Page Options
Up Arrow
Project Studies: Dallas District

Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.

Location Project Description
Dallas Horseshoe Project Upgrade of the I-30 Bridge, part of the Mixmaster and I-35E bridges
Dallas LBJ-635 Significant improvements to 13 miles of I-635, from I-35E to US 75
Dallas Medical District Drive Finding of no significant impact (FONSI) for widening project from I-35E to Harry Hines Boulevard
Dallas US 75 - SH 121 Interchange
Construction of a US75/SH 121 interchange
Dallas/Denton I-35E Proposed improvements to I-35E from I-635 to US 380
Dallas/Fort Worth SH 183 Proposed improvements to SH 183 (Airport Freeway) in Dallas, Irving and Fort Worth.
Dallas/Fort Worth TEXpress Lanes Addition of TEXpress managed lanes in the Dallas/Fort Worth area
East Texas
I-20 East Texas Corridor Evaluation of current safety and capacity needs from Dallas to the Louisiana border