorinated Biphenyls (PCBs); control

I

29 JUL 2011

009-66

Light-Off Assessment (LOA) Support for Diesel Propulsion System; provide

II

17 JAN 2013

009-67

Integrated Total Ship Testing; manage

I

17 JAN 2013

009-68

Bolted Bonnet Valve; repair

II

29 JUL 2011

009-69

Heavy Weather Plan; provide

I

07 NOV 2013

009-70

Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

I

17 JAN 2013

009-70

(CH-1)

Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

I

10 JUN 2014

009-71

Testing Requirements for Piping Systems; accomplish

II

17 JAN 2013

009-72

Physical Security at Private Contractor's Facility; accomplish

I

17 JAN 2013

009-73

Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install

I

07 NOV 2013

009-74

Occupational, Safety and Health Requirements; accomplish

I

17 JAN 2013

009-74

(CH-1)

Occupational, Safety and Health Requirements; accomplish

I

10 JUN 2014

009-74

(CH-2)

Occupational, Safety and Health Requirements; accomplish

I

10 JUL 2015

009-75

Circuit Breaker; repair

II

29 JUL 2011

009-76

Waveguide and Transmission Line Temporary Lay-Up, Pressurization, and Purging; accomplish

II

29 JUL 2011

009-77

Cofferdam Requirements; accomplish

I

17 JAN 2013

009-78

Passive Countermeasures System (PCMS) Material Repair/Installation Requirements; accomplish

II

07 NOV 2013

009-79

Government Owned Material (GOM); status reporting

I

29 JUL 2011

009-80

Ship's Facilities; provide

I

29 JUL 2011

009-81

Compartment Closeout; accomplish

I

17 JAN 2013

009-82

Data Requirements When Installing an Equal Component Vice Specified Component; provide

I

29 JUL 2011

009-83

Wire Rope Fitting Verification; provide

I

17 JAN 2013

009-84

Accountability of Temporary Fasteners; provide

I

17 JAN 2013

009-85

Government Sponsored Planning Yard/Configuration Data Manager (CDM) On-Site Representative Facility; provide

II

19 JUL 2007

009-86

Recovery of Chlorofluorocarbon (CFC's) and Fire Suppressant Halon (H) Materials; accomplish

I

01 AUG 2008

009-87

Chemical Disinfection Procedures; accomplish

I

17 JAN 2013

009-88

Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify

I

29 JUL 2011

009-89

Purchase and Inspection Requirements for Contractor Furnished Anodes; accomplish

I

29 JUL 2011

009-90

Technical Representative; provide

II

07 NOV 2013

009-91

Propeller In-Place Inspection; accomplish

II

07 NOV 2013

009-92

Resilient Mount; remove and install

II

29 JUL 2011

009-93

Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

I

17 JAN 2013

009-94

General Environmental Requirements for Work at Contractor's Facility; accomplish

I

17 JAN 2013

009-95

Mechanically Attached Fittings (MAFs) for Piping Systems; install

I

17 JAN 2013

009-96

Ball Valve; repair

II

29 JUL 2011

009-97

Ship Building and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coatings Information; provide

I

17 JAN 2013

009-98

Monel Fasteners; inspect

II

30 JUL 2010

009-99

Ship Departure Report; provide

I

17 JAN 2013

009-100

Ship's Stability Process Control Procedure (PCP); maintain

I

30 JUL 2010

009-101

Requirements for Mooring, Entry to, and Departure from Contractor's Facility; accomplish

I

17 JAN 2013

009-102

Alteration Verification; provide

I

29 JUL 2011

009-103

Weight and Moment Change Data; provide

I

29 JUL 2011

009-104

Vibration Testing and Analysis; accomplish

II

29 JUL 2011

009-105

Thermal Sprayed Coatings for Machinery Component Repair; accomplish

II

17 JAN 2013

009-106

Work Authorization Form Coordinator (WAFCOR); provide

I

06 JAN 2014

009-107

Piping System Cleanliness (Non-Nuclear); accomplish

II

17 JAN 2013

009-108

Aircraft Carrier Requirements for Mooring, Entry to, Movement within, and Departure from Contractor's Facility; accomplish

I

29 JUL 2011

009-109

Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels; accomplish

I

29 JUL 2011

009-110

Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish

I

29 JUL 2011

009-111

Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

I

07 NOV 2013

009-112

Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish

I

29 JUL 2011

009-113

Rotating Electrical equipment with Sealed Insulation Systems (SIS); rewind

II

07 NOV 2013

009-114

Mold Remediation; accomplish

II

07 NOV 2013

009-115

Bearing Rebabbitting; accomplish

II

07 NOV 2013

009-116

Auxiliary and Waste Heat Boiler Sodium Nitrite Wet Lay-up; accomplish

II

29 JUL 2011

009-117

AEGIS Light-Off (ALO) Support for AEGIS Weapons Systems; provide

I

06 JAN 2014

009-118

CG Deck Loading; accomplish

I

17 JAN 2013

009-119

Expanded Process Control Procedure (EPCP); provide and accomplish

II

06 JAN 2014

009-120

Fact Finding and Critique of Unplanned Events; manage

I

06 JAN 2014

009-121

Ship Assessment/Inspection Requirements; provide

I

06 JAN 2014

SSRAC STANDARD WORK TEMPLATES

077-01

Hazardous Waste Produced On Naval Vessels; control

17 JAN 2013

992-31

Cleaning and Pumping; accomplish

19 SEP 2013



Staying Connected