The scope of this study is a 6.5-mile section of FM 2978 from Conroe-Hufsmith Road to FM 1488 in Montgomery County.
Current Conditions
The current road is undivided with two 12-foot travel lanes, 7.5-foot outside shoulders and open ditches.
Proposed Improvements
The proposed project consists of the following:
No displacements are anticipated; 17.09 acres of new right of way is required for detention ponds.
Partners
This study is a partnership between TxDOT and the Federal Highway Administration.