Study Description
The scope of this project is for roadway widening.
Current Conditions
The current road is undivided with two 10-foot travel lanes and open ditches for the length of the project, 2.8 miles.
Proposed Improvements
Partners
This project is a partnership between the City of Pearland and TxDOT.