Projects and Studies: Bryan District

Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.

Location Project/Study Description
Brazos County SH 6 Ramp Improvement Project
Proposal to reverse the ramps between Boonville Road (FM 158) and SH 21
Brazos, Grimes and Washington counties SH 105 Bridge Project Replace the existing SH 105 bridges across the Navasota and Brazos Rivers and Coles Creek
College Station FM 60 Intersection Project Improvements to the intersection of Raymond Stotzer Parkway (FM 60), University Drive (FM 60) and Harvey Mitchell Parkway (FM 2818)
College Station FM 2347 Project Improvements to the intersection of George Bush Drive, Wellborn Road and the Union Pacific Railroad
College Station FM 2818 Widening Project Increase capacity from a four-lane divided roadway to a six-lane divided freeway from University Drive (FM 60) to George Bush Drive (FM 2347)
Grimes County SH 249 Project Identify potential route or routes between Todd Mission and Navasota
Madison County SH 21 West Madison County Increase capacity from a two-lane undivided roadway to a four-lane divided roadway
Madisonville SH 21 Relief Route Feasibility Study A relief route is being studied to increase mobility
Walker County I-45 Central Walker County Project
Widen interstate to six lanes and other various improvements
Walker County I-45 South Walker County Project
Widen interstate to six lanes and other various improvements