The scope of this study is a 3.27-miles section of Farm-to-Market (FM) 529 from Greenhouse Road to Grand Parkway.
Current Conditions
The current road is undivided with two 12-foot travel lanes.
Proposed Improvements
Partners
This study is a partnership between TxDOT and the Federal Highway Administration.
Contact Us
Texas Department of Transportation
Lisa Lathem
PO Box 1386
Houston, TX 77251-1386
Phone: (713) 802-5246
Email