The scope of this study is a 6.8 mile span of US 90A in Fort Bend County that runs from State Highway (SH) 6 to Loop 762.

Current Conditions

The current roadway has 4 lanes and has an average right-of-way width of 175 feet. Drainage is primarily open ditches with short section of curb-and-gutter between Cunningham Creek drive and SH 99.

Proposed Improvements

Proposed improvements between SH 6 and SH 99 include: 

  • Expand to 8-lane divided roadway with raised media
  • Curb-and-gutter drainage
  • About a half acre of right-of-way would be required at various points along southern edge of existing right-of-way

Proposed improvements between SH 99 and Loop 762 include:

  • A 6-lane divided roadway with raised median
  • Existing drainage to be maintained

No commercial or residential displacements are anticipated.

Partners

This study is a partnership between TxDOT and the Federal Highway Administration
 

Contact Us

Pat Henry, P.E.
TxDOT Houston District
PO Box 1386
Houston, TX 77k251-1386
Phone: (713) 802-5241
Email