Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.
Location | Project | Phase | Description |
Beaumont | I-10 at Major Drive |
Construction |
Reconstruct intersection and widen Major Drive |
Beaumont | US 69 Ramp Project | Construction |
Reverse, relocate and construct new ramps |
Jasper |
US 190 Bridge |
Construction | Replace bridge on US 190 at east bank of the Steinhagen Reservoir in Jasper County |
Old River-Winfree | FM 1409 Extension | Construction | Provide a continuous link between Old River-Winfree, I-10 and FM 565 |