Page Options
Up Arrow

The scope of this study is 2.9 miles of State Highway (SH) 36 from US 59 to Farm-to-Market (FM) 2218 in Rosenberg.

Current Conditions

It is currently a 2-line undivided roadway.

Proposed Improvements

Widening to a 4-lane divided roadway within the existing right-of-way has been proposed.

Partners

This study is a partnership between TxDOT and the Federal Highway Administration.

Public Involvement:

Contact Us

Pat Henry, P.E.
TxDOT Houston District
PO Box 1386
Houston, TX 77251-1386
Phone: (713) 802-5241
Email