The purpose of this project is to identify a potential route or routes for SH 249 between Todd Mission and Navasota.
A recommended study area for the proposed project was presented at an open house in October 2013. More than 230 people attended and we received over 40 comments. Based on comments from the open house, TxDOT identified additional environmental constraints for design considerations. An evaluation process was started to identify and compare potential routes with the project purpose and needs.
Six alternatives were presented at the open house on April 3, 2014. Alignment B3 was recommended to be compared to the no-build alternative. After considering comments and input received during the study, a hybrid alignment combining alternatives B and C is now preferred. This preferred alignment will be presented at a public hearing in summer 2015.
Benefits
The proposed improvements are expected to provide the following, as outlined in the purpose and needs identified by the SH 249 Working Group:
Get Involved
Next Steps
Downloads
Contact Us
Director of Transportation Planning and Development
TxDOT Bryan District
2591 N. Earl Rudder Freeway
Bryan, TX 77803
Phone: (979) 778-9727
Fax: (979) 778-9702
Email