Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.

Location Project Phase Description
Beaumont I-10 at Major Drive
Construction
Reconstruct intersection and widen Major Drive
Beaumont US 69 Ramp Project Construction
Reverse, relocate and construct new ramps
Jasper
US 190 Bridge
Construction Replace bridge on US 190 at east bank of the Steinhagen Reservoir in Jasper County
Old River-Winfree FM 1409 Extension Construction Provide a continuous link between Old River-Winfree, I-10 and FM 565