The expansion of Business 46 (Walnut Street) from Kerlick Lane to Landa Street in New Braunfels is needed to improve mobility on this section of roadway. Proposed improvements include the following:

  • Kerlick Lane to Grandview Street: Widen to a four-lane facility with a continuous center turn lane
  • Floral Street to Landa Street: Widen to a four-lane facility with a continuous center turn lane
  • Grandview Street to Floral Street: Widen to a four-lane facility with a 4-foot flush median

The project would also add curb and sidewalk to accommodate pedestrians and bikes, provide a potential noise wall in front of Ridgecrest Condominiums pending landowner approval, and include drainage. A 25-foot-high retaining wall will be required to widen the road towards the canyon for a 2,000-foot stretch in the “down the hill” section of the project.

This project, if approved, will use State Proposition 12 funds. The estimated construction cost of the proposed project is approximately $8.7 million. The anticipated letting date for the project is August 2013 with a projected duration of 12 months.

More Information

Public Meeting - 05/31/12

Contact Us

Laura Lopez
(210) 615-5839
P.O. Box 29928
4615 NW Loop 410
San Antonio, TX 78229-0928
Email