Page Options
Up Arrow
Project Studies: Tyler District

Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.

Location Project Description
Lindale FM 16 Widening the roadway from four miles west of FM 849 to US 69
Lindale
US 69 / Loop 49 Lindale Reliever Proposed roadway around the City of Lindale
East Texas
I-20 East Texas Corridor Evaluation of current safety and capacity needs from Dallas to the Louisiana border
Tyler
Spur 248 Improvements to Spur 248 between Old Omen Road and SH 64 east of Tyler to help the City of Tyler expand the east-west corridor in anticipation of future growth
Tyler
FM 2493
Traffic and safety improvements between FM 2813 and FM 346